【摘要】:中國高校在快速發(fā)展,越來越多的高校明確提出“創(chuàng)建世界一流大學(xué)”的目標(biāo),與之對應(yīng)的卻是高校后勤服務(wù)的相對滯后。高校后勤社會化改革已經(jīng)持續(xù)走過十年有余,雖然在實(shí)體模式、經(jīng)營模式等多方面取得了一大批成果,但當(dāng)前卻走進(jìn)了瓶頸期,關(guān)鍵就在于人力資源改革。 本論文正是針對上述問題,以U大學(xué)后勤集團(tuán)HR改革試點(diǎn)項(xiàng)目為研究對象,應(yīng)用項(xiàng)目管理中范圍管理和時間管理相關(guān)理論,研究項(xiàng)目范圍管理和時間管理理論、方法、工具在本項(xiàng)目實(shí)施過程中的應(yīng)用。 首先,理論闡述了范圍管理、時間管理和人力資源管理;介紹了項(xiàng)目實(shí)施背景等情況。 其次,重點(diǎn)研究項(xiàng)目如何進(jìn)行范圍規(guī)劃、定義、制作WBS、控制和核實(shí)等范圍管理過程。通過制定項(xiàng)目章程、范圍說明書、范圍管理計(jì)劃等完成改革項(xiàng)目的目標(biāo)、成果、進(jìn)度等規(guī)劃;通過細(xì)致分析項(xiàng)目完成改革項(xiàng)目的成果和里程碑具體定義;通過制作工作分解結(jié)構(gòu)完成改革項(xiàng)目整體的工作包分解和重難點(diǎn)工作的二次分解;最后對比章程等文件核實(shí)了改革試點(diǎn)項(xiàng)目的成果——人力資源管理體系文件,包含崗位清單、崗位說明書、崗位編制、人員招聘、員工培訓(xùn)、績效管理、薪酬管理、勞動關(guān)系管理等系列文件;在范圍管理過程中啟用變更申請程序控制項(xiàng)目變化。 再次,重點(diǎn)研究項(xiàng)目如何進(jìn)行活動定義、排序、資源估算、時間估算、進(jìn)度表制定、進(jìn)度控制等時間管理過程。通過編制活動清單和責(zé)任矩陣表完成改革項(xiàng)目的活動定義和資源安排;通過繪制單代號網(wǎng)絡(luò)圖完成改革項(xiàng)目活動排序工作;通過編制活動時間估算列表完成改革項(xiàng)目各個活動的時間估算和總工期估算;通過繪制甘特圖完成不同詳細(xì)程度的項(xiàng)目進(jìn)度描述;通過使用甘特圖比較法展示和全程控制改革項(xiàng)目進(jìn)展,配合進(jìn)度報表向全體干系人通報項(xiàng)目進(jìn)展。 最后,,總結(jié)項(xiàng)目研究成果。通過采用項(xiàng)目管理的科學(xué)方法,清水河校區(qū)物管中心在繁重工作的同時順利完成了改革試點(diǎn)。在范圍和時間管理兩方面,這種工作模式具有一定的參考價值,成為高校后勤實(shí)施人力資源改革的又一個新方法。
[Abstract]:With the rapid development of colleges and universities in China, more and more colleges and universities have clearly put forward the goal of "establishing world-class universities", which corresponds to the relative lag of logistics services in colleges and universities. The reform of logistics socialization in colleges and universities has been going on for more than ten years. Although a large number of achievements have been made in many aspects, such as entity mode and management mode, the reform of human resources is the key. Aiming at the above problems, this paper takes the HR reform pilot project of U University Logistics Group as the research object, applies the theory of scope management and time management in project management, and studies the theory and method of project scope management and time management. The application of tools in the implementation of this project. First of all, the paper describes scope management, time management and human resource management, and introduces the background of project implementation. Secondly, focus on scope planning, definition, WBS, control and verification. Through the formulation of the project charter, scope statement, scope management plan to complete the objectives of the reform project, results, progress and other planning; through detailed analysis of the project to complete the reform project results and milestones specific definition; The work package decomposition of the whole reform project and the quadratic decomposition of the heavy and difficult work are accomplished by making the work decomposition structure. Finally, comparing the articles of association and other documents, it verifies the results of the reform pilot project-human resources management system documents, including job list, job description, post establishment, personnel recruitment, staff training, performance management, compensation management, Labor relations management and other series of documents; Enable change application during scope management to control project changes. Thirdly, it focuses on how to define, sort, estimate resources, estimate time, make schedule, control progress and so on. Activity definition and resource arrangement for reform projects are completed by preparing activity lists and responsibility matrix tables; sequencing of reform project activities is completed by drawing up single code network diagrams; Complete the time estimation and total duration estimation of each activity of the reform project by compiling the activity time estimate list, complete the description of the project schedule with varying degrees of detail by drawing the Gantt chart; By using the Gantt chart comparison method to show and control the progress of the reform project, report the progress of the project to all stakeholders with the progress report. Finally, the research results of the project are summarized. By adopting the scientific method of project management, Qingshuihe Campus material Management Center has successfully completed the reform pilot while carrying out heavy work. In terms of scope and time management, this work model has certain reference value and has become another new method to carry out the reform of human resources in colleges and universities.
