淺談旋挖樁施工工藝在房地產(chǎn)開發(fā)中的選擇與應用
本文選題:旋挖樁 切入點:合同工期 出處:《住宅產(chǎn)業(yè)》2016年11期
【摘要】:正前言基礎工程在整個項目的開發(fā)過程中占有舉足輕重的地位,而樁基子分部工程又是基礎工程的主要內(nèi)容。樁基工程有著看不見、摸不著的弊端,存在許多的不確定因素,對項目的質(zhì)量、工期、造價、安全管理都產(chǎn)生很大影響。因此,一般在施工前建設單位都會詳細分析利弊優(yōu)劣,選擇最佳方案。工程概況:項目地處南京主城區(qū),占地面積28000平方米,單體總層數(shù)為18層,工程總樁數(shù)734根,施工合同工期要求60天。項
[Abstract]:The foundation engineering plays an important role in the development of the whole project, and the pile subdivision project is the main content of the foundation engineering.There are many indeterminate factors in pile foundation engineering, which have great influence on project quality, time limit, cost and safety management.Therefore, generally before construction units will analyze the pros and cons in detail, choose the best scheme.General situation of the project: the project is located in the main urban area of Nanjing, covering an area of 28000 square meters, the total number of single floors is 18, the total number of piles in the project is 734, and the construction contract period requires 60 days.Item
【作者單位】: 江蘇愛濤置業(yè)有限公司;
【分類號】:TU753.3
【相似文獻】
相關期刊論文 前10條
1 趙金祥;;淺析旋挖樁機施工的優(yōu)缺點[J];西部探礦工程;2010年04期
2 黎永祺;;旋挖樁施工中常見技術問題及對策分析[J];現(xiàn)代裝飾(理論);2011年07期
3 張洋;;旋挖樁施工當中常遇的技術問題與解決對策[J];中華建設;2012年04期
4 彭文;旋挖樁機[J];建筑機械;1996年08期
5 王寧川;;旋挖樁施工中的優(yōu)勢與常見技術問題分析及應對方法研究[J];門窗;2014年02期
6 談妙泉;張錄林;黃勇;汪發(fā)文;;旋挖樁機和旋挖樁工藝市場發(fā)展初探[J];資源環(huán)境與工程;2007年05期
7 劉欣良;戴洪軍;韋華;;旋挖樁在電力工程中的應用[J];武漢大學學報(工學版);2007年S1期
8 王康妍;;旋挖樁的施工體會[J];廣東科技;2009年10期
9 虞祥;;淺析旋挖樁在基礎施工中的應用[J];科技創(chuàng)新導報;2009年30期
10 黃永倫;;結(jié)合實例淺析旋挖樁施工技術[J];廣東科技;2010年10期
相關會議論文 前1條
1 單明;舒昭然;劉忠昌;;恒隆市府廣場大直徑旋挖樁承載力試驗研究[A];第二屆全國工程結(jié)構(gòu)抗震加固改造技術交流會論文集[C];2010年
相關碩士學位論文 前1條
1 王招洪;旋挖樁法施工及檢測管理方法研究[D];華南理工大學;2013年
,本文編號:1728829
本文鏈接:http://sikaile.net/jingjilunwen/fangdichanjingjilunwen/1728829.html