成都金融城建設(shè)工程項(xiàng)目風(fēng)險(xiǎn)管理研究
[Abstract]:In recent decades, China's national economy has been developing at a high speed, thus promoting the process of urbanization and new rural construction and other national key projects are also accelerating the pace of these from the current blowout of real estate development can be seen. Construction projects generally have the characteristics of huge cost, long cycle, more participants and complicated interests involved. Because of uncertainties in the progress of the project, and the complexity of these aspects will increase the probability of potential risks. In order to ensure the safety and smoothness of construction projects. In order to pursue the maximum benefit, it is necessary for the project participants to have a clear and detailed grasp of the source, nature, hazards and the severity of possible impacts of the potential risks of the project, and to formulate reasonable and effective measures to avoid the storm on the basis of the planned completion and good quality of the project. Risk.
The research on project risk management in China is still in its infancy, and there is still a long way to go in both theoretical and practical engineering application. This paper takes the construction project of Chengdu City as an example. On the basis of learning and understanding the relevant theory of project risk management, qualitative, quantitative, normative, empirical and other aspects are adopted. The method is analyzed, and the risk identification, evaluation, prevention and other aspects of the project are explained in detail based on engineering examples. The method and steps adopted in project risk management are summarized, and the concrete countermeasures and monitoring measures are put forward. Finally, the risk of the project is evaluated by AHP, which verifies the rationality of the study in this paper. The contents described in this paper can provide reference for theoretical research and practical engineering applications in this field.
【學(xué)位授予單位】:電子科技大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2013
【分類號(hào)】:TU712
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 鄭旺;;淺談工程施工進(jìn)度的影響因素及其控制管理[J];才智;2010年23期
2 楊久林;承包商工程施工的合同風(fēng)險(xiǎn)與評(píng)審[J];重慶建筑;2004年02期
3 史嘯虎;香港工程市場上的聯(lián)合承包[J];國際經(jīng)濟(jì)合作;2000年09期
4 嚴(yán)復(fù)海;黨星;顏文虎;;風(fēng)險(xiǎn)管理發(fā)展歷程和趨勢(shì)綜述[J];管理現(xiàn)代化;2007年02期
5 劉健暉;岳金桂;;工程項(xiàng)目風(fēng)險(xiǎn)管理及其在我國的發(fā)展[J];甘肅農(nóng)業(yè);2006年05期
6 陳磊;關(guān)于在我國建立工程項(xiàng)目風(fēng)險(xiǎn)管理制度的思考[J];基建優(yōu)化;2002年02期
7 王志;工程項(xiàng)目風(fēng)險(xiǎn)管理規(guī)劃與控制探討[J];基建優(yōu)化;2002年06期
8 武永花;;經(jīng)濟(jì)學(xué)的分析方法——實(shí)證分析和規(guī)范分析[J];價(jià)值工程;2008年03期
9 胡建華;建筑項(xiàng)目聯(lián)營承包實(shí)踐對(duì)我國承建商的借鑒[J];建筑經(jīng)濟(jì);2003年02期
10 戚安邦;多要素項(xiàng)目集成管理方法研究[J];南開管理評(píng)論;2002年06期
相關(guān)碩士學(xué)位論文 前2條
1 陳硯祥;建筑承包商在施工過程中的風(fēng)險(xiǎn)研究[D];鄭州大學(xué);2003年
2 劉海峰;大型工程項(xiàng)目風(fēng)險(xiǎn)評(píng)價(jià)及管理研究[D];天津大學(xué);2003年
本文編號(hào):2222476
本文鏈接:http://sikaile.net/jingjilunwen/fangdichanjingjilunwen/2222476.html