盾構過站始發(fā)掘進與車站平行施工技術

發(fā)布時間:2018-01-08 08:28

  本文關鍵詞:盾構過站始發(fā)掘進與車站平行施工技術 出處:《鐵道標準設計》2014年09期  論文類型:期刊論文


  更多相關文章: 地鐵 盾構過站 二次始發(fā) 車站 平行作業(yè) 施工


【摘要】:長沙地鐵芙蓉廣場站受前期拆除立交橋引橋影響,導致主體施工進度滯后,嚴重影響盾構過站始發(fā)掘進,即使采用站外過站分體始發(fā)也要使盾構停機等待7個月,無法滿足業(yè)主要求盾構在五一廣場站吊出轉場后當年還建立交橋要求,工期矛盾突出。采用先施工站臺層方案,運用側墻和中板一次澆筑工藝和早強混凝土及時為盾構提供接收條件。研發(fā)出曲線導軌滾輪整機過站實現了盾構過站與站臺層平行施工。通過站臺層中板配筋加強解決了盾構過站始發(fā)后再施工車站剩余主體難題。首次實現盾構始發(fā)掘進與車站主體工程平行施工,大大縮短建設工期。
[Abstract]:The subway station Changsha Furong square by the early removal of overpass bridge approach, leading to the main construction progress lag, seriously affected the originating station tunneling shield, even with the station outside the station separate launching will make the shield down to wait for 7 months, can not meet the requirements of shield hanging out transitions in 51 square station was built for interchange bridge, duration of contradiction. The construction of the platform layer scheme, side wall plate and the use of a casting process and early strength concrete to provide timely shield reception conditions. The development of curve rail roller machine had realized the station subway station and the platform layer. Through the parallel construction platform layer plate reinforcement strengthening solution station after the construction of the shield originating station for the first time. The main problem of the remaining shield original heading parallel with the main station construction project, greatly shorten the construction period.

【作者單位】: 中鐵十二局集團有限公司;
【分類號】:U231.4;U455.43
【正文快照】: 1工程概況長沙地鐵2號線7標為2個盾構區(qū)間,迎賓路站—芙蓉廣場站區(qū)間長550 m,芙蓉廣場站—五一廣場站區(qū)間長720 m,根據總體部署,左線盾構于2011年2月中旬從賓路站始發(fā),經芙蓉廣場站接收后站內過站,然后二次始發(fā)掘進到五一廣場站接收轉場。業(yè)主要求2011年底完成立交橋還建。芙

【相似文獻】

相關期刊論文 前2條

1 聶R芻,

本文編號:1396369


資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/jiaotonggongchenglunwen/1396369.html


Copyright(c)文論論文網All Rights Reserved | 網站地圖 |

版權申明:資料由用戶e4b1e***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com