工程招投標(biāo)中的違規(guī)行為及解決對策研究
[Abstract]:The system of bidding and bidding has been introduced and applied in the field of construction in our country since the beginning of the eighties of last century. After more than 30 years of development, quite good results have been obtained. Practice has proved that the implementation of the bidding system has to a large extent standardized the construction activities of engineering in China, and has played an important role in the rational distribution and utilization of state-owned funds and social public resources, and in ensuring the construction quality of engineering projects. For the social and economic development of our country set up the credit. However, at the same time, we should also realize that in the course of more than 30 years of development, due to the national conditions and the social environment of our country, various illegal behaviors have become increasingly frequent, such as typical marking, string marking, Yin and Yang contracts, and so on. The actual effect of the bidding system has been seriously weakened. Although the relevant national authorities and local governments have formulated corresponding countermeasures against the emergence of the problem one after another, to a certain extent, they have played a role in deterring these violations, but the results have not been very effective. On the contrary, irregularities are showing signs of becoming increasingly rampant. Since the reform and opening up, China's economy has been rapid growth, especially the construction industry can be said to occupy a considerable proportion, so in the face of increasingly prominent bidding violations, we must not take lightly. The bidding system is already the main form of the construction economy development. How to perfect and standardize the bidding activities is related to the overall situation whether the whole construction market can continue to develop in a fair and healthy way. The social main body system of our country is public ownership, so most of the projects are government and public construction projects, and these projects are the most serious disaster areas of illegal behavior, which impact the security of our country's economic development at any time. The economic development of our country is at the key crossroads of the second reform. A little carelessness will have a disastrous impact on the whole economic development of our country. Therefore, the state and society must attach importance to these problems and speed up the reform of the bidding system. And to speed up the establishment of a complete set of bidding and management rules and regulations. On the premise of analyzing a large number of related documents and materials of the predecessors and combining with the practice, this paper sums up and summarizes the problems existing in the implementation process of bidding in our country, and demonstrates and analyzes the representative typical cases. Finally, the paper studies the causes of these problems and the harm to the economic development of our country from the essence, and puts forward the corresponding prevention and solution to these problems better. It is hoped that the research countermeasures of this paper can play an important role in expanding the development mode of bidding in China.
【學(xué)位授予單位】:西南大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2013
【分類號】:TU723.2
【參考文獻】
相關(guān)期刊論文 前10條
1 敬丹,王偉濤;工程量清單招標(biāo)適宜采用無標(biāo)底招標(biāo)[J];重慶工學(xué)院學(xué)報;2004年04期
2 羅建兵;許敏蘭;;合謀理論的演進與新發(fā)展[J];產(chǎn)業(yè)經(jīng)濟研究;2007年03期
3 李黎;西方招投標(biāo)部分經(jīng)驗和慣例對我國招投標(biāo)制度的啟示[J];廣東土木與建筑;2001年10期
4 吳旭丹;;工程招投標(biāo)中法律問題的研究[J];建筑管理現(xiàn)代化;2007年04期
5 鄭叢旭;高幸;;工程投標(biāo)中串標(biāo)問題的分析[J];建筑管理現(xiàn)代化;2009年03期
6 黃嚴(yán);;工程招標(biāo)代理行業(yè)存在的問題與對策研究[J];建設(shè)監(jiān)理;2008年11期
7 李建峰,王秀紅,李曉釧,侯平安;合理低價中標(biāo)法的理論基礎(chǔ)及類型研究[J];建筑經(jīng)濟;2005年04期
8 曹雯雯;;合理低價中標(biāo)法的實踐研究[J];建筑經(jīng)濟;2008年02期
9 楊力強;;中國建筑行業(yè)的競爭格局與產(chǎn)業(yè)發(fā)展對策研究[J];理論月刊;2008年07期
10 姜帆;;完善工程招標(biāo)投標(biāo)管理 防止“圍標(biāo)”、“串標(biāo)”行為[J];北方交通;2007年02期
相關(guān)碩士學(xué)位論文 前7條
1 戚建梅;建立有序的招標(biāo)投標(biāo)市場[D];對外經(jīng)濟貿(mào)易大學(xué);2005年
2 熊向陽;建設(shè)項目工程量清單招標(biāo)及評標(biāo)方法研究[D];河海大學(xué);2006年
3 孟明星;建設(shè)工程投標(biāo)決策模型研究與應(yīng)用[D];天津大學(xué);2006年
4 程功浩;我國招標(biāo)投標(biāo)機制研究[D];北京交通大學(xué);2007年
5 姚倩;國際工程招投標(biāo)特點及對策研究[D];對外經(jīng)濟貿(mào)易大學(xué);2007年
6 王紅勃;建設(shè)工程項目招標(biāo)投標(biāo)過程中存在的問題和對策[D];鄭州大學(xué);2007年
7 何星;工程項目投標(biāo)決策和報價模型研究[D];西安建筑科技大學(xué);2008年
,本文編號:2246507
本文鏈接:http://sikaile.net/kejilunwen/sgjslw/2246507.html