基于BIM技術(shù)全壽命周期工程造價(jià)管理的探索
本文選題:BIM + 全壽命 ; 參考:《城市建設(shè)理論研究(電子版)》2016年29期
【摘要】:BIM已經(jīng)從引入我國開始十多年了,在現(xiàn)階段,我國BIM已經(jīng)有了很大的應(yīng)用發(fā)展,主要應(yīng)用在對建筑工程的建模、施工以及管理等等方面,但在具體建筑工程造價(jià)管理中的應(yīng)用依舊存在很多問題待解決。故而本文筆者針對建筑工程工程全壽命周期的造價(jià)管理工作中對BIM的應(yīng)用發(fā)展做了探析,針對現(xiàn)狀問題進(jìn)提出針對性的控制措施,以期更好的保證我國建筑工程造價(jià)管理中BIM技術(shù)的有效應(yīng)用發(fā)展。
[Abstract]:BIM has been introduced to China for more than 10 years. At the present stage, our country BIM has a great application development. It is mainly applied to the modeling, construction and management of construction engineering. However, there are still many problems to be solved in the application of the construction cost management. In the work of life cycle cost management, the application and development of BIM are discussed, and the specific control measures are put forward in order to ensure the effective application and development of BIM technology in the construction cost management of our country.
【作者單位】: 浙江方圓工程咨詢有限公司;
【分類號】:TU723.3
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 李志民;;淺談公路工程造價(jià)管理[J];科技資訊;2008年13期
2 任瑞梅;;試論公路工程造價(jià)管理的影響因素與策略[J];四川建材;2012年03期
3 王順林;;淺談公路工程造價(jià)管理[J];科技風(fēng);2012年14期
4 鄒婧;;高速公路的造價(jià)管理探析[J];科技致富向?qū)?2013年36期
5 張碩華;田富強(qiáng);;芻議建筑工程造價(jià)管理中全過程控制的應(yīng)用[J];江西建材;2014年08期
6 楊紅菊;;淺談建筑工程造價(jià)管理問題及對策[J];江西建材;2014年13期
7 劉春梅;;建筑工程造價(jià)管理存在的問題及對策分析[J];中華民居(下旬刊);2014年06期
8 張雨;;加強(qiáng)建筑工程造價(jià)管理力度的必要性和策略[J];城市建筑;2014年04期
9 希爾良;;對公路工程造價(jià)管理的認(rèn)識及建議[J];中華民居(下旬刊);2013年08期
10 劉燕;;建筑工程造價(jià)管理中存在的問題[J];江西建材;2014年17期
相關(guān)會議論文 前2條
1 雷兵山;段朝霞;;暫定價(jià)的造價(jià)管理及在工程中的應(yīng)用[A];2013年8月建筑科技與管理學(xué)術(shù)交流會論文集[C];2013年
2 王青;許淼;;工程造價(jià)管理中常見問題及對策[A];2014年5月建筑科技與管理學(xué)術(shù)交流會論文集[C];2014年
,本文編號:1880257
本文鏈接:http://sikaile.net/kejilunwen/ruanjiangongchenglunwen/1880257.html