信陽東500kV工程技術(shù)經(jīng)濟(jì)及目標(biāo)完成度后評價研究
[Abstract]:As the key infrastructure in China, power transmission and transformation project plays an important role in the development of economy and the improvement of people's quality of life. After the completion of the project, the post-evaluation of transmission and transformation project is to evaluate the technology, economic benefit and sustainability of the project. At present, the State Grid Corporation has made great achievements in the construction of infrastructure standardization. It has established a "three horizontal and five vertical" management system to realize vertical penetration in the field of cost management, and has established a unified standard and management system for the whole process of cost management. Through the strengthening of link management, the project cost can be controlled, controlled and controlled. However, the current management system is still lack of effective evaluation of the whole process of construction cost management and management effect, which is not convenient to timely feedback the relevant information of cost management and improve the cost control and control work in time. Therefore, we should carry out post-evaluation and research work of transmission and transformation engineering, innovate the post-evaluation system of engineering, give full play to the function of assessment and feedback of management and control, objectively and scientifically evaluate the level of cost management, and sum up experience in a timely manner. Continue and optimize and improve the cost control mechanism. In order to improve the level of investment decision and improve the mechanism of investment decision, this paper provides reference for the construction of similar projects in the future. In this paper, the post-evaluation of 500kV transmission and transformation project in Xinyang, Henan Province is carried out, mainly from the aspects of technical performance, economic benefit and target completion degree. Firstly, this paper summarizes the basic theory of post-evaluation of transmission and transformation engineering, which lays a good theoretical foundation for the subsequent evaluation. Secondly, according to the concrete situation of 500kV transmission and transformation project in Xinyang East, the concrete content of post-evaluation of technical performance of transmission and transformation project is determined, the evaluation index system is established, and the method of combining eigenvalue with matter-element extension is used to carry out post-evaluation of technical performance. Thirdly, according to the financial parameter information such as the investment condition of the project, this paper calculates the evaluation parameters of the financial benefit, analyzes the profitability and solvency of the project, and analyzes the sensitivity of the electricity price, electricity quantity, capacity to load ratio. Finally, this paper uses the logical frame diagram method to analyze the target completion of the transmission and transformation project, and through the internal and external factors to the impact analysis of the project, the sustainability of the project objectives are evaluated. In addition, a comprehensive quantitative evaluation index system of objective is established, and the fuzzy evaluation method of entropy weight is used to evaluate it, and the conclusion that the project goal is completed is very good.
