特種PVB膠膜研發(fā)項目風(fēng)險管理研究
本文選題:特種PVB膠膜研發(fā)項目 + 項目管理�。� 參考:《中國科學(xué)院大學(xué)(工程管理與信息技術(shù)學(xué)院)》2013年碩士論文
【摘要】:目前全球產(chǎn)業(yè)戰(zhàn)略正在發(fā)生著巨大的變革,化工產(chǎn)業(yè)已經(jīng)成為我國重要的支柱產(chǎn)業(yè)。在提倡科技興國的現(xiàn)代社會,如何研發(fā)出具有高性能、高技術(shù)、高附加值以及低污染的特種PVB膠膜已經(jīng)引起了人們的廣泛關(guān)注。特種PVB膠膜研發(fā)項目技術(shù)要求高、創(chuàng)新要求高、研發(fā)周期較長、研發(fā)過程較為復(fù)雜,并且具有一定的風(fēng)險與危險。由于長期以來受到傳統(tǒng)習(xí)慣以及舊式管理模式的影響,目前我國對于特種PVB膠膜的研發(fā)管理模式仍然保持著計劃經(jīng)濟(jì)時期所盛行的行政為主的管理模式,而沒有根據(jù)市場改革作出相應(yīng)的調(diào)整,沒有構(gòu)建一套行之有效的現(xiàn)代化的項目風(fēng)險管理體系。我國特種PVB膠膜研發(fā)項目風(fēng)險管理的現(xiàn)狀和正在蓬勃發(fā)展的化工新材料事業(yè)十分不符。目前的市場充滿了競爭,如果意識到風(fēng)險的重要性,必然會對特種PVB膠膜產(chǎn)業(yè)的發(fā)展產(chǎn)生巨大的影響。 本文依據(jù)特種PVB新產(chǎn)品開發(fā)的特點,以風(fēng)險管理理論為根據(jù),運用頭腦風(fēng)暴法與專家調(diào)查法進(jìn)行風(fēng)險識別,采用專家打分和層次分析法進(jìn)行風(fēng)險評價,評估項目的各種風(fēng)險,然后以根據(jù)風(fēng)險評估的結(jié)果確定合適的風(fēng)險應(yīng)對策略。根據(jù)巴萊多的“二八”法則,集中精力專攻排序靠前的幾類風(fēng)險,同時運用科學(xué)的管理方法兼顧規(guī)避或減輕次要風(fēng)險因素的發(fā)生。本著盡量節(jié)約成本,性價比最優(yōu)的總體項目運作思路;運用與相關(guān)科院院所建立聯(lián)合研發(fā),簽署合作協(xié)議的方法來轉(zhuǎn)移項目技術(shù)風(fēng)險;運用項目定期評審、檢查表檢查以及隨機抽查等的方法監(jiān)控項目風(fēng)險。這樣,可以降低項目的整體風(fēng)險水平,使項目整體風(fēng)險處于可接受狀態(tài)。 本文一共分五章節(jié),簡單描述了項目風(fēng)險管理的基本理論和概念,總結(jié)了國內(nèi)外PVB行業(yè)的發(fā)展歷史和現(xiàn)狀,根據(jù)特種PVB行業(yè)的特點提出了適用于特種PVB新產(chǎn)品開發(fā)項目的風(fēng)險管理方法,并結(jié)合太陽能光伏電池用的PVB膠膜開發(fā)項目詳細(xì)描述了風(fēng)險管理措施的具體應(yīng)用過程。論文最后給出了研究結(jié)論及特種PVB膠膜新產(chǎn)品研發(fā)項目風(fēng)險管理方面的前景展望。
[Abstract]:At present, the global industrial strategy is undergoing tremendous changes, the chemical industry has become an important pillar industry in China.In the modern society, how to develop special PVB film with high performance, high technology, high added value and low pollution has attracted much attention.Special PVB film R & D project requires high technical requirements, high innovation requirements, long R & D cycle, complex R & D process, and has certain risks and risks.Because of the influence of the traditional habit and the old management mode, the R & D management mode of the special PVB film in our country still maintains the administrative management mode prevailing in the planned economy period.Without corresponding adjustment according to market reform, a set of effective modern project risk management system has not been constructed.The present situation of risk management of special PVB film R & D project in China is not in accordance with the booming new chemical material industry.The current market is full of competition. If we realize the importance of risk, it will inevitably have a great impact on the development of special PVB film industry.According to the characteristics of the new product development of special PVB, based on the risk management theory, this paper uses the brainstorming method and the expert investigation method to carry out the risk identification, and uses the expert scoring and the analytic hierarchy process to carry on the risk evaluation, evaluates each kind of risk of the project.Then according to the results of the risk assessment to determine the appropriate risk response strategy.According to Baledo's "2 / 8" rule, the author focuses on several kinds of risks which are ranked in the first place, and uses scientific management methods to avoid or reduce the occurrence of secondary risk factors at the same time.In line with the overall project operation idea of cost saving and the best value for money as possible; use the method of establishing joint research and development with the relevant institute of science and technology, signing the cooperation agreement to transfer the technical risk of the project; using the project regular review,Check list check and random spot check methods to monitor project risk.In this way, the overall risk level of the project can be reduced and the overall risk of the project can be accepted.This paper is divided into five chapters, briefly describes the basic theory and concept of project risk management, summarizes the development history and current situation of PVB industry at home and abroad.According to the characteristics of the special PVB industry, the risk management method for the new product development project of special PVB is put forward, and the application process of the risk management measures is described in detail in combination with the PVB film development project for solar photovoltaic cells.Finally, the paper gives the research conclusion and the prospect of risk management in the R & D project of special PVB film.
【學(xué)位授予單位】:中國科學(xué)院大學(xué)(工程管理與信息技術(shù)學(xué)院)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2013
【分類號】:F426.72;F272.3
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 高祺勛;權(quán)聰娜;李博;馬麗;;灰色模糊CIM模型的電力項目融資風(fēng)險評判構(gòu)架[J];工業(yè)工程;2010年04期
2 王亞平;王英;;化工研發(fā)項目管理中的問題與對策探討[J];中國石油和化工標(biāo)準(zhǔn)與質(zhì)量;2011年08期
3 孟巖;劉沓;;研發(fā)項目風(fēng)險管理的創(chuàng)新思考[J];中國商界(上半月);2010年07期
4 李永忠;馮俊文;高朋;楊繼明;;基于質(zhì)量功能展開的R&D項目風(fēng)險管理模型[J];技術(shù)經(jīng)濟(jì)與管理研究;2010年03期
5 萬軍;江超;;制造企業(yè)研發(fā)項目管理模式與信息系統(tǒng)研究[J];中國制造業(yè)信息化;2011年03期
6 歐陽軼翔;雷井生;;基于因子分析的企業(yè)研發(fā)項目風(fēng)險評估模型及實證研究[J];科技管理研究;2010年01期
7 盛曉萍;楊尚東;;企業(yè)集團(tuán)研發(fā)項目管理模式研究[J];科技管理研究;2011年11期
8 王煒;;項目風(fēng)險管理三階段研究[J];科技信息;2009年20期
9 陳建中;文俊翔;;高新技術(shù)企業(yè)研發(fā)項目管理模式優(yōu)化研究[J];企業(yè)家天地;2010年09期
10 彭安濤;彭燦;;電子信息企業(yè)研發(fā)項目風(fēng)險管理[J];統(tǒng)計與決策;2008年12期
,本文編號:1748272
本文鏈接:http://sikaile.net/guanlilunwen/shengchanguanlilunwen/1748272.html