預(yù)應(yīng)力懸拉索鋼結(jié)構(gòu)旋轉(zhuǎn)安裝技術(shù)
發(fā)布時(shí)間:2018-04-26 03:28
本文選題:預(yù)應(yīng)力 + 懸拉索。 參考:《施工技術(shù)》2015年S2期
【摘要】:西安海洋公園二期極地館及海洋風(fēng)情商業(yè)街工程北極熊館采用片式鋼管桁架結(jié)構(gòu),其上為索膜結(jié)構(gòu)形式,中間鋼柱通過預(yù)應(yīng)力拉索固定,GZ1傾斜于屋面,GZ2懸于空中,塔式起重機(jī)無法將其直接吊裝到位。針對(duì)工程施工難點(diǎn),經(jīng)方案比選,采用預(yù)應(yīng)力懸拉索旋轉(zhuǎn)安裝方案。介紹了鋼柱下端固定、上端旋轉(zhuǎn)的核心原理及施工階段的關(guān)鍵技術(shù)點(diǎn),保證了施工質(zhì)量。
[Abstract]:The polar pavilion of Xi'an Ocean Park II and the Polar Bear Pavilion of Ocean style Commercial Street adopt a piece of steel pipe truss structure with cable-membrane structure on the top, and the intermediate steel column is inclined to the roof with GZ2 suspended from the roof through the prestressed cable fixed with GZ1. Tower crane can not be directly hoisted in place. In view of the construction difficulties, the prestress suspension cable rotation installation scheme is adopted by comparison and selection of the project. This paper introduces the core principle of the fixed and upper end rotation of the steel column and the key technical points in the construction stage to ensure the construction quality.
【作者單位】: 中建三局第一建設(shè)工程有限責(zé)任公司;
【分類號(hào)】:TU758.11
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 蘇達(dá)根,高德虎,張志杰;斜拉索失效原因分析[J];工業(yè)建筑;1999年09期
2 李國(guó)平;斜拉索非線性分析的狀態(tài)修正法[J];同濟(jì)大學(xué)學(xué)報(bào)(自然科學(xué)版);2000年01期
3 劉萬鋒,劉健新;斜拉索粘性剪切型阻尼器的簡(jiǎn)化設(shè)計(jì)方法[J];西安公路交通大學(xué)學(xué)報(bào);2000年04期
4 潘鈞俊,林雪綱,莊表中,孫f,
本文編號(hào):1804307
本文鏈接:http://sikaile.net/guanlilunwen/chengjian/1804307.html
最近更新
教材專著