電網(wǎng)工程設(shè)計評審業(yè)務(wù)過程管控模式研究與信息系統(tǒng)建設(shè)
本文選題:電網(wǎng)工程設(shè)計 + 評審; 參考:《寧夏大學(xué)》2017年碩士論文
【摘要】:本課題是電網(wǎng)工程設(shè)計評審業(yè)務(wù)過程管控模式研究與信息系統(tǒng)建設(shè),主要是針對寧夏經(jīng)濟技術(shù)研究院在國家電網(wǎng)公司提出“三集五大”戰(zhàn)略的情況下,如何在評審業(yè)務(wù)上進行革新,以技術(shù)手段作為保證,以達到國家電網(wǎng)公司精益化管理的要求。在本研究主要采用目標(biāo)分解方法、過程控制方法對電網(wǎng)工程設(shè)計評審業(yè)務(wù)運行狀況和發(fā)展需求進行分析,革新電網(wǎng)工程設(shè)計評審過程管理模式,并充分考慮評審特點,緊跟需求,在現(xiàn)有資源基礎(chǔ)上,努力構(gòu)建即符合國家電網(wǎng)工程設(shè)計評審要求,又功能齊全、簡潔有效、安全性好的輸變電工程設(shè)計評審平臺,滿足項目設(shè)計評審的需要。電網(wǎng)工程設(shè)計評審管控系統(tǒng)建設(shè)符合目前工程設(shè)計評審工作信息化支撐的建設(shè)需求,以人為本,從實地出發(fā)解決目前工作中單位協(xié)同、申報標(biāo)準(zhǔn)畫、評審流程化、應(yīng)用自動化的管理需求。充分發(fā)揮信息化系統(tǒng)特點和優(yōu)勢,有效輔助公司從計劃制定執(zhí)行、資料目錄及申報標(biāo)準(zhǔn)、評審流程監(jiān)測和干預(yù)、評審質(zhì)量考評與分析等方面改變目前的管理模式,實現(xiàn)工程設(shè)計評審體系化管理,提高評審效率和質(zhì)量。
[Abstract]:This topic is the management and control mode research and information system construction of power grid engineering design review business process, mainly aimed at Ningxia Economic and technological Research Institute under the situation that the State Grid Company put forward "three sets and five big" strategy. How to carry on the innovation in the appraisal business, take the technical means as the guarantee, in order to meet the state grid company lean management request. In this study, the objective decomposition method and process control method are used to analyze the operation status and development requirements of power network engineering design review business, to innovate the management model of power network engineering design review process, and to take full account of the characteristics of the review. In keeping with the demand and on the basis of the existing resources, this paper tries to construct a design evaluation platform for transmission and transformation projects that meets the requirements of the State Grid Engineering Design Review, and has complete functions, simple and effective, and good safety, to meet the needs of project design review. The construction of power network engineering design review and control system accords with the construction needs of the current engineering design review work information support, people-oriented, from the field to solve the current work unit coordination, declaration standard drawing, review process, Application automation management requirements. Give full play to the characteristics and advantages of the information system, and effectively assist the company in changing the current management mode from the aspects of plan formulation and execution, data catalogue and declaration standards, monitoring and intervention of the review process, evaluation and quality evaluation and analysis, etc. To realize systematic management of engineering design review and improve the efficiency and quality of evaluation.
【學(xué)位授予單位】:寧夏大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:TP311.52;F426.61
【參考文獻】
相關(guān)期刊論文 前10條
1 韓成勇;;高校教科研項目網(wǎng)上評審系統(tǒng)設(shè)計與實現(xiàn)[J];電腦知識與技術(shù);2014年04期
2 孔曉昀;譚瀟;;電力信息化項目可行性研究管理模式的構(gòu)建[J];浙江電力;2014年01期
3 馬巧玲;;推進計劃管理的信息化管控模式[J];中外企業(yè)家;2013年13期
4 藍(lán)源娟;宋才華;張哲軍;鄭展;;電力企業(yè)知識管理系統(tǒng)研究與設(shè)計[J];經(jīng)營管理者;2013年08期
5 姚列健;吳勇;倪慧珍;;軟件項目如何進行進度管理[J];艦船防化;2013年01期
6 周紀(jì);;公安科技成果推廣項目評審系統(tǒng)的設(shè)計與實現(xiàn)[J];警察技術(shù);2013年01期
7 閻平;許子智;商浩亮;甘羽;張京晶;;電網(wǎng)全息數(shù)字地圖在工程初步設(shè)計評審的應(yīng)用[J];中國電力;2012年11期
8 王艷芳;白波;;國外科技項目評審調(diào)研及對我國的啟示[J];技術(shù)與創(chuàng)新管理;2012年03期
9 文必龍;鄒華麗;;基于角色流的數(shù)據(jù)交換技術(shù)研究[J];計算機技術(shù)與發(fā)展;2012年03期
10 陳陽;陳榕爭;;WBS:項目管理的基礎(chǔ)[J];工程建設(shè)與設(shè)計;2011年10期
相關(guān)碩士學(xué)位論文 前3條
1 趙廷勇;輸變電工程項目進度管理及優(yōu)化研究[D];華北電力大學(xué);2011年
2 趙登攀;項目評審系統(tǒng)的開發(fā)與實踐[D];西安工業(yè)大學(xué);2010年
3 任宏濤;一種通用的項目評審平臺研究[D];大連理工大學(xué);2004年
,本文編號:2016252
本文鏈接:http://sikaile.net/kejilunwen/ruanjiangongchenglunwen/2016252.html