A抽水蓄能電站運(yùn)維一體化項(xiàng)目實(shí)施及評(píng)價(jià)研究
本文選題:抽水蓄能電站 + 運(yùn)維一體化 ; 參考:《華北電力大學(xué)(北京)》2017年碩士論文
【摘要】:隨著我國(guó)電力體制改革的不斷深入,抽水蓄能電站越來(lái)越受到電力部門的重視。然而,在傳統(tǒng)經(jīng)營(yíng)模式下,抽水蓄能電站的運(yùn)行和維護(hù)涉及到很多方面,管理難度大,需要協(xié)調(diào)的部門多,這種模式完全沒有辦法滿足現(xiàn)代抽水蓄能電站快速發(fā)展的需要。抽水蓄能電站運(yùn)維一體化正是在這種情況下逐漸發(fā)展起來(lái)的,它通過優(yōu)化人員配置,進(jìn)行技術(shù)管理優(yōu)化,使抽蓄電站所有運(yùn)維員工都成為“能運(yùn)行、能維護(hù)、能集控、一崗多能”的高素質(zhì)復(fù)合型人才,達(dá)到一個(gè)抽蓄電站獨(dú)立完成運(yùn)行和維護(hù)任務(wù)的目標(biāo)。本文首先總結(jié)了運(yùn)維一體化的管理模式,該模式具有組織結(jié)構(gòu)扁平化、團(tuán)隊(duì)協(xié)作、員工一專多能、工作標(biāo)準(zhǔn)化、規(guī)范化等特點(diǎn)。這些特點(diǎn),在決策層和操作者之間建立緊湊的橫向關(guān)系,最大限度的提高企業(yè)的工作效率。也打破了傳統(tǒng)工種的界限。通過系統(tǒng)的培訓(xùn)及相關(guān)工作流程、標(biāo)準(zhǔn)的學(xué)習(xí),使得員工不斷進(jìn)步,提高了工作效率。運(yùn)維一體化項(xiàng)目還可以培養(yǎng)一批復(fù)合型的高素質(zhì)人才隊(duì)伍,為抽水蓄能電站的長(zhǎng)遠(yuǎn)發(fā)展,打下了堅(jiān)實(shí)的人力基礎(chǔ)。第二,本文分析了A抽水蓄能電站的運(yùn)維一體化項(xiàng)目的實(shí)施方案,建立了運(yùn)維一體化的實(shí)施標(biāo)準(zhǔn),包括機(jī)構(gòu)、崗位優(yōu)化,設(shè)備運(yùn)維生產(chǎn)管理,人員運(yùn)維一體化培訓(xùn),班組建設(shè)等四大部分。同時(shí),從部門機(jī)構(gòu)設(shè)置,人員配置,崗位分工,值班方式,業(yè)務(wù)規(guī)范等多個(gè)具體方面開展實(shí)施。在此基礎(chǔ)上,還建立了一套科學(xué)的運(yùn)維一體化人才培養(yǎng)方案,強(qiáng)調(diào)基本技能的強(qiáng)化,弱化運(yùn)維的分工。同時(shí),還確定了不同崗位的運(yùn)維人員培訓(xùn)規(guī)范,為運(yùn)維人員提供了廣闊的發(fā)展空間。第三,在電站運(yùn)維一體化項(xiàng)目實(shí)施的基礎(chǔ)上,本文還對(duì)其實(shí)施的效果進(jìn)行了評(píng)價(jià)。建立了科學(xué)的評(píng)價(jià)體系,設(shè)計(jì)出關(guān)鍵指標(biāo)和普通指標(biāo)兩大量化指標(biāo)評(píng)判體系,應(yīng)用層次分析法建立起各個(gè)判斷參數(shù)的判斷矩陣,并計(jì)算各個(gè)矩陣的一致性指標(biāo)和平均隨機(jī)一致性比率。最后進(jìn)行了實(shí)證分析。
[Abstract]:With the deepening of electric power system reform in our country, pumped storage power stations are paid more and more attention by power department. However, under the traditional management mode, the operation and maintenance of pumped storage power station involve many aspects. The management is difficult and there are many departments that need coordination. This mode can not meet the needs of the rapid development of modern pumped storage power station. It is in this situation that the integrated operation and maintenance of pumped storage power stations is gradually developed. By optimizing the staffing and technical management optimization, all the operation and maintenance staff of the pumped storage power station become "operable, maintainable, centralized and controlled." The high quality and complex talents of one post and multi-energy can achieve the goal of independently completing the operation and maintenance task of a pumped storage power station. This paper first summarizes the management model of the integration of operation and maintenance, which has the characteristics of flat organizational structure, team cooperation, staff expertise, standardization of work, standardization, and so on. These characteristics establish a compact horizontal relationship between decision makers and operators to maximize the efficiency of the enterprise. It also breaks the boundaries of traditional jobs. Through systematic training and related work flow, standard study, make the staff continuous progress, improve