建設(shè)項(xiàng)目DB模式的風(fēng)險(xiǎn)評價(jià)研究
[Abstract]:Compared with other models, DB mode has advantages in terms of project construction period, cost and quality objective, and has become the main trend of international project contracting mode. At present, in the field of engineering construction, the DB model is also actively promoted, but at present, it is still in the exploration and application stage, and the management system of the system is not established, and the risk management of the DB model of the construction project is also insufficient. The risk of construction project is divided into the external environment risk and the internal environment Risk. The external environment risk mainly refers to the objective risks such as social risk and natural risk, and the internal environmental risk mainly refers to the behavior of the project main body Risk. In DB mode, the project contract structure is large Change. After completion of the design and preliminary design of the project design and preliminary design by the Owner or the design unit entrusted by it, the General Contractor shall complete the construction drawing design and construction tasks of the project, and shall assume full responsibility for the design quality, the project construction period, the cost and the quality, and the overall contractor's risk is greatly In comparison with the typical risk of the construction project, the main behavior risk factors that affect the project's target have changed greatly, such as the design technical ability of the general contractor and the ability of the design progress management to play an important role in the successful application of the DB mode The paper defines the category of DB mode, discusses the attribute of DB mode from the aspect of contract structure, and makes the DB model and the common project contracting mode. A comparative analysis is made. On the basis of this, further system identification and analysis of the social risk, natural risk and the risk of the main behavior of the project subject such as the owner, the general contractor and the third party supervision have been analyzed, and the risk evaluation of the DB model of the construction project is set up through the induction and arrangement. At last, the characteristics and applicability of the common risk evaluation method are compared. The risk assessment model of the DB model of the construction project was established by introducing the evaluation method, and the evaluation model was analyzed and verified with the case of Shenzhen Metro Line 5 project as an example. The study of this paper can help the project main body to evaluate the risk of the DB project in the early stage of the project, to judge the risk status at the project, and to make relevant risk control measures, which is beneficial to the promotion of DB mode in the construction of our country.
【學(xué)位授予單位】:武漢理工大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2013
【分類號】:TU712
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 龍鵬程;馬錦明;;設(shè)計(jì)-施工總承包在工程中應(yīng)用研究[J];低溫建筑技術(shù);2011年06期
2 董章增;;在設(shè)計(jì)-施工總承包建設(shè)項(xiàng)目中風(fēng)險(xiǎn)管理的研究[J];工程建設(shè)與設(shè)計(jì);2009年08期
3 俞素平;;公路工程設(shè)計(jì)施工總承包項(xiàng)目投標(biāo)風(fēng)險(xiǎn)評價(jià)[J];中外公路;2010年06期
4 陳策;設(shè)計(jì)-施工總承包模式的風(fēng)險(xiǎn)防范[J];世界橋梁;2004年03期
5 李德全;鄭翔;;我國建筑業(yè)設(shè)計(jì)施工一體化發(fā)展研究[J];建筑;2009年07期
6 張馳,張星,孫娟芬;基于AHP法的總承包模式下承包商的風(fēng)險(xiǎn)分析[J];建筑管理現(xiàn)代化;2003年03期
7 張二偉,李啟明;設(shè)計(jì)—施工總承包建設(shè)項(xiàng)目的風(fēng)險(xiǎn)管理[J];建筑管理現(xiàn)代化;2004年03期
8 韓同銀;王晶;王淑雨;;設(shè)計(jì)—施工總承包項(xiàng)目招標(biāo)中業(yè)主需求大綱編制的研究[J];建筑管理現(xiàn)代化;2008年05期
9 黃楠;周艷冬;徐偉;;DB項(xiàng)目中業(yè)主的設(shè)計(jì)風(fēng)險(xiǎn)與管理[J];建筑管理現(xiàn)代化;2009年05期
10 陳娜;瞿秋鳳;;DB模式下風(fēng)險(xiǎn)分擔(dān)模型研究[J];建筑管理現(xiàn)代化;2009年06期
相關(guān)碩士學(xué)位論文 前3條
1 殷福磊;EPC模式下建設(shè)工程項(xiàng)目承包商風(fēng)險(xiǎn)評價(jià)研究[D];山東建筑大學(xué);2011年
2 孫娟芬;DB模式下承包商風(fēng)險(xiǎn)研究[D];河海大學(xué);2003年
3 夏波;DB模式應(yīng)用的問題與對策研究[D];浙江大學(xué);2006年
,本文編號:2410110
本文鏈接:http://sikaile.net/kejilunwen/sgjslw/2410110.html