小曲率半徑轉(zhuǎn)彎段盾構(gòu)施工隧道特性研究
[Abstract]:In the selection of underground shield track, due to the restriction of planning, construction and structure, it is usually necessary to use a curved tunnel with small curvature radius to bypass the dense buildings and all kinds of pipelines in the city. From the long-term development of urban underground tunnel, the construction task of small curvature radius tunnel will be more and more. However, the deformation of soil, the stress of tunnel segment and the environmental safety problems caused by the shield construction of small curvature radius tunnel are very complex, which are the key problems in the construction design and construction safety of shield tunnel. It is directly related to the construction safety, quality and cost of the project. According to the characteristics of shield construction in the turning section of small curvature radius, the monitoring scheme of the influence of shield construction on the deformation of surrounding soil, soil stress and tunnel segment stress is worked out in this paper. Through in situ test, the layered settlement, deep horizontal displacement, pore water pressure, earth pressure and tunnel segment stress in shield tunnel construction with small curvature radius turning section are monitored. Combined with the field situation and the existing related theories, the monitoring data are analyzed, and the following results are obtained: (1) the variation of soil displacement, soil pore water pressure and soil pressure caused by shield construction of small curvature radius tunnel. (2) the variation of axial stress and circumferential stress of segment caused by shield construction in curved section of tunnel with small curvature radius. At the same time, the above laws of the turning section of the small curvature radius tunnel are compared with those of the straight line shield tunnel, and its characteristics are obtained, which can provide a reference for the design, construction and environmental safety protection of the small curvature radius tunnel.
【學(xué)位授予單位】:華南理工大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:U455.43
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 談小龍,朱偉,秦建設(shè),杉本光隆;盾構(gòu)法隧道施工中盾構(gòu)控制滯后效應(yīng)的研究[J];地下空間;2004年01期
2 葉雅圖;王世君;王琪;;小半徑上下重疊地鐵盾構(gòu)隧道設(shè)計(jì)與施工[J];地下空間與工程學(xué)報(bào);2008年04期
3 侯學(xué)淵,廖少明;盾構(gòu)隧道沉降預(yù)估[J];地下工程與隧道;1993年04期
4 秦建設(shè),尤愛菊;盾構(gòu)隧道開挖面穩(wěn)定數(shù)值模擬研究[J];礦山壓力與頂板管理;2005年01期
5 高俊強(qiáng),胡燦;盾構(gòu)推進(jìn)和地表沉降的變化關(guān)系探討[J];南京工業(yè)大學(xué)學(xué)報(bào)(自然科學(xué)版);2005年04期
6 李東海;劉軍;劉繼堯;鄭知斌;;盾構(gòu)隧道施工引起的地表沉降因素分析[J];市政技術(shù);2008年02期
7 李桂花;盾構(gòu)法施工引起的地面沉陷的估算方法[J];同濟(jì)大學(xué)學(xué)報(bào);1986年02期
8 易宏偉,孫鈞;盾構(gòu)施工對(duì)軟粘土的擾動(dòng)機(jī)理分析[J];同濟(jì)大學(xué)學(xué)報(bào)(自然科學(xué)版);2000年03期
9 趙運(yùn)臣;盾構(gòu)隧道曲線段管片破損原因分析[J];西部探礦工程;2002年03期
10 張志勇;盾構(gòu)施工對(duì)周圍環(huán)境影響研究綜述[J];現(xiàn)代隧道技術(shù);2002年02期
本文編號(hào):2476326
本文鏈接:http://sikaile.net/kejilunwen/jiaotonggongchenglunwen/2476326.html