公路工程項(xiàng)目進(jìn)度管理信息系統(tǒng)的研究與實(shí)現(xiàn)
[Abstract]:With the rapid development of social economy and science and technology, and the rapid development of computer, the information system based on computer and communication technology is in a period of vigorous development. Because of the undeveloped computer technology in the past, people are used to managing documents and information in the traditional way, and there are many common disadvantages of manual work, such as low efficiency, safety checking, and increasing over time. It accumulates a large amount of files and data, which can cause great inconvenience to maintenance, search and update operations. Therefore, the management of information by computer is a very urgent need, but also a solid step for paperless office. After analysis, we use Oracle database management system in the establishment of database. Third, we need to continuously improve the requirement analysis of the information management system, and strive to achieve the system that customers need. At the same time, the highway project schedule management information system is elaborated in detail, and the database is also described, and then the information table is listed and the related fields and their attributes are given. This paper mainly studies and designs the highway project schedule management information system from the following aspects: starting from the actual demand of highway engineering management, focusing on the project schedule management, Learn from the successful cases of project schedule management at home and abroad through investigation and research. Then, according to the particularity of highway project, the function and performance of the system are analyzed, and the overall structure of the system is obtained. According to the requirement analysis, the system business process and the sub-flow of each function module are obtained. Then, the system is designed in detail according to the existing outline design flow, and the function realization flow of each functional module is designed in detail. According to the function design of the detailed design stage, the prototype development model is used to code the highway project schedule management information system, and the corresponding test cases are written according to the system function for unit test. Here, because the system adopts prototype development mode, so the system has to go through many stages of trial operation, when there is a problem in the process of system trial operation, the system needs to be modified and improved. Finally, we get a schedule management system that can satisfy the users.
【學(xué)位授予單位】:天津大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:U415.13-39;TP311.52
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 羅萍萍;夏巍;林濟(jì)鏗;張耀先;趙沛虎;;工程項(xiàng)目管理系統(tǒng)的設(shè)計(jì)與實(shí)現(xiàn)[J];電力系統(tǒng)及其自動(dòng)化學(xué)報(bào);2011年03期
2 黃川波;彭霈;吳榮;;基于CMM的MIS項(xiàng)目管理系統(tǒng)的研究[J];福建電腦;2006年08期
3 李潔姬;;公司項(xiàng)目進(jìn)度管理信息系統(tǒng)的設(shè)計(jì)與實(shí)現(xiàn)[J];電子制作;2013年05期
4 謝寶智;王劉凱;;基于XML和Web Service的數(shù)據(jù)集成中間件[J];信息技術(shù);2010年01期
5 韓宗海;費(fèi)奇;;基于本體論的項(xiàng)目管理信息集成[J];計(jì)算機(jī)科學(xué);2008年08期
6 劉躍華;;基于Web的流程驅(qū)動(dòng)工程項(xiàng)目管理系統(tǒng)研究與實(shí)現(xiàn)[J];計(jì)算機(jī)工程與科學(xué);2009年06期
7 方國(guó)華;;基于Web的工程項(xiàng)目管理系統(tǒng)的開發(fā)[J];農(nóng)業(yè)網(wǎng)絡(luò)信息;2010年03期
8 黃越;游丹;楊存榜;熊勇;;基于PowerBuilder DataWindow的項(xiàng)目進(jìn)度管理的設(shè)計(jì)與實(shí)現(xiàn)[J];計(jì)算機(jī)與現(xiàn)代化;2013年01期
9 郭波;高潔;;新建變電站項(xiàng)目進(jìn)度管理及應(yīng)用研究[J];技術(shù)與創(chuàng)新管理;2013年01期
10 陳艾;秦玲;孟波;;淺議如何在ERP系統(tǒng)中實(shí)現(xiàn)項(xiàng)目管理[J];中國(guó)市場(chǎng);2010年49期
本文編號(hào):2417554
本文鏈接:http://sikaile.net/kejilunwen/jiaotonggongchenglunwen/2417554.html