港珠澳大橋主塔塔身結(jié)構(gòu)模塊化吊裝有限元分析
[Abstract]:The construction of Hong Kong-Zhuhai-Macao Bridge is a large-scale cross-sea bridge construction project connecting Hong Kong, Zhuhai and Macao. This paper takes the cable tower crane of the cable-stayed bridge in the river and sea channel of Hong Kong, Zhuhai-Macao Bridge as the background. The cable tower structure of cable-stayed bridge is analyzed in detail, and the stress condition of cable tower in modular integral hoisting process is analyzed and calculated. As the iconic building of the whole bridge construction, the cable tower has a height of 110 m and a weight of 2650 t. In addition, the hoisting operation is carried out on the sea surface, which is affected by the site and environment factors, which makes the cable tower crane one of the most risky and difficult engineering marks in the whole project. The construction process of cable tower crane is divided into lifting, turning over, transposing and shifting. In order to ensure the safety, reliability and accuracy of the whole module hoisting process, it is necessary to evaluate the safety of the main tower crane. This paper chooses 0.45. And 90. Three typical hoisting conditions were used as the simulation object. The stress of the connection section between the cable tower and the hoist was analyzed by using the Ansys finite element analysis software under the action of the hoisting gear and its own gravity. The analysis shows that the strength and stiffness of the cable tower do not meet the requirements in the process of hoisting. According to the analysis results, the stress concentration area of the cable tower is determined by using the Ansys fixed value display function module when hoisting the tower under three hoisting conditions. According to the internal structure of the cable tower connecting the cable tower and the hanger, the cable tower is strengthened by adding stiffening plate and strengthening channel steel. Finally, the strength, stiffness and stability of the reinforced cable tower under three hoisting conditions are rechecked. The results show that the strengthened cable tower strength, stiffness and stability all meet the requirements.
【學(xué)位授予單位】:大連交通大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:U448.27
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 晟華;;港珠澳大橋年內(nèi)將啟動(dòng)招標(biāo)[J];筑路機(jī)械與施工機(jī)械化;2008年03期
2 ;港珠澳大橋三方投資比例確定[J];公路;2008年03期
3 ;總投資422億的港珠澳大橋已進(jìn)入地質(zhì)勘探階段[J];新經(jīng)濟(jì)雜志;2008年03期
4 ;港珠澳大橋外業(yè)勘察通過(guò)驗(yàn)收[J];中外公路;2008年03期
5 ;港珠澳大橋有望年內(nèi)開(kāi)工[J];城市道橋與防洪;2009年02期
6 ;港珠澳大橋有望2009年底開(kāi)工[J];施工技術(shù);2009年03期
