地應(yīng)力測量技術(shù)研究與巷道支護(hù)工程應(yīng)用
發(fā)布時間:2019-06-12 17:12
【摘要】:徐莊煤礦-750水平東翼軌道大巷為永久性服務(wù)大巷,在巷道掘進(jìn)期間,巷道施工完成段的頂?shù)装寰霈F(xiàn)不同程度的變形破壞。針對巷道的異常變形,有必要對影響煤巖體結(jié)構(gòu)安全與穩(wěn)定的關(guān)鍵因素——地應(yīng)力,進(jìn)行探索與研究。本文在對地應(yīng)力測量理論、影響因素、計算誤差、測試系統(tǒng)及過程等深入研究的基礎(chǔ)上,在徐莊煤礦-750水平大巷東翼進(jìn)行了地應(yīng)力實測,并結(jié)合實測參數(shù)采用錨桿支護(hù)動態(tài)設(shè)計法進(jìn)行了加固修復(fù)設(shè)計,研究工作獲得主要結(jié)論有:(1)通過對地應(yīng)力測量理論、地應(yīng)力測量系統(tǒng)與測試過程研究的基礎(chǔ)上,在實驗室進(jìn)行了三軸應(yīng)變計的標(biāo)定,并編制了相應(yīng)的地應(yīng)力計算軟件。(2)采用空心包體應(yīng)力解除法對徐莊煤礦-750水平東翼軌道大巷與Ⅱ-Ⅰ采區(qū)通風(fēng)下口進(jìn)行了地應(yīng)力現(xiàn)場實測,實測結(jié)果表明:徐莊煤礦二水平東翼區(qū)域以水平構(gòu)造應(yīng)力為主,東西布置的軌道大巷承受近垂直的剪應(yīng)力作用。(3)基于地應(yīng)力實測的數(shù)值模擬修復(fù)設(shè)計,應(yīng)用于軌道大巷修復(fù)加固工程,礦壓觀測結(jié)果表明,巷道圍巖變形趨于穩(wěn)定。
[Abstract]:In Xuzhuang Coal Mine-750 horizontal east wing track, the main roadway is a permanent service roadway. During the driving of the laneway, different degrees of deformation and failure occur in the top floor of the tunnel construction completion section. In view of the abnormal deformation of the tunnel, it is necessary to explore and study the key factors that influence the safety and stability of the structural safety and stability of the coal rock mass. In this paper, on the basis of the in-depth study of the geostress measurement theory, the influence factors, the calculation error, the test system and the process, the ground stress measurement is carried out in the east wing of the horizontal large-lane of Xuzhuang Coal Mine-750, and the design of the reinforcement and repair is carried out by using the dynamic design method of the bolt support in combination with the measured parameters. The main conclusions are as follows: (1) The three-axis strain gauge calibration is carried out in the laboratory based on the ground stress measurement theory, the in-situ stress measurement system and the test process, and the corresponding ground stress calculation software is prepared. (2) The stress relief method of the hollow bag body is adopted to measure the ground stress field in the tunnel of the east wing of the horizontal east wing of Xuzhuang Coal Mine-750 and the ventilation port of the 鈪,
本文編號:2498169
[Abstract]:In Xuzhuang Coal Mine-750 horizontal east wing track, the main roadway is a permanent service roadway. During the driving of the laneway, different degrees of deformation and failure occur in the top floor of the tunnel construction completion section. In view of the abnormal deformation of the tunnel, it is necessary to explore and study the key factors that influence the safety and stability of the structural safety and stability of the coal rock mass. In this paper, on the basis of the in-depth study of the geostress measurement theory, the influence factors, the calculation error, the test system and the process, the ground stress measurement is carried out in the east wing of the horizontal large-lane of Xuzhuang Coal Mine-750, and the design of the reinforcement and repair is carried out by using the dynamic design method of the bolt support in combination with the measured parameters. The main conclusions are as follows: (1) The three-axis strain gauge calibration is carried out in the laboratory based on the ground stress measurement theory, the in-situ stress measurement system and the test process, and the corresponding ground stress calculation software is prepared. (2) The stress relief method of the hollow bag body is adopted to measure the ground stress field in the tunnel of the east wing of the horizontal east wing of Xuzhuang Coal Mine-750 and the ventilation port of the 鈪,
本文編號:2498169
本文鏈接:http://sikaile.net/kejilunwen/kuangye/2498169.html
最近更新
教材專著