斜塔斜拉橋的塔梁同步施工方法研究
[Abstract]:This paper discusses whether the synchronous construction method of tower and beam can be applied to the main line of inclined tower cable-stayed bridge, taking the main bridge of Kuangze County, Fujian Province as the research background. The main research work is as follows: 1) this paper introduces the general situation of the project and establishes the simulation model of the structure under the condition of the bridge by using the finite element software MIDAS/Civil. According to the construction flow of the first tower and the back beam and the tower beam synchronously, the construction information is added to the software and the normal installation calculation is carried out. 2) the calculation results of the construction of the structure using the first tower and the rear beam and the tower beam synchronously are compared. This paper analyzes the influence of the tower and beam synchronous construction method on the main components of the structure from two aspects: the construction stage and the operation stage, and then combines the advantages and disadvantages of the two construction methods. The feasibility of tower beam synchronous construction method is discussed. 3) in studying the influence of tower beam synchronous construction method on the structure, because the cable force plays a key role in the structure force, this part is divided into a chapter. In this part, the construction cable force with the design of the bridge cable force as the target is determined by the formal loading method, and the initial tensioning force of the cable-stayed element with the construction cable force as the target is determined by the formal installation iteration method, and then the influence of the tower beam synchronous construction method on the cable force is analyzed. The control results of cable force construction based on tower beam synchronous construction method are analyzed, and the practical application effect of tower beam synchronization method is verified.
【學(xué)位授予單位】:武漢理工大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:U448.27
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 段波,曾德榮,盧江;關(guān)于斜拉橋索力測定的分析[J];重慶交通學(xué)院學(xué)報(bào);2005年04期
2 徐強(qiáng);楊威;蔣敏杰;;綏芬河斜拉橋塔梁同步施工控制技術(shù)的研究[J];城市道橋與防洪;2007年11期
3 魏建東,劉山洪;基于拉索靜態(tài)線形的索力測定[J];工程力學(xué);2003年03期
4 許建得;李欽;霍永生;;惠州合生大橋塔梁同步施工監(jiān)控技術(shù)[J];廣東土木與建筑;2010年04期
5 孫全勝;孫永存;;斜拉橋塔梁同步施工與控制技術(shù)的研究[J];公路;2007年04期
6 張擁軍;蔣衛(wèi)東;;超寬斜拉橋塔梁同步施工方案與控制技術(shù)[J];公路交通科技(應(yīng)用技術(shù)版);2009年05期
7 胡躍;陳勇;;貴溪大橋獨(dú)斜塔無背索斜拉橋塔梁同步施工技術(shù)[J];城市道橋與防洪;2012年09期
8 黃僑,吳紅林,李志波;確定斜拉橋施工索力的正裝計(jì)算法[J];哈爾濱工業(yè)大學(xué)學(xué)報(bào);2004年12期
9 侯俊明,彭曉彬,葉方才;斜拉索索力的溫度敏感性[J];長安大學(xué)學(xué)報(bào)(自然科學(xué)版);2002年04期
10 熊邵輝;卓靜;;斜拉橋塔梁同步施工可行性研究與施工控制[J];公路與汽運(yùn);2010年01期
本文編號:2139392
本文鏈接:http://sikaile.net/kejilunwen/jiaotonggongchenglunwen/2139392.html