7 ;港珠澳大橋關(guān)鍵技術(shù)項(xiàng)目列入國(guó)家科技支撐計(jì)劃[J];商品混凝土;2010年07期
8 ;港珠澳大橋關(guān)鍵技術(shù)項(xiàng)目列入國(guó)家科技支撐計(jì)劃[J];中外公路;2010年04期
9 溫建華;;港珠澳大橋島隧工程動(dòng)工儀式舉行[J];中國(guó)港灣建設(shè);2011年01期
10 ;港珠澳大橋建設(shè)施工示意總圖(一)[J];珠江水運(yùn);2012年19期
相關(guān)會(huì)議論文 前10條
1 ;港珠澳大橋終于通過(guò)論證確定[A];中國(guó)物流與采購(gòu)聯(lián)合會(huì)會(huì)員通訊總第33期-52期(2003年2月-12月)[C];2003年
2 柴建峰;陳曉東;孟凡超;程新生;孫連合;羊小云;李友龍;李學(xué)文;萬(wàn)仁凱;;港珠澳大橋主體工程初勘工作介紹[A];2010年全國(guó)工程地質(zhì)學(xué)術(shù)年會(huì)暨“工程地質(zhì)與海西建設(shè)”學(xué)術(shù)大會(huì)論文集[C];2010年
3 張東斌;;港珠澳大橋島隧工程鋼筋自動(dòng)化加工技術(shù)[A];中國(guó)建筑學(xué)會(huì)建筑施工分會(huì)、中國(guó)工程機(jī)械工業(yè)協(xié)會(huì)施工機(jī)械化分會(huì)2012年會(huì)暨機(jī)械化施工新技術(shù)經(jīng)驗(yàn)交流會(huì)會(huì)刊[C];2012年
4 董潤(rùn)潤(rùn);劉武君;彭為;;港珠澳大橋珠?诎堕_(kāi)發(fā)資金平衡分析[A];2012管理創(chuàng)新、智能科技與經(jīng)濟(jì)發(fā)展研討會(huì)論文集[C];2012年
5 鄭定寧;;港珠澳大橋規(guī)模及規(guī)劃概況[A];第十九屆全國(guó)橋梁學(xué)術(shù)會(huì)議論文集(上冊(cè))[C];2010年
6 王馳;徐群;王學(xué)蘭;;港珠澳大橋整體物理模型試驗(yàn)管理研究[A];第十六屆中國(guó)海洋(岸)工程學(xué)術(shù)討論會(huì)(下冊(cè))[C];2013年
7 劉曉東;;港珠澳大橋總體設(shè)計(jì)與技術(shù)挑戰(zhàn)[A];第十五屆中國(guó)海洋(岸)工程學(xué)術(shù)討論會(huì)論文集(上)[C];2011年
8 陳洋洋;譚平;周福霖;陳樹(shù)輝;;港珠澳大橋隔震方案的非線性動(dòng)力學(xué)分析[A];第十四屆全國(guó)非線性振動(dòng)暨第十一屆全國(guó)非線性動(dòng)力學(xué)和運(yùn)動(dòng)穩(wěn)定性學(xué)術(shù)會(huì)議摘要集與會(huì)議議程[C];2013年
9 李步恩;邱輝元;;港珠澳大橋島隧工程西人工島隧道防水施工技術(shù)[A];防水堵漏材料及施工技術(shù)交流會(huì)論文集[C];2014年
10 孟凡超;劉曉東;徐國(guó)平;;港珠澳大橋主體工程總體設(shè)計(jì)[A];第十九屆全國(guó)橋梁學(xué)術(shù)會(huì)議論文集(上冊(cè))[C];2010年
相關(guān)重要報(bào)紙文章 前10條
1 楊興云;深中大橋立項(xiàng)在即港珠澳大橋恐添變數(shù)[N];經(jīng)濟(jì)觀察報(bào);2006年
2 本報(bào)記者 楊興云;三地政府兩套方案 港珠澳大橋融資難題待解[N];經(jīng)濟(jì)觀察報(bào);2007年
3 楊興云;深中大橋立項(xiàng)在即 港珠澳大橋添變數(shù)[N];經(jīng)理日?qǐng)?bào);2006年
4 本報(bào)記者 魯宓;港珠澳大橋緣何遲遲未動(dòng)工[N];亞太經(jīng)濟(jì)時(shí)報(bào);2006年
5 記者 趙民望;“三地三檢”破港珠澳大橋難題[N];中華工商時(shí)報(bào);2006年
6 發(fā)文;港珠澳大橋?qū)X?zé)小組成立并召開(kāi)第一次會(huì)議[N];中華建筑報(bào);2007年
7 鄭曉波;港珠澳大橋建設(shè)加速啟動(dòng)[N];證券時(shí)報(bào);2007年
8 本報(bào)記者 杜娟邋饒貞 駱建基 劉海健;港珠澳大橋最遲后年開(kāi)工[N];廣州日?qǐng)?bào);2008年
9 忠欣;廣東港珠澳大橋設(shè)計(jì)對(duì)外招標(biāo)[N];中國(guó)海洋報(bào);2008年
10 本報(bào)記者 索佩敏;融資問(wèn)題解決 港珠澳大橋年內(nèi)開(kāi)工[N];上海證券報(bào);2009年
相關(guān)碩士學(xué)位論文 前6條
1 張陽(yáng);港珠澳大橋珠海落腳點(diǎn)交通一體化—道路規(guī)劃的初步研究[D];天津大學(xué);2010年
2 冼超文;港珠澳大橋?qū)χ楹J挟a(chǎn)業(yè)政策發(fā)展的影響及優(yōu)化研究[D];吉林大學(xué);2013年
3 劉洹宇;港珠澳大橋?qū)^(qū)域發(fā)展及交通運(yùn)輸?shù)挠绊懛治鲅芯縖D];華南理工大學(xué);2010年
4 王艷珍;港珠澳大橋沉管隧道干塢塢址方案比選與環(huán)境影響研究[D];天津大學(xué);2013年
5 湯召志;港珠澳大橋沉管隧道運(yùn)營(yíng)通風(fēng)節(jié)能技術(shù)研究[D];西南交通大學(xué);2012年
6 孫偉;港珠澳大橋主塔塔身結(jié)構(gòu)模塊化吊裝有限元分析[D];大連交通大學(xué);2014年
,本文編號(hào):2265622
本文鏈接:http://sikaile.net/kejilunwen/jiaotonggongchenglunwen/2265622.html