GD風力發(fā)電項目后評價研究
發(fā)布時間:2018-05-24 05:47
本文選題:項目建設 + 項目后評價; 參考:《吉林大學》2013年碩士論文
【摘要】:項目后評價屬于項目管理內容,是項目建設的最后程序,是對已完成項目的目的、實施過程、運營、效益和影響的客觀評價與分析,有利于未來項目建設。由于能源短缺、環(huán)境污染等問題,風能作為一種可再生的清潔能源而受到重視,風力發(fā)電成為各國政府的熱門投資項目。 GD風力發(fā)電項目2005年開工建設,次年并網發(fā)電,改寫了J省作為經濟、風資源大省無風電的歷史,該項目采用67臺單機容量1500kW、輪轂高度80m的風電機組,是國家風電特許權項目中第一個建成投產的兆瓦級項目,2008年被中國電力建設企業(yè)協(xié)會評定為“中國電力優(yōu)質工程獎”,2009年入選新中國成立60周年“百年經典建設工程”。 本文主要內容為GD風力發(fā)電項目的項目后評價,通過對GD項目深入調研,收集項目前期決策、項目實施以及項目運營等方面資料,對項目前期決策工作、實施過程、項目運營、項目效果與效益,以及項目目標和持續(xù)性進行了分析和評價,并根據分析與評價結果,總結了項目決策、建設、運營、管理等方面的經驗與教訓,,提出了對GD項目運營和未來項目建設的建議。GD項目后評價研究對GD項目正常運營和企業(yè)今后的風電項目建設均具有一定的指導意義。
[Abstract]:Post-project evaluation is the content of project management and the final procedure of project construction. It is an objective evaluation and analysis of completed project, implementation process, operation, benefit and impact, which is beneficial to future project construction. Due to the shortage of energy and environmental pollution wind energy as a renewable clean energy has been paid attention to. Wind power has become a hot investment project of the governments of various countries. GD wind power project started construction in 2005 and connected to grid the following year, rewriting the history of province J as economy and large wind resource province without wind power. The project adopts 67 wind turbine units with a single machine capacity of 1500 kW and a hub height of 80 m. It is the first megawatt project completed and put into production in the national wind power concession project. In 2008, it was rated as "China Electric Power quality Engineering Award" by the China Electric Power Construction Enterprise Association. In 2009, it was selected for the 60th anniversary of the founding of New China "Classical Construction Project of one hundred years". The main content of this paper is the project post-evaluation of GD wind power generation project, through the in-depth investigation of GD project, collecting the data of project pre-decision, project implementation and project operation, etc. The effect and benefit of the project, as well as the objective and continuity of the project are analyzed and evaluated. According to the results of the analysis and evaluation, the experiences and lessons of project decision-making, construction, operation, management and so on are summarized. This paper puts forward some suggestions for GD project operation and future project construction. The post-evaluation study of GD project has certain guiding significance for the normal operation of GD project and the future wind power project construction of enterprise.
【學位授予單位】:吉林大學
【學位級別】:碩士
【學位授予年份】:2013
【分類號】:TM614;F426.61
【參考文獻】
相關期刊論文 前1條
1 白永前,葉萍,梁學東;電力建設項目后評價實踐[J];山西電力;2005年04期
本文編號:1927911
本文鏈接:http://sikaile.net/guanlilunwen/shengchanguanlilunwen/1927911.html
最近更新
教材專著