TD公司投標(biāo)決策模型和投標(biāo)策略的研究
[Abstract]:The Government work report of the third session of the Twelfth National people's Congress points out that the railway investment in 2015 is more than 800 billion yuan, and the mileage of new construction is more than 8000 kilometers. Today, when the situation of railway construction is very good, it has provided railway supervision companies with greater space for bidding and management activities. In the past three years, TD supervision companies have also participated in the bids for many projects, but the rate of winning bids is very low, and the management is in trouble. Therefore, according to the characteristics of the supervision bidding work and the current bidding situation of TD Company, this paper plans to do the following research: (1) according to the current bidding situation of the TD Supervision Company, The problems existing in the bidding work of the company and their causes are analyzed. (2) the experts in the railway engineering supervision industry make the questionnaire that affects the decision-making factors of the railway project supervision bidding, and the main factors affecting the decision-making are analyzed statistically. (3) the fuzzy hierarchy comprehensive evaluation method is used to transform the qualitative problem in the bidding decision of railway engineering supervision into a quantitative one, and then the evaluation is carried out. A bidding decision-making model based on fuzzy hierarchical comprehensive evaluation method is constructed to make a scientific bidding decision. (4) aiming at the present bidding situation of TD supervision company, The plan designs scientific quotation strategy and standardized bidding process strategy. (5) the constructed bidding decision model of railway project supervision is applied in the construction supervision project of newly built Wu Zhong to Zhongwei railway project. The rationality and feasibility of the model are tested. Through the research of the above several aspects, this paper sets up a complete set of scientific and reasonable bidding decision for TD Company to help it improve the winning rate, save the cost, and popularize it within the group company.
【學(xué)位授予單位】:中國科學(xué)院大學(xué)(工程管理與信息技術(shù)學(xué)院)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2016
【分類號】:F284
【相似文獻】
相關(guān)期刊論文 前10條
1 趙敏;;淺析影響投標(biāo)決策的因素[J];經(jīng)營管理者;2010年18期
2 金城;談投標(biāo)決策[J];遼寧稅務(wù)高等?茖W(xué)校學(xué)報;2001年06期
3 求索,胡季英;影響投標(biāo)決策的典型因素[J];建筑管理現(xiàn)代化;2003年04期
4 李改榮;施工企業(yè)經(jīng)營管理與投標(biāo)決策[J];科技情報開發(fā)與經(jīng)濟;2004年10期
5 曾學(xué)禮;;線性規(guī)劃法在項目投標(biāo)決策中的應(yīng)用[J];當(dāng)代經(jīng)濟;2006年11期
6 劉軍;;關(guān)于施工企業(yè)投標(biāo)決策的探討[J];科技資訊;2008年10期
7 李健;王宏濤;胡文峰;;淺談工程投標(biāo)決策[J];河南建材;2009年01期
8 宋會雙;;淺析工程投標(biāo)決策方略[J];科技風(fēng);2009年18期
9 王偉;;淺談工程投標(biāo)決策[J];科技信息;2010年16期
10 周建仁;對工程投標(biāo)決策的淺識[J];隧道建設(shè);1994年01期
相關(guān)會議論文 前1條
1 鄧貴仕;白曉宏;;開放式逢低買入中買家數(shù)量確定的投標(biāo)決策[A];第十屆中國管理科學(xué)學(xué)術(shù)年會論文集[C];2008年
相關(guān)重要報紙文章 前1條
1 劉文武 馬廣飛;淺談工程投標(biāo)信息采集及其作用[N];西藏日報;2004年
相關(guān)碩士學(xué)位論文 前10條
1 劉U,
本文編號:2236486
本文鏈接:http://sikaile.net/jingjilunwen/hongguanjingjilunwen/2236486.html