CFG樁在公路軟弱地基處理中的應(yīng)用研究
本文選題:CFG樁 + 軟弱地基; 參考:《河北工業(yè)大學(xué)》2014年碩士論文
【摘要】:隨著我國(guó)經(jīng)濟(jì)的不斷發(fā)展,公路建設(shè)面臨的地質(zhì)環(huán)境開始變得日益復(fù)雜,我國(guó)幅員遼闊,從西部的黃土高原到東部沿海的沖積平原,甚至大西北的沙漠盆地,軟弱地基都有存在,特別是在東部沿海經(jīng)濟(jì)規(guī)模的擴(kuò)大,在基建方面的投入不斷增加的背景下,如何在軟弱地基上建設(shè)公路成為近年來(lái)公路行業(yè)面對(duì)的常見(jiàn)問(wèn)題,過(guò)量的沉降和不同結(jié)構(gòu)間的沉降失穩(wěn)是軟弱地基上公路建設(shè)面對(duì)的主要問(wèn)題。從房建行業(yè)引入的CFG樁法可以較好的處理這些問(wèn)題,通過(guò)長(zhǎng)時(shí)間的實(shí)踐和理論研究,可以發(fā)現(xiàn)CFG樁對(duì)于流沙區(qū)和淤泥質(zhì)區(qū)的軟弱地基的固定加固效果非常明顯,通過(guò)使用CFG樁對(duì)軟弱地基的加固,,使得軟弱地基的回彈模量達(dá)到基本的路用效果,保證了軟弱地基地區(qū)的沉降小于路用標(biāo)準(zhǔn)的要求。本文基于此應(yīng)用背景,分析了軟弱地基上使用CFG樁的理論計(jì)算原理,CFG樁上褥墊層的設(shè)置原理和操作方法,CFG樁的設(shè)計(jì)方法,CFG樁施工工藝和質(zhì)量控制,最后結(jié)合邢衡高速的施工實(shí)例,將靜載實(shí)驗(yàn)的結(jié)果與理論計(jì)算進(jìn)行了分析比對(duì),對(duì)兩者的準(zhǔn)確性進(jìn)行了修正比較。
[Abstract]:With the development of our country's economy, the geological environment of highway construction is becoming more and more complicated. Our country has a vast territory, from the loess plateau in the west to the alluvial plain in the east coast, and even the desert basin in the northwest of China. Weak foundation exists, especially in the east coast economic scale expansion, the investment in the infrastructure is increasing, how to build the highway on the soft foundation has become a common problem in the highway industry in recent years. Excessive settlement and unstable settlement between different structures are the main problems of highway construction on weak foundation. The CFG pile method introduced from the housing construction industry can deal with these problems well. Through a long time of practice and theoretical research, it can be found that CFG pile is very effective in fixing and strengthening the soft foundation in the quicksand area and silt area. By using CFG pile to reinforce the soft foundation, the elastic modulus of the soft foundation reaches the basic road effect, and the settlement in the soft foundation area is less than the requirement of the road standard. Based on this application background, this paper analyzes the theoretical calculation principle of CFG pile on soft foundation and the setting principle and operation method of cushion layer on CFG pile. The design method of CFG pile is discussed in this paper, and the construction technology and quality control of CFG pile are discussed. Finally, combining with the example of Xingheng high speed construction, the results of the static load experiment are analyzed and compared with the theoretical calculation, and the accuracy of the two experiments is revised and compared.
【學(xué)位授予單位】:河北工業(yè)大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:U416.1
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 鄭東明,鄧安福,呂鎮(zhèn)江;CFG樁復(fù)合地墓褥墊層效用的有限元分析[J];地下空間;1999年02期
2 王大通,袁立民,石海;CFG樁樁身材料強(qiáng)度試驗(yàn)研究[J];地質(zhì)災(zāi)害與環(huán)境保護(hù);1998年01期
3 潘紀(jì)順,劉志偉,姬計(jì)法,呂芝全,李天成,劉峽;CFG樁復(fù)合地基承載性狀的試驗(yàn)研究[J];地質(zhì)與勘探;2001年04期
4 范云,汪英珍;CFG復(fù)合地基樁材特性的試驗(yàn)分析[J];地質(zhì)與勘探;2002年04期
5 陳環(huán);;真空預(yù)壓法機(jī)理研究十年[J];港口工程;1991年04期
6 于志強(qiáng);加密塑料排水板真空聯(lián)合堆載預(yù)壓法在天津港南疆港區(qū)的應(yīng)用[J];港口工程;1996年02期
7 陳昌仁;侯新宇;郭洪濤;;CFG樁復(fù)合地基承載力經(jīng)驗(yàn)公式的修正及應(yīng)用[J];河海大學(xué)學(xué)報(bào)(自然科學(xué)版);2006年03期
8 張小平,俞仲泉;用Mindlin解推求復(fù)合地基中附加應(yīng)力的計(jì)算公式[J];河海大學(xué)學(xué)報(bào)(自然科學(xué)版);1999年02期
9 張東剛;CFG樁復(fù)合地基變形計(jì)算分析[J];建筑科學(xué);1993年04期
10 吉同元;鄒允祥;劉松玉;;軟土地基CFG樁施工對(duì)樁周土擾動(dòng)影響研究[J];路基工程;2006年04期
本文編號(hào):2023468
本文鏈接:http://sikaile.net/kejilunwen/jiaotonggongchenglunwen/2023468.html