港珠澳大橋CB04標(biāo)段131號墩臺吊裝結(jié)構(gòu)設(shè)計及分析
[Abstract]:Modular hoisting of prefabricated parts (whole piers) in CB04 section of Hong Kong-Zhuhai-Macao Bridge is a key link in the construction of Hong Kong-Zhuhai-Macao Bridge. The operation is more difficult, the environment is dangerous and complex, and the engineering precision is required. The pier and abutment are reinforced concrete structure with a total weight of 2044 tons. In view of the large self-weight of the lifting parts and the complicated working environment of the lifting, in order to ensure the safety, reliability, accuracy and stability of the lifting process of the whole pier module, This paper designs a set of safe and feasible complex hoisting system, including the hanger, the upper hanger, the lower hanger and the hanger, and so on. The steel box girder structure has the advantages of high bending and torsion resistance, high stability, high fatigue resistance, high lifting capacity, low deflection and deformation, taking into account such factors as feasibility, economy and construction environment, etc. The steel box girder structure is finally selected for the pier and abutment hoisting hanger. It is also very important for the material selection of hanger members. Q420B low alloy steel and Q345B low alloy steel are used for the main parts of the steel box girder type hoisting member, such as the cover plate and the outer web, while the secondary material such as the reinforcement plate, the partition and the sealing plate are used as the Q345B low alloy steel. The connecting shaft and high strength bolt are made of 40Cr material. According to different lifting weight and other factors, the cable used in pier and abutment hoisting is selected as high-performance joint-free rope. In this paper, the structure design, three-dimensional modeling, finite element stress-strain analysis and reliability analysis of the whole structure of the lifting crane are carried out by using HyperMesh,Ansys and other software, combined with the design scheme of the crane on the pier and abutment. According to the analysis structure, the hanger structure is further optimized and improved, the final scheme is obtained, and the hoisting technological process is worked out according to the result of the analysis of the hanger. The results show that the first-order buckling coefficient is 27.334, the second-order buckling coefficient is 29.451 and the third-order buckling coefficient is 40.984. The stability of the suspension structure is good and meets the engineering requirements. The stress and strain values of the hanger structure are within the allowable range of the material, so the strength and stiffness of the suspension structure meet the engineering requirements. The research in this paper provides technical guarantee for modular hoisting safety and safe operation of prefabricated parts (whole pier) of CB04 section of Hong Kong-Zhuhai-Macao Bridge, at the same time, it can improve the efficiency and accuracy of the hoisting process of large-scale components. Safety and predictability of behavior are of great significance.
