600MW亞臨界機(jī)組節(jié)能降耗改造研究
[Abstract]:In the opinion on accelerating the Development of Energy Saving and consumption reduction Industry issued by the State Council on August 11, 2013, it is pointed out that the restriction of resources and environment is a prominent contradiction facing the economic and social development of our country at present. To solve the problem of energy saving and consumption reduction is an important and urgent task to expand domestic demand, stabilize growth, adjust structure and build an upgraded version of China's economy. Energy is an important material basis in the process of social development and the lifeblood of the national economy. China is an energy source with coal-fired thermal power generation as the main source of power. Therefore, improving the energy efficiency level of coal-fired units and achieving energy saving and consumption reduction has become a great challenge facing our power industry. In this paper, based on the "implementation of ultra-low emission and energy-saving retrofit scheme for coal-fired power plants", the research is carried out around the energy-saving transformation of 600MW subcritical units. The main research work of this paper is as follows: firstly, the situation of 600MW subcritical unit in A power plant is introduced, and the necessity of energy saving and consumption reduction reform project of sub-critical unit is analyzed, as well as the goal and technical route of energy saving and consumption reduction transformation. Then according to the actual situation from the steam turbine, thermal system, boiler body, boiler auxiliary system, generator, electrical supporting system and other aspects of the corresponding transformation plan. Finally, the energy saving benefit and economic analysis are carried out from four aspects: energy saving benefit, coal saving benefit, capacity increasing benefit and coal saving financial reward income, as well as the impact analysis from three aspects: economic impact, social impact and environmental impact. The purpose of this paper is to help the managers of power generation enterprises to grasp the dynamic information of unit energy efficiency in real time, to guide the relevant personnel to make reasonable adjustment of unit operating parameters, to optimize unit performance, and to fully tap the energy saving potential of coal-fired generating units. Raising the level of energy efficiency in power generation enterprises will bring considerable economic benefits to enterprises.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:F426.61;F206
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 李雙辰;張春旺;李芳;;電力企業(yè)社會(huì)責(zé)任與企業(yè)財(cái)務(wù)績(jī)效關(guān)系研究——基于51家公司2011—2013年面板數(shù)據(jù)[J];會(huì)計(jì)之友;2015年24期
2 謝大幸;石永鋒;郝建剛;鄭健;陳友良;雷嬌嬌;;600MW等級(jí)亞臨界機(jī)組跨代升級(jí)改造技術(shù)應(yīng)用研究[J];發(fā)電與空調(diào);2015年06期
3 趙鵬;;發(fā)電廠熱力系統(tǒng)節(jié)能分析與改進(jìn)[J];資源節(jié)約與環(huán)保;2015年10期
4 柏湘楊;;600MW汽輪機(jī)通流部分改造及節(jié)能分析[J];信息化建設(shè);2015年10期
5 黃香彬;;亞臨界600MW機(jī)組鍋爐蒸汽吹灰系統(tǒng)汽源優(yōu)化研究與應(yīng)用[J];發(fā)電設(shè)備;2015年05期
6 李端開(kāi);李淑強(qiáng);;火力發(fā)電廠給水再循環(huán)系統(tǒng)設(shè)計(jì)優(yōu)化探討[J];電站系統(tǒng)工程;2015年04期
7 綦明明;肖靜;冷杰;;600MW亞臨界機(jī)組綜合升級(jí)改造后鍋爐性能探討[J];東北電力技術(shù);2014年11期
8 劉戰(zhàn)禮;郝建剛;;600MW亞臨界機(jī)組磨煤機(jī)運(yùn)行參數(shù)影響試驗(yàn)分析[J];發(fā)電與空調(diào);2014年05期
9 李偉彬;;熱力發(fā)電廠循環(huán)水系統(tǒng)優(yōu)化設(shè)計(jì)探討[J];山東工業(yè)技術(shù);2014年19期
10 李新友;王晨;;600MW亞臨界機(jī)組蒸汽吹灰汽源改造分析[J];河北電力技術(shù);2014年03期
相關(guān)會(huì)議論文 前1條
1 邵慶樂(lè);王文學(xué);趙濤;;600MW火電機(jī)組節(jié)能降耗分析與優(yōu)化措施[A];2016年第五屆熱電聯(lián)產(chǎn)與煤電深度節(jié)能新技術(shù)研討會(huì)論文集[C];2016年
相關(guān)碩士學(xué)位論文 前4條
1 馬立偉;華能上安電廠#1機(jī)組通流改造技術(shù)及性能試驗(yàn)研究[D];華北電力大學(xué);2014年
2 劉U,
本文編號(hào):2147174