煙臺(tái)天越灣小區(qū)建設(shè)項(xiàng)目成本控制研究
本文選題:項(xiàng)目成本控制 切入點(diǎn):目標(biāo)成本 出處:《中國海洋大學(xué)》2014年碩士論文
【摘要】:本文就天越灣小區(qū)高檔高層住宅建設(shè)項(xiàng)目為研究對(duì)象,討論該項(xiàng)目的成本控制,為房地產(chǎn)建設(shè)項(xiàng)目的成本控制提供了一種參考。而且也是成本控制理論和方法的應(yīng)用,具有較好的操作性和實(shí)用性。本文利用文獻(xiàn)法、實(shí)地調(diào)查法以及定量分析方法,以H建設(shè)集團(tuán)角度,在項(xiàng)目成本管理理論及綜述的基礎(chǔ)上,分析該項(xiàng)目建設(shè)的背景,并詳細(xì)介紹該項(xiàng)目的有關(guān)概況,為本文分析該項(xiàng)目成本構(gòu)成、WBS分解做鋪墊;并利用項(xiàng)目成本構(gòu)成部分和WBS分解圖,估算了該項(xiàng)目的目標(biāo)成本,并將其目標(biāo)成本按照工程工序進(jìn)行了分解。然后基于項(xiàng)目目標(biāo)成本及其成分分解,采用工程價(jià)值理論和掙值法,從項(xiàng)目招投標(biāo)階段、項(xiàng)目施工階段和竣工結(jié)算階段論述了該項(xiàng)目成本控制過程和成本控制方法,提出了該項(xiàng)目在成本控制中出現(xiàn)的問題,最后針對(duì)這些問題提出了相關(guān)建議。本文結(jié)論主要有:(1)利用目標(biāo)利潤計(jì)算出目標(biāo)成本,并根據(jù)項(xiàng)目建設(shè)工序和成本結(jié)構(gòu)對(duì)目標(biāo)成本進(jìn)行分解,使其成為掙值法計(jì)算中的預(yù)算成本;(2)將目標(biāo)成本法和掙值法結(jié)合,找出實(shí)際成本超支的原因是進(jìn)度拖延還是其他原因,并給予糾正策略;(3)利用價(jià)值工程法選出與建設(shè)單位合作的分包單位;(4)注意竣工結(jié)算過程中的審計(jì)、合同糾紛管理;(5)將目標(biāo)利潤控制在一個(gè)區(qū)間內(nèi),從而計(jì)算出目標(biāo)成本區(qū)間、各類成本(含直接材料、直接人工、制造費(fèi)用)區(qū)間、每個(gè)工序的成本區(qū)間,以便增強(qiáng)成本控制的靈活性。在分配成本考核目標(biāo)時(shí),也可以設(shè)置一個(gè)成本考核區(qū)間,增強(qiáng)成本考核的合理性。(6)完善項(xiàng)目成本控制制度,例如成本控制考核體系、物資保管問題、安全問題等。本文創(chuàng)新之處在于:(1)本文將價(jià)值工程理論、掙值法與目標(biāo)成本法應(yīng)用到項(xiàng)目成本控制中,應(yīng)用性較強(qiáng),能夠?yàn)槠渌惞こ探ㄔO(shè)項(xiàng)目成本控制提供參考。(2)為目標(biāo)成本設(shè)置了一個(gè)區(qū)間,提高了成本控制的靈活性。
[Abstract]:This paper discusses the cost control of the high-grade high-rise residential building project in Tianyue Bay district and provides a reference for the cost control of the real estate construction project.It is also the application of cost control theory and method, which has good operability and practicability.In this paper, the background of the project construction is analyzed from the viewpoint of H construction group, based on the theory and summary of project cost management, with the methods of literature, field investigation and quantitative analysis, and the general situation of the project is introduced in detail.In this paper, the cost components of the project are analyzed, and the target cost of the project is estimated by using the project cost component and the WBS decomposition diagram, and the target cost is decomposed according to the engineering process.Then, based on the decomposition of the project objective cost and its components, the project cost control process and the cost control method are discussed from the project bidding stage, the project construction stage and the completion settlement stage by using the engineering value theory and earned value method.The problems in cost control of the project are put forward, and some suggestions are put forward.The main conclusions of this paper are as follows: (1) the target cost is calculated by using the target profit, and the target cost is decomposed according to the construction procedure and cost structure of the project, so that it becomes the budget cost in the calculation of earned value method.Find out whether the actual cost overruns are due to delays in progress or other reasons, and give corrective strategies to select subcontractors cooperating with construction units using the value engineering method to pay attention to the audit during the completion of the settlement process.By controlling the target profit within an interval, we can calculate the target cost interval, all kinds of cost (including direct material, direct labor, manufacturing cost), and the cost interval of each process.In order to enhance the flexibility of cost control.When allocating the cost assessment target, we can also set up a cost assessment interval to enhance the rationality of the cost assessment. 6) perfect the project cost control system, such as the cost control assessment system, the material storage problem, the safety problem and so on.The innovation of this paper lies in the application of value engineering theory, earned value method and target cost method to project cost control.It can provide a reference for the cost control of other similar construction projects. It sets an interval for the target cost and improves the flexibility of cost control.
