新興測量技術(shù)在嵩縣廟嶺金礦探采礦中的應(yīng)用
發(fā)布時間:2018-04-28 23:01
本文選題:礦山測量 + 探礦; 參考:《中國地質(zhì)大學(xué)(北京)》2015年碩士論文
【摘要】:河南省嵩縣廟嶺金礦于上世紀(jì)九十年代就開始采礦作業(yè),至今已有二十年之多,嵩縣廟嶺金礦經(jīng)過這么多年的生產(chǎn)建設(shè),已經(jīng)探明的礦產(chǎn)資源幾乎消耗殆盡,礦山受外部環(huán)境影響,資源占有率較低,保有資源儲量嚴(yán)重不足,因此,廟嶺金礦出現(xiàn)資源危機(jī)。所以廟嶺金礦急需改變目前的情況,必須系統(tǒng)收集區(qū)內(nèi)已有地質(zhì)資料的基礎(chǔ),礦山測量就是其中重要的一環(huán),可以說礦山測繪成果的好壞直接關(guān)系著廟嶺金礦后續(xù)的發(fā)展;趯︶钥h廟嶺金礦礦區(qū)全礦區(qū)地形測量,探礦工程測量(包括鉆孔、探槽、坑道等探礦工程),本文建立了廟嶺金礦礦區(qū)導(dǎo)線控制網(wǎng)16.2km,測量和編繪2000分之一的地形地質(zhì)圖8.6km2;在對礦體的形狀、體積、質(zhì)量等進(jìn)行測量的基礎(chǔ)上,編制了相關(guān)圖件。編制了采切和掘進(jìn)工程圖等圖件。對資源量進(jìn)行了估算,新增資源儲量礦石量1606733噸。按照探明的礦床和現(xiàn)有生產(chǎn)規(guī)模進(jìn)行經(jīng)濟(jì)估算,可延長嵩縣廟嶺金礦的礦山服務(wù)年限約為10年。
[Abstract]:The Miaoling Gold Mine of Songxian County, Henan Province, began mining operations in the 1990s and has been in operation for more than 20 years. After so many years of production and construction, the proven mineral resources of the Miaoling Gold Mine in Songxian County have almost been depleted. Under the influence of external environment, the mine has a low share of resources and a serious shortage of reserves. Therefore, there is a resource crisis in Miaoling Gold Mine. Therefore, it is urgent to change the present situation of Miaoling gold mine, and it is necessary to collect the basis of geological data in this area systematically. Mine survey is one of the most important parts. It can be said that the quality of mine surveying and mapping results is directly related to the subsequent development of Miaoling gold mine. Based on the topographic survey, prospecting engineering survey (including boreholes, grooves) in Miaoling gold mine area, Songxian County, In this paper, the traverse control network of Miaoling gold mine area is established in 16.2 km, and the topographic and geological map of 2000th part is measured and drawn up. Based on the survey of the shape, volume and mass of the orebody, the related maps are compiled. Drawing of mining and cutting and tunneling engineering drawing are worked out. Estimated the amount of resources, new reserves of 1606733 tons of ore. The mine service life of Miaoling gold deposit in Songxian County can be extended for about 10 years according to the economic estimation of the proved ore deposit and the existing production scale.
【學(xué)位授予單位】:中國地質(zhì)大學(xué)(北京)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2015
【分類號】:P618.51
【參考文獻(xiàn)】
相關(guān)期刊論文 前1條
1 朱麗偉;;利用AUTOCAD實現(xiàn)礦山地質(zhì)測量地圖的數(shù)字化[J];黑龍江科技信息;2010年03期
,本文編號:1817254
本文鏈接:http://sikaile.net/kejilunwen/kuangye/1817254.html
最近更新
教材專著