尖峰負(fù)荷下工業(yè)用戶(hù)用電序位分析模型
[Abstract]:In recent years, the demand for electricity in our country is increasing day by day, and the power supply is relatively lagging behind, especially in summer and winter, the phenomenon of power shortage is serious in most areas of the country. In the face of this severe situation, the State Grid and local power companies have carried out various forms of power restriction measures, and the DSM is one of the effective means, and the implementation of DSM is conducive to increasing the stability of power supply. It plays an important role in improving the level of power consumption at the client end, improving the utilization ratio of electric energy and power grid equipment, and using electricity orderly as an effective means of DSM. Various power supply companies in our country have adopted a series of orderly power consumption measures and schemes, such as summer high temperature overhauling failure peak, enterprise rotation failure peak, load control peak avoidance, interruptible load and so on. Industrial users are large users of electricity, except for major accidents, the power gap can be basically made up by the power limit management of industrial users, and the priority of power supply management in power grid enterprises is to limit the power level of industrial users. In this paper, economic value, energy value, environmental value, user credit degree, user loss and other aspects are studied, the evaluation index system of power consumption level of industrial users is established, and the significance and calculation method of each index are expounded in detail. In this paper, the sequence relation method and entropy method are used to give comprehensive weight to each index in order to replace the Euclidean distance in the ideal point method by using grey correlation degree, which becomes the distance between the measuring schemes. The approximate ideal solutions are sorted. According to the comprehensive score from low to high industrial consumer power consumption order. Finally, this paper takes nine representative industrial enterprises as an example, using the above theory to carry on the empirical analysis.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2013
【分類(lèi)號(hào)】:F426.61
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 蔡海生;2003年錯(cuò)峰有序用電及效益分析[J];電力需求側(cè)管理;2003年03期
2 蔣斌;南京市錯(cuò)峰限電方法分析與研究[J];電力需求側(cè)管理;2005年02期
3 宋宏坤;李揚(yáng);唐國(guó)慶;;市場(chǎng)環(huán)境下電力需求側(cè)管理項(xiàng)目評(píng)估模型的改進(jìn)[J];電力需求側(cè)管理;2008年01期
4 徐志勇;曾鳴;;有序用電的經(jīng)濟(jì)學(xué)分析及實(shí)施建議[J];電力需求側(cè)管理;2009年01期
5 朱炳山;謝欣榮;陳勇;孫紹強(qiáng);范寶通;辛五一;;華北電網(wǎng)有限公司有序用電專(zhuān)項(xiàng)調(diào)研報(bào)告[J];電力需求側(cè)管理;2009年02期
6 儲(chǔ)琳琳;張亮;倪群輝;高賜威;李揚(yáng);;當(dāng)前電力體制下考慮需求側(cè)管理的電網(wǎng)規(guī)劃新思路[J];電力需求側(cè)管理;2010年05期
7 任震;鄺新武;黃雯瑩;;可中斷負(fù)荷措施的成本效益分析[J];電網(wǎng)技術(shù);2006年07期
8 周春明;江輝;何禹清;王穎;彭建春;;可中斷負(fù)荷參與阻塞管理的多目標(biāo)模糊優(yōu)化[J];電網(wǎng)技術(shù);2008年09期
9 張國(guó)華;張建華;彭謙;段滿(mǎn)銀;;電網(wǎng)安全評(píng)價(jià)的指標(biāo)體系與方法[J];電網(wǎng)技術(shù);2009年08期
10 靳希,安平,曹煒,楊秀;上海電力公司2005年迎峰度夏錯(cuò)避峰措施潛力分析[J];上海電力學(xué)院學(xué)報(bào);2005年01期
相關(guān)碩士學(xué)位論文 前1條
1 周潔;縣級(jí)供電企業(yè)有序用電的研究[D];浙江大學(xué);2011年
,本文編號(hào):2166712
本文鏈接:http://sikaile.net/guanlilunwen/shengchanguanlilunwen/2166712.html