吉音水庫混凝土面板堆石壩設(shè)計
[Abstract]:The Jiyin Water Conservancy Project is located on the main stream of the Creya River in Yutian County, Xinjiang, China. The area of the basin controlled above the dam site is 6 375 km~2, which is mainly for irrigation and flood control. A comprehensive water conservancy project that takes into account power generation. The total storage capacity of the Jiyin Water Conservancy Project is 82 million mm3, the normal water level of the reservoir is 2 509.00 m, and the power generation of the hydropower station is 105.8 million k W h. per year for 24 MW,. The Jiyin water conservancy project is a second class project, and the dam is a permanent Yongshui structure grade 2. Dam design flood standard is once in 100 years, Hong Feng
【作者單位】: 水利部新疆維吾爾自治區(qū)水利水電勘測設(shè)計研究院;
【分類號】:TV641.43
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 雷艷;王康柱;蔡新合;;積石峽水電站混凝土面板堆石壩壩體分區(qū)優(yōu)化設(shè)計及壩料調(diào)整[J];西北水電;2011年02期
2 梁俊群;卓淳;;南山水庫混凝土面板堆石壩壩體分區(qū)及壩料設(shè)計[J];巖土工程界;2008年02期
3 張偉;;溫泉水電站面板堆石壩壩體分區(qū)及壩料[J];水科學(xué)與工程技術(shù);2013年03期
4 肖化文;水布埡面板壩壩體分區(qū)優(yōu)化設(shè)計與龍?zhí)读侠醚芯縖J];水利水電快報;2002年08期
5 酈能惠;;高混凝土面板堆石壩設(shè)計理念探討[J];巖土工程學(xué)報;2007年08期
6 ;天生橋一級水電站混凝土面板堆石壩設(shè)計[J];紅水河;1995年04期
7 蘇麗群;天生橋一級水電站混凝土面板堆石壩設(shè)計[J];水利水電技術(shù);1998年03期
8 楊建學(xué);查林義;;德澤電站混凝土面板堆石壩設(shè)計[J];人民珠江;2009年01期
9 何勤;李勁飛;范金勇;;JLT水電站混凝土面板砂礫-堆石壩壩體分區(qū)及壩料設(shè)計[J];水利規(guī)劃與設(shè)計;2008年06期
10 龐曉嵐,帖建明;海潮壩混凝土面板堆石壩設(shè)計特點(diǎn)[J];甘肅水利水電技術(shù);1998年01期
相關(guān)會議論文 前3條
1 酈能惠;;高混凝土面板堆石壩設(shè)計理念探討[A];第一屆中國水利水電巖土力學(xué)與工程學(xué)術(shù)討論會論文集(上冊)[C];2006年
2 李祖發(fā);;街面水電站混凝土面板堆石壩設(shè)計[A];福建省水力發(fā)電工程學(xué)會2006年學(xué)術(shù)論文匯編[C];2006年
3 蔡小仁;丁天沛;;黃龍水庫混凝土面板堆石壩設(shè)計和施工[A];土石壩技術(shù)——2008年論文集[C];2008年
,本文編號:2365719
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/2365719.html