天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當前位置:主頁 > 科技論文 > 交通工程論文 >

淺埋隧道施工中管線滲漏水對地層變形和破壞的影響

發(fā)布時間:2018-04-26 10:01

  本文選題:管線滲漏 + 淺埋隧道; 參考:《北京交通大學(xué)》2014年碩士論文


【摘要】:摘要:近年來城市淺埋隧道施工中管線滲漏水誘發(fā)的地面塌陷事故頻繁出現(xiàn),針對這一現(xiàn)狀,本文采用室內(nèi)模型試驗、顆粒離散元(PFC2D)數(shù)值模擬和理論分析相結(jié)合的研究方法,基于常見城市地區(qū)的軟弱圍巖,對淺埋隧道施工中管線滲漏水對地層變形和破壞的影響進行了系統(tǒng)研究,取得的主要研究成果如下: (1)無管線滲漏時,隧道開挖之前,地層處于穩(wěn)定狀態(tài),開挖以后,隧道上覆地層逐漸坍塌至地表;有管線滲漏時,隧道開挖之前,管線滲漏水的存在導(dǎo)致地表出現(xiàn)明顯沉降,開挖以后,滲漏水弱化了地層成拱效應(yīng),隧道上覆地層不但發(fā)生了整體坍塌破壞,且破壞范圍較無管線滲漏時要大。 (2)管線滲漏情況下,隨著滲漏水范圍的增大,隧道開挖前由滲漏水引起的地表沉降增大,隧道開挖后地層失穩(wěn)破壞范圍和破壞速率增大,因此滲漏水的增多加劇了開挖面上覆地層變形,加速了地層坍塌破壞。 (3)管線位置的偏移導(dǎo)致管線滲漏水范圍向同一側(cè)偏移,隧道開挖前滲漏水引起的地表沉降范圍及開挖后地層塌方破壞范圍也隨之向同一側(cè)偏移;管線位置的下移使得管線距隧道拱頂?shù)木嚯x減小,滲漏水范圍減小,上覆地層變形減弱,最終地層失穩(wěn)破壞范圍減小。 (4)隨著管線內(nèi)水壓力的增大,管線滲漏水范圍及隧道開挖前由滲漏水引起的地表沉降隨之增大,隧道開挖后開挖面上覆土層變形及最終地層失穩(wěn)破壞范圍也相應(yīng)的增大。
[Abstract]:Abstract: in recent years, ground collapse accidents induced by pipeline leakage occurred frequently in urban shallow tunnel construction. In view of this situation, this paper adopts the method of combining numerical simulation and theoretical analysis of indoor model test, particle discrete element PFC2D). Based on the soft surrounding rock in common urban areas, the influence of pipeline leakage on formation deformation and damage in shallow tunnel construction is studied systematically. The main research results are as follows: 1) when there is no pipeline leakage, the stratum is in a stable state before the tunnel is excavated. After excavation, the overlying stratum of the tunnel gradually collapses to the surface. When there is a pipeline leakage, the existence of the pipeline leakage water before the tunnel excavation results in the obvious settlement of the surface. After excavation, leakage water weakens the formation arch effect, and the overlying strata of the tunnel not only collapse and destroy, but also the damage range is larger than that without pipeline leakage. (2) in the case of pipeline leakage, with the increase of leakage range, the ground subsidence caused by leakage water increases before tunnel excavation, and the failure range and failure rate of stratum instability increase after tunnel excavation. Therefore, the increase of water leakage intensifies the deformation of the overlying stratum on the excavating surface and accelerates the collapse and destruction of the stratum. (3) the migration of pipeline position causes the leakage range of pipeline to the same side, and the ground subsidence range caused by leakage water before tunnel excavation and the damage range of stratum collapse after excavation are also shifted to the same side. The downward shift of the pipeline position reduces the distance between the pipeline and the vault of the tunnel, decreases the scope of leakage, weakens the deformation of the overlying strata, and reduces the ultimate range of instability and failure of the formation. 4) with the increase of the water pressure in the pipeline, the leakage range of the pipeline and the surface settlement caused by the leakage water before the tunnel excavation will increase, and the deformation of the overlying soil layer on the excavated surface of the tunnel and the failure range of the ultimate formation instability will also increase correspondingly after the excavation of the tunnel.
【學(xué)位授予單位】:北京交通大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:U455.49

【參考文獻】

相關(guān)期刊論文 前10條

1 范德偉;宋曉光;;盾構(gòu)開挖對地下管線影響的數(shù)值模擬分析[J];燕山大學(xué)學(xué)報;2009年03期

2 陳玲俐,李杰;供水管網(wǎng)滲漏分析研究[J];地震工程與工程振動;2003年01期

3 李冬成;;巖土模型試驗相似設(shè)計[J];湖南交通科技;2011年02期

4 彭海明,彭振斌,韓金田,安偉剛,劉鐵雄;巖性相似材料研究[J];廣東土木與建筑;2002年12期

5 馬長波;;基于隨機有限元的高地應(yīng)力區(qū)隧道圍巖穩(wěn)定性分析[J];公路;2010年07期

6 陳力華;張蕾;;有限元極限分析法的進展及在隧道工程中的應(yīng)用探討[J];公路交通技術(shù);2010年05期

7 李瑞林;周國慶;陳國舟;石高鵬;李軍;;巖土工程磁力模型實驗土體相似材料的研制[J];功能材料;2012年19期

8 方詩圣,胡成,吳文清,鄭曉燕;微混凝土模型材料基本性能試驗研究[J];合肥工業(yè)大學(xué)學(xué)報(自然科學(xué)版);1999年05期

9 孫光永;伍耀忠;;滲流對巖體強度影響的機理研究[J];山西建筑;2007年28期

10 廖巍,徐海清,劉貴應(yīng);巖體結(jié)構(gòu)面組合對巷道圍巖穩(wěn)定性的影響[J];安全與環(huán)境工程;2004年02期

相關(guān)博士學(xué)位論文 前4條

1 李建光;巖土類材料的損傷本構(gòu)模型及其在沖擊動力學(xué)問題中的應(yīng)用[D];中國科學(xué)技術(shù)大學(xué);2007年

2 王霆;地鐵淺埋暗挖法施工對鄰近管線的影響與控制[D];北京交通大學(xué);2009年

3 房倩;高速鐵路隧道支護與圍巖作用關(guān)系研究[D];北京交通大學(xué);2010年

4 甄文戰(zhàn);巖土材料變形局部化問題理論及數(shù)值分析研究[D];上海大學(xué);2010年

,

本文編號:1805546

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/jiaotonggongchenglunwen/1805546.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶a3002***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com