the work efficiency. The integrated project of operation and maintenance can also train a group of high quality talents and lay a solid manpower foundation for the long-term development of pumped storage power station. Secondly, this paper analyzes the implementation scheme of A pumped storage power station's integrated project of operation and maintenance, and establishes the implementation standard of operation and maintenance integration, including organization, post optimization, equipment operation and maintenance production management, personnel operation and maintenance integration training. Team construction and other four parts. At the same time, from the department setup, staffing, job division, duty, business norms and other specific aspects of implementation. On the basis of this, a set of scientific training scheme of personnel with integrated operation and maintenance is established, which emphasizes the strengthening of basic skills and weakens the division of labor between operation and maintenance. At the same time, the training standard of operation and maintenance personnel in different positions is determined, which provides broad development space for operation and maintenance personnel. Thirdly, on the basis of the implementation of the integrated project of operation and maintenance of power station, this paper also evaluates the effect of its implementation. A scientific evaluation system is set up, and the evaluation system of two kinds of key indexes and common indexes is designed, and the judgement matrix of each judgment parameter is established by using the analytic hierarchy process (AHP). The consistency index and the average random consistency ratio of each matrix are calculated. Finally, an empirical analysis is carried out.
【學(xué)位授予單位】:華北電力大學(xué)(北京)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:F426.61;F426.91
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 顏隆泰;;關(guān)于變電運(yùn)維一體化的認(rèn)識(shí)探討[J];中小企業(yè)管理與科技(下旬刊);2016年11期
2 郝君;向明;李建光;王國(guó)柱;;水電生產(chǎn)管理系統(tǒng)在運(yùn)維一體化模式下的深化應(yīng)用與實(shí)踐[J];水電與抽水蓄能;2016年01期
3 劉源;;關(guān)于變電運(yùn)維一體化的認(rèn)識(shí)探討[J];中國(guó)高新技術(shù)企業(yè);2016年03期
4 周淑蕓;;變電管理中變電運(yùn)維一體化模式的應(yīng)用[J];企業(yè)技術(shù)開發(fā);2015年35期
5 張鵬;韓立業(yè);;變電專業(yè)化管理中變電運(yùn)維一體化模式的應(yīng)用探析[J];中國(guó)新通信;2015年06期
6 范李平;余劍鋒;姚迪;;“運(yùn)維一體化”管理模式拓展應(yīng)用[J];中國(guó)電力教育;2014年33期
7 汪子翔;陳勝光;;關(guān)于運(yùn)維一體化模式下蓄能電站開展教育培訓(xùn)和人才開發(fā)工作的研究[J];中外企業(yè)家;2014年24期
8 陶鴻飛;魏偉明;姚建生;;變電運(yùn)維一體化作業(yè)風(fēng)險(xiǎn)管控的實(shí)踐[J];華東電力;2014年08期
9 高文彬;;運(yùn)維一體化仿真培訓(xùn)系統(tǒng)的研究與應(yīng)用[J];中國(guó)電力教育;2014年12期
10 王紅梅;張紅丹;張蕾;;關(guān)于變電運(yùn)維一體化實(shí)施過程中的認(rèn)識(shí)[J];科技資訊;2014年06期
相關(guān)會(huì)議論文 前1條
1 畢揚(yáng);鮑峰;;抽水蓄能電站運(yùn)維一體化管理模式的創(chuàng)新與實(shí)踐[A];抽水蓄能電站工程建設(shè)文集2013[C];2013年
相關(guān)碩士學(xué)位論文 前3條
1 陶海龍;基于混合智能算法的鐵路運(yùn)量預(yù)測(cè)研究[D];蘭州交通大學(xué);2012年
2 王浩鳴;基于支持向量機(jī)的電力負(fù)荷預(yù)測(cè)研究[D];天津大學(xué);2009年
3 蔣麗娜;基于支持向量機(jī)的建筑工程造價(jià)預(yù)測(cè)研究[D];河北工程大學(xué);2009年
,本文編號(hào):1998592
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/1998592.html