高密市城北片區(qū)天然氣工程建設(shè)項目風(fēng)險管理研究
[Abstract]:Risk management is a system engineering. The direction and countermeasure of risk management determine the success or failure of the project. On the basis of summarizing the theories and methods of project risk management at home and abroad, this paper studies the risk management of natural gas construction project in Chengbei district of Gaomi city. The paper first introduces the general situation of the project from six aspects: the scale and function of the natural gas construction project, the project construction unit and the investment and financing situation, the progress plan of the project implementation and the project management. The target of the thesis is defined. Based on the analysis of the necessity of the construction of the natural gas project in the north part of Gaomi city and the forecast of the market demand of the natural gas in the city, the market risk of the project is evaluated. It is considered that the project has no obvious market risk-but there are potential risks, and the countermeasures are put forward for the potential market risk. The technical scheme of natural gas engineering construction project in Gaomi North area is analyzed from the aspects of gas transmission pipe network construction and pressure regulation facility and valve shutoff, and the selection of wiring mode, pressure level system and pipe material. The technical risk of the project is analyzed from the aspects of pressure regulating facilities and valve technology, and the solutions to the technical hidden trouble are put forward. The environmental impact of the project is studied from four aspects, namely, the construction period of the natural gas project in Gaomi North area, the environmental impact and control measures of the operation, the ecological environmental impact and protection measures, and the analysis of environmental safety factors. The risk caused by various factors is evaluated according to relevant laws and regulations and project implementation, and corresponding preventive measures are put forward. On the basis of a series of basic financial data, the investment benefit of the project is analyzed, and the investment risk is quantitatively evaluated, based on the analysis of the investment situation of the natural gas project construction project in the Beichian District of Gaomi City, and on the basis of a series of basic financial data. And how to control the risk factors put forward the countermeasures. The last part of the paper summarizes the full text, and puts forward some suggestions for the implementation of the project.
【學(xué)位授予單位】:哈爾濱工程大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:TU996
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 向勇;;管道隧道項目總承包風(fēng)險分析和控制[J];項目管理技術(shù);2013年08期
2 史鼎文;倪國平;凌進(jìn);;核電主設(shè)備制造項目風(fēng)險識別與防范[J];項目管理技術(shù);2013年06期
3 李帥芳;肖果平;;Crystal Ball在項目管理風(fēng)險分析中的應(yīng)用[J];項目管理技術(shù);2013年04期
4 茍建林;張吉軍;;系統(tǒng)論視野下的天然氣勘探開發(fā)項目綜合環(huán)境影響評價分析框架探析[J];科技管理研究;2012年17期
5 安玉鼎;馬金平;靳小青;;資金風(fēng)險對建筑項目進(jìn)度的影響分析:貝葉斯網(wǎng)絡(luò)方法[J];項目管理技術(shù);2012年08期
6 馬白玉;戚安邦;董玉梅;高進(jìn)田;張藝;;城市綜合開發(fā)項目風(fēng)險評估內(nèi)容及方法研究[J];項目管理技術(shù);2012年08期
7 閆翠麗;孫景峰;;EPC工程總承包及風(fēng)險管理[J];科協(xié)論壇(下半月);2012年02期
8 曾其威;;EPC總承包模式下項目風(fēng)險管理研究[J];大眾科技;2012年02期
9 周英超;裴樹仙;朱麗紅;;城市天然氣供應(yīng)的儲存與調(diào)峰研究[J];中國高新技術(shù)企業(yè);2011年36期
10 郭逸飛;劉小寧;郭海剛;;關(guān)于石油行業(yè)地面建設(shè)工程項目管理的幾點看法[J];中小企業(yè)管理與科技(下旬刊);2011年08期
相關(guān)碩士學(xué)位論文 前2條
1 孫曉明;建筑工程項目投資風(fēng)險管理研究[D];重慶大學(xué);2007年
2 宋鵬;長輸管道工程EPC總承包項目風(fēng)險管理研究[D];蘭州大學(xué);2006年
,本文編號:2232348
本文鏈接:http://sikaile.net/guanlilunwen/chengjian/2232348.html