SG公司西十筒倉一期改造項目進(jìn)度計劃與控制研究
[Abstract]:With the development of human industry, industrial heritage witnessed the civilization of the world industrialization era. It is of great significance to recognize and preserve the valuable industrial heritage and to develop and utilize it reasonably, which is of great significance for the preservation of industrial historical features, the continuation of the region and the characteristic culture of the enterprise. In the industrial heritage reconstruction project, the project schedule planning and control is not only the key link to realize the project progress goal, but also one of the main contents of the project management, it has the important significance to whether the project goal can be completed smoothly. Based on the related knowledge of project management and taking the first stage reconstruction project of West 10 silos of SG Company as an example, this paper expounds the principle and method of project schedule planning and control management in the concrete application of industrial site reconstruction project. This paper first introduces the concept of project schedule management, secondly, introduces the preliminary work, the overall plan of the project and the organization structure of the project in the West 10 Silo of SG Company. Then, according to the characteristics of the project, the network schedule of the project is worked out, the key route and key work of the project are defined, and the effective scientific method is used to optimize and adjust the progress plan of the project. In view of the various risk factors that may exist in the process of project schedule control management, this paper analyzes and formulates countermeasures. Taking the first stage reconstruction project of West 10 silos of SG Company as a case study, the application process of project schedule planning and control management in this project is deeply studied and discussed, and a scientific and reasonable progress plan is worked out for the project. At the same time, it analyzes and summarizes the main technical methods and measures in project schedule management related to the protection and reuse of industrial sites, and constructs a scientific project schedule planning and control system. It is helpful for the development and construction of Beijing Industrial Park of Shougang Company in the future, and provides reference for the enterprises to adopt the knowledge of project schedule management.
【學(xué)位授予單位】:東北大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:TU722
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 趙道致,廖華;遺傳算法在項目進(jìn)度計劃中的應(yīng)用[J];工業(yè)工程與管理;2004年06期
2 熊煥淮,楊振華;監(jiān)理如何審查和調(diào)整多標(biāo)段工程項目進(jìn)度計劃[J];江西水利科技;2002年S1期
3 柯暢;;蒙特卡羅仿真在制定項目進(jìn)度計劃中的應(yīng)用[J];機(jī)電技術(shù);2011年01期
4 張春生;嚴(yán)廣樂;;基于設(shè)計結(jié)構(gòu)矩陣的項目進(jìn)度計劃模型研究[J];科技與管理;2012年03期
5 李立一;;工程項目進(jìn)度計劃的實(shí)施與調(diào)整[J];大眾科技;2013年05期
6 郭云濤;白思俊;萬小兵;;基于DSM的項目成組管理模式的研究[J];工業(yè)工程;2007年04期
7 邱威;;項目進(jìn)度計劃動態(tài)管理模式在南京保障房項目施工中的應(yīng)用[J];經(jīng)營管理者;2013年11期
8 蔣根謀;一種新的線性工程項目進(jìn)度計劃的編制方法[J];鐵道建筑;2005年11期
9 林軍;劉朝輝;沈志剛;;一種資源約束下的工程項目進(jìn)度計劃優(yōu)化方法[J];工程建設(shè)與設(shè)計;2006年11期
10 喬志佳;;淺談工程項目進(jìn)度計劃制定與優(yōu)化──以YJL住宅小區(qū)工程項目為例[J];行政事業(yè)資產(chǎn)與財務(wù);2013年20期
相關(guān)會議論文 前3條
1 李宏信;董秀偉;張玉;;淺談項目進(jìn)度計劃制定及管理[A];第九屆河南省汽車工程技術(shù)研討會論文集[C];2012年
2 余欽墅;;淺談測繪項目進(jìn)度計劃管理[A];浙江測繪(2012第2期總第111期)[C];2012年
3 李健民;夏松林;;基于MONTE-CARLO模擬的項目進(jìn)度計劃風(fēng)險評估[A];中國海洋石油總公司第三屆海洋工程技術(shù)年會論文集[C];2012年
相關(guān)重要報紙文章 前3條
1 本報評論員;咬定目標(biāo)不松勁[N];益陽日報;2009年
2 記者 工力;我市加快重點(diǎn)工程建設(shè)步伐[N];臨汾日報;2011年
3 記者 劉艷 通訊員 李春妮;翔安隧道今年將開挖2000米[N];廈門日報;2006年
相關(guān)博士學(xué)位論文 前1條
1 章勇武;高速公路建設(shè)工程進(jìn)度的柔性化管理研究[D];同濟(jì)大學(xué);2005年
相關(guān)碩士學(xué)位論文 前10條
1 劉婷;某油田25-1生活樓項目進(jìn)度計劃研究[D];吉林大學(xué);2014年
2 孫盛楠;環(huán)保學(xué)院新校區(qū)綜合樓項目進(jìn)度計劃編制與控制研究[D];燕山大學(xué);2015年
3 王進(jìn)會;施耐德數(shù)據(jù)中心產(chǎn)品研發(fā)項目進(jìn)度計劃與控制[D];上海交通大學(xué);2015年
4 付恩莉;戚機(jī)公司泰車研制項目進(jìn)度計劃與控制研究[D];大連理工大學(xué);2015年
5 郭志衛(wèi);M公司轉(zhuǎn)向節(jié)生產(chǎn)建設(shè)項目進(jìn)度計劃與控制[D];大連理工大學(xué);2015年
6 陳磊;人力資源約束下某建筑工程項目進(jìn)度計劃研究[D];電子科技大學(xué);2015年
7 張偉;轎車底盤耦合桿國產(chǎn)化項目進(jìn)度計劃管理[D];上海交通大學(xué);2014年
8 蘇奔;高層建筑滅火系統(tǒng)研發(fā)項目進(jìn)度計劃制定研究[D];北京工業(yè)大學(xué);2015年
9 張亞妮;XX公司研發(fā)項目進(jìn)度計劃與控制改進(jìn)研究[D];電子科技大學(xué);2014年
10 邱柏榕;LA項目進(jìn)度計劃的研究[D];華南理工大學(xué);2015年
,本文編號:2367842
本文鏈接:http://sikaile.net/guanlilunwen/chengjian/2367842.html