【學(xué)位授予單位】:中國海洋大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:TU723.3
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 劉泳宇;;淺談南寧金禾灣東住宅小區(qū)項(xiàng)目成本控制經(jīng)驗(yàn)[J];廣西城鎮(zhèn)建設(shè);2007年10期
2 董金玲;解增海;;項(xiàng)目成本控制的方法[J];黑龍江科技信息;2008年35期
3 鄭述杰;;淺談施工階段項(xiàng)目成本控制[J];民營科技;2009年03期
4 魏純?nèi)A;郭為民;;淺析施工階段的成本控制[J];黑龍江科技信息;2009年17期
5 朱哲;;施工階段成本控制的思考[J];裝備制造;2009年08期
6 吳蓉;;加強(qiáng)項(xiàng)目成本控制 提高企業(yè)經(jīng)濟(jì)效益[J];科技信息;2009年30期
7 鄧持友;;施工企業(yè)在施工階段成本控制的探討[J];民營科技;2009年12期
8 馮彥;;淺析施工階段成本控制的重要性[J];山西建筑;2010年24期
9 李來倉;;站改項(xiàng)目的成本控制[J];山西建筑;2012年02期
10 劉良生;趙山;張冬華;;論述公路工程施工項(xiàng)目成本控制的有效途徑[J];科學(xué)之友;2012年06期
相關(guān)會(huì)議論文 前10條
1 張小燕;熊德彬;;項(xiàng)目成本控制的關(guān)鍵[A];土木建筑學(xué)術(shù)文庫(第8卷)[C];2007年
2 曹程;梁廣輝;;淺析企業(yè)施工階段的成本控制[A];土木建筑學(xué)術(shù)文庫(第13卷)[C];2010年
3 范承;魏寧;;施工企業(yè)項(xiàng)目成本控制制度淺析[A];河南省土木建筑學(xué)會(huì)2010年學(xué)術(shù)大會(huì)論文集[C];2010年
4 盧俊紅;冶偉峰;;淺析施工企業(yè)施工階段的成本控制[A];河南省土木建筑學(xué)會(huì)2010年學(xué)術(shù)研討會(huì)論文集[C];2010年
5 魏志文;;施工各階段成本控制要點(diǎn)分析[A];河南省土木建筑學(xué)會(huì)2009年學(xué)術(shù)大會(huì)論文集[C];2009年
6 宋廣州;張占峰;;項(xiàng)目成本控制的探討[A];土木建筑學(xué)術(shù)文庫(第16卷)[C];2012年
7 張麗;劉軍;;如何在施工項(xiàng)目管理中進(jìn)行成本控制[A];土木建筑學(xué)術(shù)文庫(第13卷)[C];2010年
8 金曉艷;喬全來;;淺談建筑施工中的項(xiàng)目成本控制[A];河南省建筑業(yè)行業(yè)優(yōu)秀論文集(2006)[C];2006年
9 武冰;;市政道路工程中的成本控制[A];河南省土木建筑學(xué)會(huì)2009年學(xué)術(shù)年會(huì)論文集[C];2009年
10 鐘力;;淺議項(xiàng)目成本控制[A];會(huì)計(jì)理論研究——湖北省會(huì)計(jì)學(xué)會(huì)1996—2002年優(yōu)秀會(huì)計(jì)論文集[C];2002年
相關(guān)重要報(bào)紙文章 前10條
1 通訊員 向遠(yuǎn);中遠(yuǎn)香港集團(tuán)狠抓成本控制工作[N];中國遠(yuǎn)洋報(bào);2012年
2 通訊員 劉萌;打響成本控制保衛(wèi)戰(zhàn)[N];中國遠(yuǎn)洋報(bào);2012年
3 張奎;安徽礦機(jī)鑄造分公司 成本控制“算得精”[N];中國建材報(bào);2014年
4 曉勇 海龍 星辦;成本控制大有可為[N];中國遠(yuǎn)洋報(bào);2000年
5 牛平;戰(zhàn)略、方法與步驟——成本控制的整體規(guī)劃[N];經(jīng)理日?qǐng)?bào);2006年
6 浙江泰舜建設(shè)有限公司 王建祥邋楊煥堯;芻議項(xiàng)目成本控制管理[N];建筑時(shí)報(bào);2007年
7 朱以師;成本控制要“先下手為強(qiáng)”[N];中國房地產(chǎn)報(bào);2009年
8 通訊員 劉萌;大遠(yuǎn)著力打造成本控制文化[N];中國遠(yuǎn)洋報(bào);2010年
9 煙臺(tái)市財(cái)政局 王宏志;成本控制面臨挑戰(zhàn),我國企業(yè)如何應(yīng)對(duì)[N];中國會(huì)計(jì)報(bào);2010年
10 山西大學(xué) 李志強(qiáng);在市場(chǎng)經(jīng)濟(jì)條件下,更應(yīng)重視企業(yè)的成本控制[N];山西日?qǐng)?bào);2011年
相關(guān)博士學(xué)位論文 前2條
1 韓l毲,
本文編號(hào):1684003
本文鏈接:http://sikaile.net/jingjilunwen/fangdichanjingjilunwen/1684003.html