【摘要】:鋼桁梁斜拉橋獨有的桁架結(jié)構(gòu)形式,使其具有承載能力強、整體剛度大、跨徑大等特點,隨著我國高速鐵路建筑的快速發(fā)展,,鋼桁梁斜拉橋越來越成為未來橋梁的發(fā)展方向。本文以貴廣鐵路思賢窖特大鋼桁梁斜拉橋為工程背景,就其施工控制中幾個關鍵性因素進行了分析: (1)鋼桁梁斜拉橋施工過程中線形走向直接關系到鋼桁梁的合攏和最終設計成橋狀態(tài)的形成,本文研究了鋼桁梁斜拉橋制造線形和安裝線形的分析計算,并研究了它們的內(nèi)在聯(lián)系。鋼桁梁斜拉橋一般通過改變弦桿長度來實現(xiàn)預拱度,本文研究了弦桿長度改變量的幾種計算方法; (2)鋼桁梁斜拉橋合攏具有合攏點多、合攏精度要求高、調(diào)整難道大等特點,因而對其合攏狀態(tài)的分析尤為重要,本文分析了鋼桁梁斜拉橋合攏所需的唯一的合攏狀態(tài),并介紹了它的計算; (3)非垂直的斜拉索在自重作用下會產(chǎn)生垂度效應,使得斜拉索計算索力和實際索力存在偏差,本文研究了修正這種偏差的方法,鋼桁梁斜拉橋施工過程中為獲取特定的安裝線形需要對斜拉索索力進行臨時調(diào)整,待全橋合攏后恢復,且施工方法的不同也會引起斜拉索索力的改變,本文均有研究。
[Abstract]:The unique truss structure form of steel truss girder cable-stayed bridge makes it have the characteristics of strong bearing capacity, large overall stiffness and long span. With the rapid development of high-speed railway construction in China, Steel truss girder cable-stayed bridge is becoming the development direction of future bridge more and more. This paper takes Sixian Jiao extraordinarily large steel truss girder cable-stayed bridge in Gui-Guangzhou Railway as the engineering background, and analyzes several key factors in its construction control. 1) the alignment of steel truss cable-stayed bridges is directly related to the closure of the steel truss and the formation of the final design of the bridge. This paper studies the analysis and calculation of the manufacture and installation of the steel truss cable-stayed bridges. Steel truss girder cable-stayed bridge is usually used to change the chord length to achieve pre-arched degree. In this paper, several calculation methods of chord length change are studied. 2) the closure of steel truss cable-stayed bridge is characterized by many closing points, high precision and large adjustment, so it is very important to analyze the closure state of steel truss cable-stayed bridge. In this paper, the unique closure state of steel truss cable-stayed bridge is analyzed. Its calculation is also introduced. 3) the non-vertical cable will have sag effect under the action of deadweight, which makes the calculation of cable force deviate from the actual cable force. This paper studies the method of correcting this deviation. In order to obtain the special installation line of steel truss girder cable-stayed bridge, it is necessary to adjust the cable force temporarily, to be restored after the whole bridge is closed, and the different construction methods will also cause the change of cable force.
【學位授予單位】:華南理工大學
【學位級別】:碩士
【學位授予年份】:2014
【分類號】:U448.27

【參考文獻】

相關期刊論文 前7條

1 馮海舟;熊健民;;大跨度鋼桁梁斜拉橋預拱度分析[J];北方交通;2013年03期

2 高宗余;;武漢天興洲公鐵兩用長江大橋總體設計[J];橋梁建設;2007年01期

3 肖海珠;徐偉;高宗余;;安慶鐵路長江大橋設計[J];橋梁建設;2009年05期

4 楊新寶,曹雪琴;大跨度鐵路斜拉橋豎向剛度的研究[J];上海鐵道學院學報;1995年02期

5 曾永平;陳天地;袁明;戴勝勇;;大跨度鐵路鋼桁梁斜拉橋預拱度設置[J];鐵道工程學報;2010年10期

6 陳進昌;在高速鐵路上采用大跨度鋼斜拉橋的設計研究[J];橋梁建設;1998年03期

7 段雪煒,鄔恒銀;蕪湖長江大橋吊索塔架的設計與施工[J];中國鐵道科學;2003年03期



本文編號:1584242

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/jiaotonggongchenglunwen/1584242.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權申明:資料由用戶f4583***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com