沙特阿拉伯諾拉公主大學APM高架橋
發(fā)布時間:2018-12-12 09:15
【摘要】:正2012年5月,沙特阿拉伯首都利雅得北郊的諾拉公主大學校園內(nèi)修建了內(nèi)部使用的旅客自動輸送系統(tǒng)(Automated People Mover,簡稱APM)高架橋,橋長12km,上部結(jié)構(gòu)由跨徑16~42.5m的簡支箱梁和連續(xù)箱梁組成,箱梁標準寬度8.8m,梁高2.25m。下部結(jié)構(gòu)為400個柱式橋墩,采用明挖基
[Abstract]:In May 2012, a 12km-long viaduct was built on the campus of Princess Nora University in the northern suburb of Riyadh, Saudi Arabia, with an internally used automated passenger transport system, (Automated People Mover, or APM. The superstructure consists of simply supported box girder and continuous box girder with a span of 16 ~ 42.5 m. The standard width of box girder is 8.8 m and the beam height is 2.25 m. The substructure is 400 column piers with open excavation foundation
【分類號】:U448.28
本文編號:2374319
[Abstract]:In May 2012, a 12km-long viaduct was built on the campus of Princess Nora University in the northern suburb of Riyadh, Saudi Arabia, with an internally used automated passenger transport system, (Automated People Mover, or APM. The superstructure consists of simply supported box girder and continuous box girder with a span of 16 ~ 42.5 m. The standard width of box girder is 8.8 m and the beam height is 2.25 m. The substructure is 400 column piers with open excavation foundation
【分類號】:U448.28
【相似文獻】
相關(guān)期刊論文 前7條
1 趙宜軍;關(guān)于APM軟件的應(yīng)用[J];安徽建筑;1999年06期
2 姜立,陳岱林;APM中的透視消隱技術(shù)[J];工程設(shè)計CAD及自動化;1998年02期
3 黃進,方守恩;交互式道路安全設(shè)計模型IHSDM與事故預(yù)測模型APM[J];交通與計算機;2002年05期
4 郝雁峰;鐘淋;;廣州地鐵APM觀光線路大客流組織分析[J];科技風;2012年01期
5 蔡紅;王彥吉;林新建;;探討Honeywell TDC3000系統(tǒng)APM柜24VDC電源的改造[J];自動化技術(shù)與應(yīng)用;2010年09期
6 王亞平;;廣州自動導軌系統(tǒng)車輛基地的設(shè)計[J];鐵道機車車輛工人;2009年07期
7 姜立,陳岱林,沈文都;APM 軟件中的立面裝飾和立面柵格[J];建筑科學;1998年03期
相關(guān)重要報紙文章 前3條
1 孫愛民;中國將掀起APM新浪潮[N];中國電子報;2004年
2 湯雨潔;香港設(shè)計年@apm[N];美術(shù)報;2012年
3 商報記者 劉宇;北京apm聯(lián)姻蘋果的秘密[N];北京商報;2012年
,本文編號:2374319
本文鏈接:http://sikaile.net/kejilunwen/jiaotonggongchenglunwen/2374319.html
教材專著