千米全液壓坑道巖心鉆機(jī)設(shè)計(jì)
[Abstract]:Tunnel drilling can make use of the existing wells and roadways in old mining areas to explore deep resources, which can meet the needs of deep resources exploration. Tunnel drilling rig is the core equipment of tunnel drilling. The drilling depth, rotation speed, torque and other parameters of tunnel drilling rig produced at present in China can no longer meet the requirements of drilling technology parameters of deep-hole diamond rope core-drilling. On the basis of consulting the technical parameters and working principle of the tunnel drilling rig, this paper summarizes the development status of the rope coring drill, and designs a kind of fully hydraulic tunnel core drill combined with the concrete requirements of the coring technology. The mechanical mechanism and hydraulic circuit of drilling rig are designed according to the general design flow and method of drilling rig. The main research work is as follows: (1) through literature and market research, the development status and market demand of tunnel drilling rig are summarized, and the basic parameters of drilling rig are determined. According to the basic parameters, the main technical parameters of the actuator are calculated. (2) the layout of the drilling rig is determined, which includes drilling unit, power unit and operating table. Using skid chassis loading. (3) the load characteristics of each actuator are analyzed. According to its performance requirements, the speed regulation and voltage regulation methods of each loop are determined: the rotary circuit, the lifting circuit, The load sensitive loop is used in the cored winch circuit and the mud pump driving circuit. The drilling circuit adopts constant pressure drilling circuit. The power distribution mode of double pump and double system is determined, and the hydraulic principle diagram of the whole machine is worked out. (4) the technical parameters of hydraulic components are calculated, and the types and specifications of hydraulic motor, hydraulic pump and motor are selected. The double piston rod two-stage expansion cylinder is designed, and the piston rod is fixed to increase the stroke of the power head.
【學(xué)位授予單位】:中國(guó)地質(zhì)大學(xué)(北京)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:TD421
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 王劍華;;地質(zhì)系統(tǒng)地質(zhì)機(jī)械的研究與開發(fā)[J];廣東科技;2013年22期
2 閆旭光;聶永晉;狄麗莉;;國(guó)內(nèi)外煤層氣鉆機(jī)技術(shù)現(xiàn)狀及建議[J];輕工科技;2015年02期
3 殷新勝;田宏亮;姚克;孫保山;鄔迪;凡東;;ZDY6000L型履帶式全液壓坑道鉆機(jī)的研制[J];金屬礦山;2007年12期
4 耿令新;劉釗;吳仁智;張利娟;;工程機(jī)械負(fù)載敏感技術(shù)節(jié)能原理及應(yīng)用[J];機(jī)械傳動(dòng);2008年05期
5 宋菊峰;;潛孔鉆機(jī)導(dǎo)軌的結(jié)構(gòu)特點(diǎn)及其應(yīng)用[J];建筑機(jī)械;2008年07期
6 ;Technology of load-sensitivity used in the hydraulic system of an all-hydraulic core rig[J];Journal of Coal Science & Engineering(China);2009年03期
7 王成,杜海娥;MK-2型全液壓坑道鉆機(jī)[J];煤田地質(zhì)與勘探;1998年01期
8 郝世俊,張洪軍,韓仕洲,趙永哲;MK系列鉆機(jī)的開發(fā)及應(yīng)用[J];煤礦機(jī)械;2001年05期
9 殷新勝;田宏亮;姚克;凡東;孫保山;;負(fù)載敏感技術(shù)在全液壓動(dòng)力頭式坑道鉆機(jī)上的應(yīng)用[J];煤炭科學(xué)技術(shù);2008年01期
10 鄔迪;;分體式履帶鉆機(jī)的研制與應(yīng)用[J];金屬礦山;2014年03期
相關(guān)博士學(xué)位論文 前1條
1 田宏亮;全液壓動(dòng)力頭式鉆機(jī)液壓系統(tǒng)動(dòng)態(tài)分析及控制方法的研究[D];煤炭科學(xué)研究總院;2008年
,本文編號(hào):2411377
本文鏈接:http://sikaile.net/kejilunwen/kuangye/2411377.html