【學(xué)位授予單位】:電子科技大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2013
【分類號】:G647.4
[Abstract]:With the rapid development of colleges and universities in China, more and more colleges and universities have clearly put forward the goal of "establishing world-class universities", which corresponds to the relative lag of logistics services in colleges and universities. The reform of logistics socialization in colleges and universities has been going on for more than ten years. Although a large number of achievements have been made in many aspects, such as entity mode and management mode, the reform of human resources is the key. Aiming at the above problems, this paper takes the HR reform pilot project of U University Logistics Group as the research object, applies the theory of scope management and time management in project management, and studies the theory and method of project scope management and time management. The application of tools in the implementation of this project. First of all, the paper describes scope management, time management and human resource management, and introduces the background of project implementation. Secondly, focus on scope planning, definition, WBS, control and verification. Through the formulation of the project charter, scope statement, scope management plan to complete the objectives of the reform project, results, progress and other planning; through detailed analysis of the project to complete the reform project results and milestones specific definition; The work package decomposition of the whole reform project and the quadratic decomposition of the heavy and difficult work are accomplished by making the work decomposition structure. Finally, comparing the articles of association and other documents, it verifies the results of the reform pilot project-human resources management system documents, including job list, job description, post establishment, personnel recruitment, staff training, performance management, compensation management, Labor relations management and other series of documents; Enable change application during scope management to control project changes. Thirdly, it focuses on how to define, sort, estimate resources, estimate time, make schedule, control progress and so on. Activity definition and resource arrangement for reform projects are completed by preparing activity lists and responsibility matrix tables; sequencing of reform project activities is completed by drawing up single code network diagrams; Complete the time estimation and total duration estimation of each activity of the reform project by compiling the activity time estimate list, complete the description of the project schedule with varying degrees of detail by drawing the Gantt chart; By using the Gantt chart comparison method to show and control the progress of the reform project, report the progress of the project to all stakeholders with the progress report. Finally, the research results of the project are summarized. By adopting the scientific method of project management, Qingshuihe Campus material Management Center has successfully completed the reform pilot while carrying out heavy work. In terms of scope and time management, this work model has certain reference value and has become another new method to carry out the reform of human resources in colleges and universities.
【學(xué)位授予單位】:電子科技大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2013
【分類號】:G647.4
【參考文獻(xiàn)】
相關(guān)期刊論文 前9條
1 郝志如,李燕華,鄭廣天;一種適合高校后勤特點(diǎn)的人力資源管理技術(shù)——3P模型[J];經(jīng)濟(jì)師;2005年05期
2 何元;張璐琪;;企業(yè)人力資源的項(xiàng)目化管理思路[J];江蘇建材;2008年02期
3 艾生群;;淺談美國高校后勤管理[J];科技創(chuàng)業(yè)月刊;2011年01期
4 白靜;;項(xiàng)目管理模式在企業(yè)人力資源管理創(chuàng)新中的應(yīng)用[J];科技與管理;2007年03期
5 胡旭;于鑫淼;劉洋;;芻議我國項(xiàng)目管理的現(xiàn)狀及發(fā)展[J];遼寧建材;2011年05期
6 田颯;;借鑒國外高校后勤服務(wù)模式,推進(jìn)后勤社會化改革[J];生產(chǎn)力研究;2009年17期
7 胡征宇,朱sヌ
本文編號:2393163
本文鏈接:http://sikaile.net/jiaoyulunwen/shifanjiaoyulunwen/2393163.html
最近更新
教材專著