城市軌道交通施工期間的交通組織方案研究
[Abstract]:Urban rail transit is a new type of public transportation mode with the characteristics of large volume and high efficiency. In recent years, it has been widely used in large and medium-sized cities throughout the country. And more cities are also planning to build urban rail transit projects as an important measure to alleviate the growing urban traffic conflicts. However, due to such factors as large construction scope, long construction period, large manpower and material resources, and high demand for urban road network, rail transit will bring great pressure on urban traffic, especially in old urban areas, during the construction period. If there is no reasonable and effective traffic organization during construction, urban traffic will be paralyzed. This paper is a master of engineering thesis characterized by engineering application, so the focus of this paper is to apply scientific theory to practical project design, by combining traffic engineering, urban traffic planning, traffic engineering and facility design. The theoretical knowledge of urban rail transit and other disciplines is summed up and applied to the traffic organization scheme design of Dongfanghong Square Station of Lanzhou Rail Transit Line 1 during the construction period. This paper begins with the construction environment of rail transit, and makes a detailed study on the different classification of construction environment. The difference of construction environment directly affects the rationality of traffic organization scheme design during construction. While researching and analyzing the construction environment, we also need to collect and organize a large amount of basic data, which will become the basic data used in the post-processing model. In this paper, the construction method of rail transit is studied. The construction period of different construction method is different, and the traffic influence and scope are different. Therefore, the selection of construction method is also an important reference condition for the formulation of traffic organization plan; thirdly, the road traffic situation during the construction period should be taken as the basic premise for the formulation of the traffic organization plan during the track construction. Therefore, the traffic volume during construction must be predicted professionally. In this paper, the basic OD data are obtained by using the background OD matrix calculation method, which is commonly used in China, to calculate the background OD of the present situation. After that, the basic OD is predicted by the traffic simulation software TransCAD, and the background ODs during the track construction period are obtained. Finally, the OD value is reallocated to the road network to obtain the road network saturation for the predicted year. Finally, on the basis of the above theoretical research, this paper applies the theory to engineering practice by taking the traffic organization scheme design of Dongfanghong Square Station of Lanzhou Rail Transit Line 1 during the construction period as an example. Firstly, it scientifically determines the scope of traffic impact during construction, combs the main roads and intersections in the affected area. Then, it investigates the basic data of all road networks and intersections in the traffic impact area. Based on these data, the saturation of the road network and the saturation during the construction period are calculated, and the saturation information of the road network during the construction period is calculated. This paper introduces the theory of one-way traffic and the theory of road shunt and combines the relevant road design code to carry out a new channelization design of roads and intersections in the affected areas. It provides an important road condition for drawing up the plan of social vehicles and public transport vehicles during the construction period. Finally, the traffic simulation software Vissim is used to comprehensively evaluate the traffic indexes of the traffic organization scheme. And put forward relevant suggestions for the reference of decision makers.
【學(xué)位授予單位】:蘭州交通大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:U491
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 桑健;王秀玲;;上海軌道交通10號(hào)線江灣體育場(chǎng)站施工交通對(duì)策[J];城市道橋與防洪;2009年01期
2 陸化普,史其信,殷亞峰;交通影響評(píng)價(jià)的基本思想與方法[J];城市規(guī)劃;1996年04期
3 周逸影;邱崇珊;魏德剛;;城市地鐵施工期間交通組織分析及改善建議——以成都市地鐵二號(hào)線為例[J];城市公用事業(yè);2010年04期
4 覃國添;申麗霞;王金秋;;地鐵施工期間交通疏解工作思路與方法[J];城市交通;2006年04期
5 張新蘭;朱學(xué)杰;劉彤;;十一運(yùn)會(huì)開幕式交通組織評(píng)述[J];城市交通;2010年02期
6 岡田宏;東京城市軌道交通系統(tǒng)的規(guī)劃、建設(shè)和管理[J];城市軌道交通研究;2003年03期
7 劉洪波;黃愛軍;;蓋挖法施工在上海軌道交通11號(hào)線愚園路站中的應(yīng)用[J];城市軌道交通研究;2006年12期
8 張存;;地鐵車站施工中的地面交通組織方案[J];城市軌道交通研究;2008年02期
9 楊華;楊濤;周同雷;;城市軌道站點(diǎn)工程施工期間交通疏解分析——以南寧市軌道一號(hào)線試點(diǎn)站場(chǎng)為例[J];廣西城鎮(zhèn)建設(shè);2010年09期
10 周茂松,吳兵;美國道路作業(yè)區(qū)交通管理研究與啟示[J];中外公路;2005年01期
相關(guān)博士學(xué)位論文 前1條
1 左忠義;城市軌道交通樞紐區(qū)域公交客流疏解組織優(yōu)化與設(shè)計(jì)方法[D];北京交通大學(xué);2013年
本文編號(hào):2156478
本文鏈接:http://sikaile.net/kejilunwen/jiaotonggongchenglunwen/2156478.html