國(guó)際工程合同法的涉案研究——工期索賠分析方法與運(yùn)用
發(fā)布時(shí)間:2018-11-27 21:25
【摘要】:文章在對(duì)國(guó)際工程索賠中幾種常用的延誤方法予以簡(jiǎn)介和總結(jié)的基礎(chǔ)上,對(duì)當(dāng)前的工期延誤分析的理論和實(shí)踐予以分析和點(diǎn)評(píng),以達(dá)到更好地服務(wù)于我國(guó)承包商在國(guó)際工程市場(chǎng)上索賠實(shí)踐的目的。
[Abstract]:On the basis of brief introduction and summary of several common methods of delay in international engineering claims, this paper analyzes and comments on the theory and practice of the current time delay analysis. In order to better serve our contractors in the international engineering market claims practice.
【作者單位】: 中國(guó)水利水電第十一工程局海外事業(yè)部;
【分類(lèi)號(hào)】:D997.1
本文編號(hào):2362075
[Abstract]:On the basis of brief introduction and summary of several common methods of delay in international engineering claims, this paper analyzes and comments on the theory and practice of the current time delay analysis. In order to better serve our contractors in the international engineering market claims practice.
【作者單位】: 中國(guó)水利水電第十一工程局海外事業(yè)部;
【分類(lèi)號(hào)】:D997.1
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 何維;;國(guó)際工程合同法的涉案研究——工期索賠分析方法與運(yùn)用[J];鄭州航空工業(yè)管理學(xué)院學(xué)報(bào)(社會(huì)科學(xué)版);2013年05期
2 ;[J];;年期
3 ;[J];;年期
4 ;[J];;年期
5 ;[J];;年期
6 ;[J];;年期
7 ;[J];;年期
8 ;[J];;年期
9 ;[J];;年期
10 ;[J];;年期
,本文編號(hào):2362075
本文鏈接:http://sikaile.net/falvlunwen/hetongqiyue/2362075.html
最近更新
教材專(zhuān)著