抽水蓄能機(jī)組發(fā)電電動(dòng)機(jī)停機(jī)過程振動(dòng)分析
[Abstract]:For an energy storage unit, the vibration of fixed components of power generation motor during shutdown under different working conditions is tested, and the vibration signals of upper frame, stator base and lower frame are analyzed by time domain and frequency domain analysis methods. By means of time domain signal mixing amplitude analysis, the vibration mixing amplitude trend of fixed components during shutdown is obtained. Window Fourier transform is used to identify the frequency components of fixed components during shutdown. The main frequency components include static and static interference frequency, double blade overcurrent frequency, double and double thrust pad passing frequency and so on. The analysis shows that the resonance frequency of the fixed component is excited during the shutdown of the unit. Compared with the calculation of resonance characteristics of key structural components, it is pointed out that there is a disadvantage of insufficient consideration of working conditions in the design stage, which leads to the risk of resonance between plant and unit during start-up and shutdown.
【作者單位】: 國網(wǎng)新源控股有限公司技術(shù)中心;
【基金】:國家電網(wǎng)公司科技資助項(xiàng)目(52573016001G) 國家自然科學(xué)基金資助項(xiàng)目(51309258)
【分類號】:TV738;TV743
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 姜茜;;發(fā)電電動(dòng)機(jī)的超純水系統(tǒng)[J];東方電機(jī);2002年01期
2 名倉理;日立發(fā)電電動(dòng)機(jī)的技術(shù)動(dòng)向[J];水利水電技術(shù);2001年06期
3 柳澤志好,關(guān)克弘,明倉理,關(guān)存良;葛野川電站──當(dāng)今世界上最大容量的空冷發(fā)電電動(dòng)機(jī)[J];水利水電技術(shù);2001年08期
4 趙貴前;;發(fā)電電動(dòng)機(jī)定子線棒故障檢修[J];電力安全技術(shù);2008年11期
5 馬旭東;;大河內(nèi)400MW調(diào)速發(fā)電電動(dòng)機(jī)[J];東方電機(jī);1995年02期
6 朱冠宏;薛小兵;;抽水蓄能電站發(fā)電電動(dòng)機(jī)上導(dǎo)潤滑油污染原因分析及對策[J];水力發(fā)電;2014年02期
7 趙政;;抽水蓄能電站發(fā)電電動(dòng)機(jī)國產(chǎn)化[J];大電機(jī)技術(shù);2010年01期
8 張伯超;;天堂抽水蓄能電廠發(fā)電電動(dòng)機(jī)設(shè)計(jì)特點(diǎn)及運(yùn)行情況[J];水電站機(jī)電技術(shù);2006年03期
9 徐立佳;;抽水蓄能電站發(fā)電電動(dòng)機(jī)的特點(diǎn)及選型設(shè)計(jì)分析[J];水力發(fā)電;2010年07期
10 趙政;;發(fā)電電動(dòng)機(jī)的比較設(shè)計(jì)[J];西北水電;2012年S1期
相關(guān)會(huì)議論文 前10條
1 沙濱;;寶泉抽水蓄能電站發(fā)電電動(dòng)機(jī)[A];2010年度電氣學(xué)術(shù)交流會(huì)議論文集[C];2010年
2 羅建華;王建剛;;蒲石河抽水蓄能電站發(fā)電電動(dòng)機(jī)設(shè)計(jì)[A];抽水蓄能電站工程建設(shè)文集(2011)[C];2011年
3 趙政;;發(fā)電電動(dòng)機(jī)的安全穩(wěn)定運(yùn)行[A];抽水蓄能電站工程建設(shè)文集(2010)[C];2010年
4 王艷武;王建剛;;響水澗抽水蓄能電站發(fā)電電動(dòng)機(jī)設(shè)計(jì)[A];抽水蓄能電站工程建設(shè)文集(2011)[C];2011年
5 羅建華;王建剛;;蒲石河抽水蓄能電站發(fā)電電動(dòng)機(jī)設(shè)計(jì)[A];抽水蓄能電站工程建設(shè)文集2011[C];2011年
6 王艷武;王建剛;;響水澗抽水蓄能電站發(fā)電電動(dòng)機(jī)設(shè)計(jì)[A];抽水蓄能電站工程建設(shè)文集2011[C];2011年
7 曾輝;張書友;;天荒坪電站發(fā)電電動(dòng)機(jī)機(jī)械制動(dòng)器改造[A];第十八次中國水電設(shè)備學(xué)術(shù)討論會(huì)論文集[C];2011年
8 趙政;;抽水蓄能電站發(fā)電電動(dòng)機(jī)的過渡過程[A];2013年電氣學(xué)術(shù)交流會(huì)議論文集[C];2013年
9 李金偉;谷振富;于紀(jì)幸;何忠華;;張河灣抽水蓄能電站3號發(fā)電電動(dòng)機(jī)現(xiàn)場效率試驗(yàn)[A];第十九次中國水電設(shè)備學(xué)術(shù)討論會(huì)論文集[C];2013年
10 朱維志;潘立剛;孫淑芳;潘虹;劉岳山;;蒲石河抽水蓄能電站發(fā)電電動(dòng)機(jī)主要參數(shù)和型式選擇研究[A];抽水蓄能電站工程建設(shè)文集(2010)[C];2010年
相關(guān)博士學(xué)位論文 前1條
1 于鴻浩;抽水蓄能機(jī)組發(fā)電電動(dòng)機(jī)電磁參數(shù)與端部電磁場問題研究[D];哈爾濱理工大學(xué);2016年
相關(guān)碩士學(xué)位論文 前2條
1 燕秀龍;大型發(fā)電電動(dòng)機(jī)多工況運(yùn)行端部電磁場的分析與計(jì)算[D];哈爾濱理工大學(xué);2015年
2 陳麗霞;發(fā)電電動(dòng)機(jī)通風(fēng)系統(tǒng)全通道數(shù)值模擬[D];哈爾濱工業(yè)大學(xué);2014年
,本文編號:2482465
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/2482465.html