碾子山區(qū)風電開發(fā)規(guī)劃研究
本文選題:風力發(fā)電 切入點:項目保障 出處:《天津大學》2013年碩士論文 論文類型:學位論文
【摘要】:近年來,全球能源危機和環(huán)境問題已經(jīng)得到世界的普遍關注,并且愈演愈烈,人們開始著眼于開發(fā)新能源以取代傳統(tǒng)不可再生能源。尤其是以太陽能、風能為代表的可再生能源越來越受到世界各國的青睞。我國風電事業(yè)的發(fā)展還處在初級階段,對風力發(fā)電的開發(fā)和利用,影響著我國能源的供應和環(huán)境的控制以及經(jīng)濟可持續(xù)發(fā)展的問題。 碾子山地區(qū)為丘陵地帶,風力資源較為豐富,,發(fā)展該地區(qū)的風電產(chǎn)業(yè)將帶動地區(qū)經(jīng)濟發(fā)展、改善生態(tài)環(huán)境、促進地區(qū)整體素質提高。為碾子山地區(qū)風電項目建設發(fā)展的順利實施,本文主要從可持續(xù)發(fā)展的視角出發(fā),首先了解國內外風電產(chǎn)業(yè)發(fā)展的基本狀況,分析我國風電產(chǎn)業(yè)發(fā)展前景;其次,對碾子山地區(qū)風能開發(fā)的外部環(huán)境和內部環(huán)境做了具體分析,得出建設的必要性;然后,總結碾子山區(qū)風電建設開發(fā)規(guī)劃設計的具體內容并從風電場風機選型、接入系統(tǒng)、消防、土建、環(huán)境影響等方面對風電場建設的可行性做了具體調查研究;最后,針對碾子山風電項目工程建設的發(fā)展戰(zhàn)略中存在劣勢和威脅,提出內外兩方面的保障性措施,確保該項目的順利高效的完成,為碾子山風電產(chǎn)業(yè)健康發(fā)展作出貢獻。
[Abstract]:In recent years, the global energy crisis and environmental problems have received universal attention in the world, and become increasingly fierce. People begin to focus on the development of new sources of energy to replace traditional non-renewable energy sources, especially solar energy. The renewable energy represented by wind energy is more and more popular all over the world. The development of wind power industry in China is still in the initial stage, the development and utilization of wind power generation, It affects the supply of energy, the control of environment and the sustainable development of economy. The Yanzi Mountain area is a hilly area with abundant wind resources. The development of wind power industry in this area will lead to regional economic development and improve the ecological environment. To promote the overall quality of the region. In order to carry out the construction and development of wind power projects in the Rizishan area, this paper, from the perspective of sustainable development, first understands the basic situation of the development of wind power industry at home and abroad. The paper analyzes the development prospects of wind power industry in China. Secondly, it makes a concrete analysis of the external and internal environment of wind energy development in Yanzishan area, and concludes the necessity of construction. This paper summarizes the specific contents of wind power construction and development planning and design in Rizi Mountain area, and makes a specific investigation and study on the feasibility of wind farm construction from aspects of wind farm fan selection, access system, fire protection, civil construction, environmental impact and so on. In view of the disadvantages and threats in the development strategy of the wind power project construction of Rizishan wind power project, this paper puts forward the supporting measures in both internal and external aspects to ensure the smooth and efficient completion of the project, and contribute to the healthy development of the wind power industry in Rolanzishan.
【學位授予單位】:天津大學
【學位級別】:碩士
【學位授予年份】:2013
【分類號】:TM614;F426.61
【參考文獻】
相關期刊論文 前10條
1 編輯部;;建設綠色電力 發(fā)展清潔能源——2009中國電力論壇綜述[J];電力技術;2009年11期
2 仇衛(wèi)東;王智冬;李雋;;我國風電發(fā)展相關問題分析[J];電力技術經(jīng)濟;2008年01期
3 蔣莉萍;;2007年風電發(fā)展情況及其帶來的有關思考[J];電力技術經(jīng)濟;2008年03期
4 汪寧渤;馬彥宏;夏懿;;甘肅酒泉10GW級風電基地面臨的巨大挑戰(zhàn)[J];電力建設;2010年01期
5 許洪華,郭金東 ,鄂春良;世界風電技術發(fā)展趨勢和我國未來風電發(fā)展探討[J];電力設備;2005年10期
6 沈又幸;范艷霞;;基于動態(tài)成本模型的風電成本敏感性分析[J];電力需求側管理;2009年02期
7 馬昕霞,宋明中,馬強,李永光;風力發(fā)電系統(tǒng)控制技術的研究[J];上海電力學院學報;2005年03期
8 王超;張懷宇;王辛慧;李天柱;;風力發(fā)電技術及其發(fā)展方向[J];電站系統(tǒng)工程;2006年02期
9 易躍春;風力發(fā)電現(xiàn)狀、發(fā)展前景及市場分析[J];國際電力;2004年05期
10 李仁年;王秋紅;劉成勝;;求解螺旋離心泵內部流動的數(shù)值模型[J];蘭州理工大學學報;2006年01期
本文編號:1604846
本文鏈接:http://sikaile.net/guanlilunwen/shengchanguanlilunwen/1604846.html