【學(xué)位授予單位】:大連交通大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:U445.559
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 晟華;;港珠澳大橋年內(nèi)將啟動招標(biāo)[J];筑路機械與施工機械化;2008年03期
2 ;港珠澳大橋三方投資比例確定[J];公路;2008年03期
3 ;總投資422億的港珠澳大橋已進(jìn)入地質(zhì)勘探階段[J];新經(jīng)濟(jì)雜志;2008年03期
4 ;港珠澳大橋外業(yè)勘察通過驗收[J];中外公路;2008年03期
5 ;港珠澳大橋有望年內(nèi)開工[J];城市道橋與防洪;2009年02期
6 ;港珠澳大橋有望2009年底開工[J];施工技術(shù);2009年03期
7 ;港珠澳大橋關(guān)鍵技術(shù)項目列入國家科技支撐計劃[J];商品混凝土;2010年07期
8 ;港珠澳大橋關(guān)鍵技術(shù)項目列入國家科技支撐計劃[J];中外公路;2010年04期
9 溫建華;;港珠澳大橋島隧工程動工儀式舉行[J];中國港灣建設(shè);2011年01期
10 ;港珠澳大橋建設(shè)施工示意總圖(一)[J];珠江水運;2012年19期
相關(guān)會議論文 前10條
1 ;港珠澳大橋終于通過論證確定[A];中國物流與采購聯(lián)合會會員通訊總第33期-52期(2003年2月-12月)[C];2003年
2 柴建峰;陳曉東;孟凡超;程新生;孫連合;羊小云;李友龍;李學(xué)文;萬仁凱;;港珠澳大橋主體工程初勘工作介紹[A];2010年全國工程地質(zhì)學(xué)術(shù)年會暨“工程地質(zhì)與海西建設(shè)”學(xué)術(shù)大會論文集[C];2010年
3 張東斌;;港珠澳大橋島隧工程鋼筋自動化加工技術(shù)[A];中國建筑學(xué)會建筑施工分會、中國工程機械工業(yè)協(xié)會施工機械化分會2012年會暨機械化施工新技術(shù)經(jīng)驗交流會會刊[C];2012年
4 董潤潤;劉武君;彭為;;港珠澳大橋珠?诎堕_發(fā)資金平衡分析[A];2012管理創(chuàng)新、智能科技與經(jīng)濟(jì)發(fā)展研討會論文集[C];2012年
5 鄭定寧;;港珠澳大橋規(guī)模及規(guī)劃概況[A];第十九屆全國橋梁學(xué)術(shù)會議論文集(上冊)[C];2010年
6 王馳;徐群;王學(xué)蘭;;港珠澳大橋整體物理模型試驗管理研究[A];第十六屆中國海洋(岸)工程學(xué)術(shù)討論會(下冊)[C];2013年
7 劉曉東;;港珠澳大橋總體設(shè)計與技術(shù)挑戰(zhàn)[A];第十五屆中國海洋(岸)工程學(xué)術(shù)討論會論文集(上)[C];2011年
8 陳洋洋;譚平;周福霖;陳樹輝;;港珠澳大橋隔震方案的非線性動力學(xué)分析[A];第十四屆全國非線性振動暨第十一屆全國非線性動力學(xué)和運動穩(wěn)定性學(xué)術(shù)會議摘要集與會議議程[C];2013年
9 李步恩;邱輝元;;港珠澳大橋島隧工程西人工島隧道防水施工技術(shù)[A];防水堵漏材料及施工技術(shù)交流會論文集[C];2014年
10 孟凡超;劉曉東;徐國平;;港珠澳大橋主體工程總體設(shè)計[A];第十九屆全國橋梁學(xué)術(shù)會議論文集(上冊)[C];2010年
相關(guān)重要報紙文章 前10條
1 楊興云;深中大橋立項在即港珠澳大橋恐添變數(shù)[N];經(jīng)濟(jì)觀察報;2006年
2 本報記者 楊興云;三地政府兩套方案 港珠澳大橋融資難題待解[N];經(jīng)濟(jì)觀察報;2007年
3 楊興云;深中大橋立項在即 港珠澳大橋添變數(shù)[N];經(jīng)理日報;2006年
4 本報記者 魯宓;港珠澳大橋緣何遲遲未動工[N];亞太經(jīng)濟(jì)時報;2006年
5 記者 趙民望;“三地三檢”破港珠澳大橋難題[N];中華工商時報;2006年
6 發(fā)文;港珠澳大橋?qū)X?zé)小組成立并召開第一次會議[N];中華建筑報;2007年
7 鄭曉波;港珠澳大橋建設(shè)加速啟動[N];證券時報;2007年
8 本報記者 杜娟邋饒貞 駱建基 劉海健;港珠澳大橋最遲后年開工[N];廣州日報;2008年
9 忠欣;廣東港珠澳大橋設(shè)計對外招標(biāo)[N];中國海洋報;2008年
10 本報記者 索佩敏;融資問題解決 港珠澳大橋年內(nèi)開工[N];上海證券報;2009年
相關(guān)碩士學(xué)位論文 前6條
1 張陽;港珠澳大橋珠海落腳點交通一體化—道路規(guī)劃的初步研究[D];天津大學(xué);2010年
2 冼超文;港珠澳大橋?qū)χ楹J挟a(chǎn)業(yè)政策發(fā)展的影響及優(yōu)化研究[D];吉林大學(xué);2013年
3 劉洹宇;港珠澳大橋?qū)^(qū)域發(fā)展及交通運輸?shù)挠绊懛治鲅芯縖D];華南理工大學(xué);2010年
4 王艷珍;港珠澳大橋沉管隧道干塢塢址方案比選與環(huán)境影響研究[D];天津大學(xué);2013年
5 湯召志;港珠澳大橋沉管隧道運營通風(fēng)節(jié)能技術(shù)研究[D];西南交通大學(xué);2012年
6 孫偉;港珠澳大橋主塔塔身結(jié)構(gòu)模塊化吊裝有限元分析[D];大連交通大學(xué);2014年
,本文編號:2456584
本文鏈接:http://sikaile.net/kejilunwen/jiaotonggongchenglunwen/2456584.html