基于風險防控太鋼熱連軋設備狀態(tài)管理模式研究
發(fā)布時間:2019-01-18 08:39
【摘要】:由于專業(yè)技術和組織績效管理水平的不足,太鋼熱連軋廠的設備管理面臨較大挑戰(zhàn):TPM設備管理體系流于形式;故障時間居高不下,設備受控水平偏低;管理體系混亂,制度不健全;設備管理人員效率偏低。熱連軋2250mm生產線作為太鋼核心流程的關鍵工序之一,其設備管理狀況反映了太鋼以及全行業(yè)設備管理工作中普遍存在的問題。本文立足于解決太鋼熱連軋廠設備管理中的實際問題,在工作中不斷探索與實踐,以太鋼熱連軋2250mm生產線的設備管理作為主要研究內容,找出太鋼熱連軋廠設備管理中實際存在的問題,以設備故障分析、風險防控和設備狀態(tài)管理為突破點創(chuàng)立一種創(chuàng)新的設備管理模式,使之能夠緊密聯(lián)系現(xiàn)場,提升設備管理績效,并在全公司和全行業(yè)范圍內都具有一定的普適性和重要的參考價值。本文基于以上思路開展了一系列工作,首先對設備歷史故障進行分類分析,對高頻故障設備進行風險評估;然后建立全線設備重大風險防控管理體系,降低重大設備故障風險;接著梳理設備狀態(tài)管理要素,采取有效檢測有段,制定針對性技術管理措施;最后以風險防控為基礎,監(jiān)控設備運行狀態(tài),建立設備狀態(tài)管理體系。通過上述工作的開展最終能夠達到減少設備故障時間的目標,同時降低了設備維護成本,提升設備管理經(jīng)濟性,也提升設備管理人員作業(yè)效率。
[Abstract]:Due to the lack of professional technology and organizational performance management, the equipment management of TISCO hot strip mill is facing great challenges: the TPM equipment management system is a mere formality, the failure time is high, the equipment control level is on the low side; The management system is chaotic, the system is not perfect, and the equipment management personnel's efficiency is on the low side. As one of the key processes in the core process of TISCO, the equipment management of the 2250mm production line reflects the common problems in the equipment management of TISCO and the whole industry. This paper is based on solving the practical problems in the equipment management of TISCO hot strip mill, and makes continuous exploration and practice in the work, taking the equipment management of the 2250mm production line of TISCO as the main research content. To find out the actual problems in equipment management of hot strip mill of Taiyuan Iron and Steel Co., Ltd., to establish an innovative equipment management mode based on equipment failure analysis, risk prevention and control and equipment state management, so that it can be closely connected with the site. Improve the performance of equipment management, and in the whole company and the whole industry has a certain universality and important reference value. Based on the above ideas, this paper has carried out a series of work: firstly, classifying and analyzing the historical faults of equipment and evaluating the risk of high frequency fault equipment; secondly, establishing the management system of the major risk prevention and control of the whole line equipment to reduce the risk of the major equipment fault. Then combing the elements of equipment state management, taking effective detection section, making targeted technical management measures; finally, based on risk prevention and control, monitoring equipment running state, establishing equipment state management system. Through the above work, we can achieve the goal of reducing the equipment failure time, at the same time reducing the equipment maintenance cost, improving the equipment management economy, and also improving the equipment management staff operation efficiency.
【學位授予單位】:上海交通大學
【學位級別】:碩士
【學位授予年份】:2015
【分類號】:TG338
本文編號:2410515
[Abstract]:Due to the lack of professional technology and organizational performance management, the equipment management of TISCO hot strip mill is facing great challenges: the TPM equipment management system is a mere formality, the failure time is high, the equipment control level is on the low side; The management system is chaotic, the system is not perfect, and the equipment management personnel's efficiency is on the low side. As one of the key processes in the core process of TISCO, the equipment management of the 2250mm production line reflects the common problems in the equipment management of TISCO and the whole industry. This paper is based on solving the practical problems in the equipment management of TISCO hot strip mill, and makes continuous exploration and practice in the work, taking the equipment management of the 2250mm production line of TISCO as the main research content. To find out the actual problems in equipment management of hot strip mill of Taiyuan Iron and Steel Co., Ltd., to establish an innovative equipment management mode based on equipment failure analysis, risk prevention and control and equipment state management, so that it can be closely connected with the site. Improve the performance of equipment management, and in the whole company and the whole industry has a certain universality and important reference value. Based on the above ideas, this paper has carried out a series of work: firstly, classifying and analyzing the historical faults of equipment and evaluating the risk of high frequency fault equipment; secondly, establishing the management system of the major risk prevention and control of the whole line equipment to reduce the risk of the major equipment fault. Then combing the elements of equipment state management, taking effective detection section, making targeted technical management measures; finally, based on risk prevention and control, monitoring equipment running state, establishing equipment state management system. Through the above work, we can achieve the goal of reducing the equipment failure time, at the same time reducing the equipment maintenance cost, improving the equipment management economy, and also improving the equipment management staff operation efficiency.
【學位授予單位】:上海交通大學
【學位級別】:碩士
【學位授予年份】:2015
【分類號】:TG338
【參考文獻】
相關期刊論文 前2條
1 常英杰;冶金設備的狀態(tài)維修[J];中國設備管理;1996年01期
2 王一德;太鋼不銹鋼的現(xiàn)狀與發(fā)展[J];中國有色金屬學報;2004年S1期
相關博士學位論文 前1條
1 王慶鋒;基于風險和狀態(tài)的智能維修決策優(yōu)化系統(tǒng)及應用研究[D];北京化工大學;2011年
相關碩士學位論文 前1條
1 王海峰;企業(yè)設備管理研究[D];南京理工大學;2006年