電網(wǎng)工程建設(shè)項目中的資源均衡優(yōu)化問題研究
[Abstract]:This paper discusses the problem of the shortest time limit and the balanced consumption of resources in order to obtain the shortest time limit for the completion of the power grid construction project planning and control. For these two kinds of problems, based on the traditional PERT network plan, this paper gives the concepts of the leading circuit and the criticality, and determines the method of the key line with an example. At the same time, the paper analyzes the total construction progress and the completion probability and so on. The corresponding algorithm process is designed, and a bacterial foraging algorithm for balanced optimization of construction resources is proposed. The simulation results show that the construction process with shorter duration and better balance can be obtained by using this algorithm.
【作者單位】: 北京科技大學(xué)東凌經(jīng)濟(jì)管理學(xué)院;
【分類號】:F273;F426.61
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 張進(jìn);;試談電網(wǎng)工程建設(shè)中的造價管理經(jīng)驗和教訓(xùn)[J];山西建筑;2011年26期
2 ;廣東省人民政府辦公廳印發(fā)廣東省加快輸電網(wǎng)工程建設(shè)激勵辦法(試行)的通知[J];廣東省人民政府公報;2008年07期
3 胡婧;高靖;;電網(wǎng)工程建設(shè)期待“名正體順”[J];國家電網(wǎng);2006年11期
4 王榕;白霖;;電網(wǎng)工程建設(shè)中的安全控制[J];云南電業(yè);2007年12期
5 朱忠華;;電網(wǎng)工程建設(shè)項目的過程管理探討[J];湖北電力;2007年S2期
6 呂軍;;過程管理在電網(wǎng)工程建設(shè)中的應(yīng)用[J];硅谷;2008年24期
7 任琪;;電網(wǎng)工程建設(shè)方的索賠管理研究[J];科技創(chuàng)新導(dǎo)報;2009年09期
8 趙建保;丁亞偉;王東海;常豫洲;;電網(wǎng)工程建設(shè)項目進(jìn)度管理中的問題及解決辦法[J];科技風(fēng);2009年21期
9 榮龍;;縣級電網(wǎng)工程建設(shè)存在的問題及應(yīng)對措施[J];中國新技術(shù)新產(chǎn)品;2010年03期
10 魏鐵軍;;電網(wǎng)工程建設(shè)外部環(huán)境協(xié)調(diào)工作的探討[J];科協(xié)論壇(下半月);2010年12期
相關(guān)會議論文 前1條
1 繆謙;胡春華;;電網(wǎng)工程建設(shè)智能化施工技術(shù)的研究[A];施工機(jī)械化新技術(shù)交流會論文集——建筑機(jī)械化2011增刊[C];2011年
相關(guān)重要報紙文章 前10條
1 記者 羅迅革;加快電網(wǎng)工程建設(shè)步伐[N];汕尾日報;2008年
2 通訊員 梁維德邋記者 金志良;椒江克難攻堅加快電網(wǎng)工程建設(shè)[N];臺州日報;2007年
3 唐,
本文編號:2240186
本文鏈接:http://sikaile.net/qiyeguanlilunwen/2240186.html