BIM技術(shù)在建設(shè)項(xiàng)目動(dòng)態(tài)成本控制中的應(yīng)用研究
[Abstract]:Construction industry is a labor-intensive industry with long construction period and extensive management. With the improvement of owners' requirements for various functions of buildings, more and more beautiful, complex and intelligent buildings are becoming more and more, which leads to more and more cost of construction projects. It is more and more difficult to control the cost. The BIM technology has the characteristics of visualization, coordination, simulation, optimization and graphability, which makes the cost control more reliable. From the perspective of real estate development enterprises, this paper studies the dynamic cost control of construction projects based on BIM. Firstly, this paper analyzes the concept, structure, traditional cost control methods and shortcomings of real estate development enterprises, and then introduces BIM technology to sort out two cost information management frameworks: linear and circular. Then, combining with the development process of real estate project, this paper analyzes the application of BIM technology in the stages of development preparation, obtaining land use right, design bidding purchase, construction, completion acceptance, post-evaluation and so on. The dynamic cost control flow chart of construction project based on BIM technology is drawn, and the three-level BIM cost information model is established. Finally, on the basis of two kinds of cost information management frameworks, dynamic cost control flow chart and BIM cost information model, the contract information is associated with the BIM model, and the contract model association information table and dynamic cost control table are obtained. The advantages and prospects of dynamic cost control of construction projects under BIM technology are illustrated with a supplementary case, which effectively realizes the dynamic control of the cost of real estate development projects.
【學(xué)位授予單位】:華北水利水電大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:TU723.3;TU17
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 李錦華;秦國(guó)蘭;;基于BIM-5D的工程項(xiàng)目造價(jià)控制信息系統(tǒng)研究[J];項(xiàng)目管理技術(shù);2014年05期
2 龔彥兮;;淺析BIM在我國(guó)的應(yīng)用現(xiàn)狀及發(fā)展阻礙[J];中國(guó)市場(chǎng);2013年46期
3 吳翊寶;;關(guān)于工程量清單計(jì)價(jià)模式下的施工合同管理研究與探析[J];福建建材;2013年09期
4 王廷魁;沈青;周滔;鄒倩;;BIM技術(shù)在房地產(chǎn)項(xiàng)目規(guī)劃方案評(píng)價(jià)中的應(yīng)用研究[J];建筑經(jīng)濟(jì);2013年09期
5 賀靈童;;BIM在全球的應(yīng)用現(xiàn)狀[J];工程質(zhì)量;2013年03期
6 桑培東;李軍;劉學(xué)峰;唐振三;;基于BIM的建設(shè)項(xiàng)目成本動(dòng)態(tài)監(jiān)控可行性研究[J];價(jià)值工程;2013年06期
7 孟森;劉欣;張世洋;;淺談基于BIM的工程造價(jià)管理[J];工程建設(shè);2012年05期
8 李靜;方后春;羅春賀;;基于BIM的全過(guò)程造價(jià)管理研究[J];建筑經(jīng)濟(jì);2012年09期
9 何清華;錢(qián)麗麗;段運(yùn)峰;李永奎;;BIM在國(guó)內(nèi)外應(yīng)用的現(xiàn)狀及障礙研究[J];工程管理學(xué)報(bào);2012年01期
10 張樹(shù)捷;;BIM在工程造價(jià)管理中的應(yīng)用研究[J];建筑經(jīng)濟(jì);2012年02期
相關(guān)會(huì)議論文 前1條
1 馬智亮;婁U,
本文編號(hào):2455485
本文鏈接:http://sikaile.net/kejilunwen/ruanjiangongchenglunwen/2455485.html