【學(xué)位授予單位】:華北電力大學(xué)(北京)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:F426.61
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 ;2000年三峽輸變電工程進(jìn)展情況(續(xù)建部分)[J];電力建設(shè);2000年08期
2 ;烏格輸變電工程開工[J];柴達(dá)木開發(fā)研究;2000年05期
3 ;500kV三林輸變電工程開工[J];上海電力;2007年06期
4 林森;;多個500kV輸變電工程獲批[J];華東電力;2008年07期
5 ;500kV西昌輸變電工程開工[J];電力設(shè)備;2008年06期
6 ;多個500kV輸變電工程獲批[J];變壓器;2008年09期
7 本刊編輯部;;新疆首個750kV輸變電工程開工[J];華北電力技術(shù);2009年11期
8 ;莊河500kV輸變電工程通過啟動驗收[J];東北電力技術(shù);2009年12期
9 ;湖北省輸變電工程變電分公司簡介[J];湖北電力;2009年06期
10 ;興隆水利35千伏輸變電工程開工[J];四川水力發(fā)電;2010年01期
相關(guān)會議論文 前10條
1 張萍;張進(jìn)玉;;輸變電工程電磁環(huán)境影響與對策探討[A];山東電機(jī)工程學(xué)會第四屆供電專業(yè)學(xué)術(shù)交流會論文集[C];2007年
2 張進(jìn)玉;;輸變電工程電磁環(huán)境影響與對策探討[A];節(jié)能環(huán)保 和諧發(fā)展——2007中國科協(xié)年會論文集(一)[C];2007年
3 王綿斌;黃毅臣;張潔;耿鵬云;;基于概率分析方法的輸變電工程造價風(fēng)險評估模型[A];電網(wǎng)工程造價管理優(yōu)秀論文[C];2011年
4 汶根社;;小議輸變電工程施工及控制管理[A];2010年云南電力技術(shù)論壇論文集(文摘部分)[C];2010年
5 馬濤;周波;;河西走廊輸變電工程水土流失防治與監(jiān)測技術(shù)研究[A];首屆干旱半干旱區(qū)域水土保持生態(tài)保護(hù)論壇論文選編[C];2013年
6 蘇紅專;;輸變電工程建設(shè)的全過程造價控制管理[A];2007云南電力技術(shù)論壇論文集[C];2007年
7 史雪飛;李慧;金鶯環(huán);汪亞平;;2010版與2006版國家電網(wǎng)公司輸變電工程通用造價差異及應(yīng)用分析[A];電網(wǎng)工程造價管理優(yōu)秀論文[C];2011年
8 周海;龍玉海;劉宇;蔡保銳;熊志全;趙建剛;唐敏;;110kV河口—老街輸變電工程運行經(jīng)驗總結(jié)[A];2006年云南電力技術(shù)論壇優(yōu)秀論文集[C];2006年
9 陳煥;段一雄;;云南輸變電建設(shè)戰(zhàn)略環(huán)境影響評價研究[A];2008年云南電力技術(shù)論壇論文集[C];2008年
10 趙文平;;500kV輸變電工程水土流失及其綜合防治措施[A];水與水技術(shù)(第二輯)選編[C];2012年
相關(guān)重要報紙文章 前10條
1 李江存邋張憲平;商洛第三座330kV輸變電工程建成投運[N];商洛日報;2008年
2 記者 莫瑞寧邋實習(xí)生 王磊;我市三處110千伏輸變電工程獲批準(zhǔn)[N];西安日報;2008年
3 閆明亮邋本報記者 胡華;撫州500千伏輸變電工程進(jìn)展順利[N];撫州日報;2008年
4 朱斌 徐正宏 杜錦坤;220千伏盛泰輸變電工程完工[N];華東電力報;2010年
5 鄒小民;湖北三項220千伏輸變電工程投產(chǎn)[N];國家電網(wǎng)報;2011年
6 記者 桑學(xué)勇 通訊員 饒浩文;佳綏哈輸變電工程獲評水土保持示范工程[N];國家電網(wǎng)報;2011年
7 周明;多個500千伏輸變電工程獲批[N];中國證券報;2008年
8 黃昭團(tuán) 郭顯邊;“百島”打響首條110千伏輸變電工程建設(shè)攻堅戰(zhàn)[N];科技日報;2013年
9 記者 李易峰;750千伏鳳凰—烏蘇—伊犁輸變電工程投入試運行[N];國家電網(wǎng)報;2013年
10 記者 鐘秀玲;新疆首條橫貫天山輸變電工程月底投運[N];新疆日報(漢);2013年
相關(guān)博士學(xué)位論文 前4條
1 張存建;塔山煤礦礦井建設(shè)項目后評價研究[D];中國礦業(yè)大學(xué)(北京);2016年
2 彭軍龍;高速公路建設(shè)項目綜合定量后評價研究[D];中南大學(xué);2006年
3 奚寬武;高速公路后評價理論與方法研究[D];北京工業(yè)大學(xué);2004年
4 唐斌斌;基于流域梯級開發(fā)的水電工程項目后評價研究[D];中南大學(xué);2014年
相關(guān)碩士學(xué)位論文 前10條
1 陳康婷;信陽東500kV工程技術(shù)經(jīng)濟(jì)及目標(biāo)完成度后評價研究[D];華北電力大學(xué)(北京);2017年
2 侯捷旭;運城供電公司輸變電工程造價管理研究[D];華北電力大學(xué);2015年
3 劉庭軍;電網(wǎng)企業(yè)輸變電工程經(jīng)濟(jì)效益后評價研究[D];華北電力大學(xué);2015年
4 王宇峰;泊江海輸變電工程效益綜合評價[D];華北電力大學(xué);2015年
5 王唯瑋;500kV輸變電工程項目風(fēng)險評價研究[D];華北電力大學(xué);2015年
6 楊娜;樓梓莊110kV輸變電工程進(jìn)度計劃與控制研究[D];華北電力大學(xué);2015年
7 王富平;輸變電工程造價控制線細(xì)化方法與應(yīng)用研究[D];重慶大學(xué);2015年
8 鄒瓊;輸變電施工企業(yè)工程項目成本管理探討[D];南華大學(xué);2014年
9 楊磊;基于變更擬合分析的輸變電工程造價控制方法研究[D];華北電力大學(xué);2015年
10 解晗;基于管控要點動態(tài)評價的輸變電工程全面造價管控研究[D];華北電力大學(xué);2015年
,本文編號:2154676
本文鏈接:http://sikaile.net/gongshangguanlilunwen/2154676.html