英國亨伯橋更換支座
發(fā)布時間:2018-01-07 10:42
本文關(guān)鍵詞:英國亨伯橋更換支座 出處:《世界橋梁》2014年06期 論文類型:期刊論文
更多相關(guān)文章: 搖軸支座 亨伯 下橫梁 主跨 活載作用 座體 銷軸 豎向位移 常規(guī)檢查 縱向移動
【摘要】:正英國亨伯橋(Humber Bridge)是一座主跨1 410m的懸索橋,位于亨伯河河口處,是A15公路的一部分,布置雙向4車道。該橋原來在兩邊跨端部和橋塔處均安裝有A形架搖軸支座,連接鋼箱梁與高8m的橋塔下橫梁。常規(guī)檢查發(fā)現(xiàn),北橋塔處搖軸支座產(chǎn)生了由支座銷軸或支座座體磨損而引起的豎向位移?紤]到在活載作用下A形架的搖動可能
[Abstract]:Humber Bridge is a suspension bridge with a main span of 1,410m. It is located at the mouth of the Humber River and is part of Highway A15. The bridge was originally installed on both sides of the cross-end and the bridge tower with a shaft-bearing A-frame, connecting the steel box girder to the 8m high bridge tower under the crossbeam. Routine inspection found. The shake-bearing at the tower of the north bridge produces the vertical displacement caused by the wear of the bearing pin shaft or the bearing body. Considering the possible shaking of the A-shaped frame under the action of live load
【分類號】:U448.25;U443.36
【正文快照】: 英國亨伯橋(Humber Bridge)是一座主跨1 410m的懸索橋,位于亨伯河河口處,是A15公路的一部分,布置雙向4車道。該橋原來在兩邊跨端部和橋塔處均安裝有A形架搖軸支座,連接鋼箱梁與高8m的橋塔下橫梁。常規(guī)檢查發(fā)現(xiàn),北橋塔處搖軸支座產(chǎn)生了由支座銷軸或支座座體磨損而引起的豎向位
【相似文獻(xiàn)】
相關(guān)期刊論文 前5條
1 李根成;非同心圓搖軸支座縱向摩阻力的測試與分析[J];鐵道建筑;1994年02期
2 王奉雪;陳慶波;;長東黃河二橋搖軸支座縱向位移病害整治[J];鐵道標(biāo)準(zhǔn)設(shè)計;2008年11期
3 劉智敏;高日;張敬學(xué);羅振;張強;;鐵路橋梁搖軸支座鉸軸竄出病害機理[J];北京交通大學(xué)學(xué)報;2013年06期
4 毛俊杰;;民主德國改建鐵路橋梁的新方法[J];鐵道科技動態(tài);1988年11期
5 王玲;搖軸支座牙板裂紋病害的整治[J];鐵道建筑;1989年02期
,本文編號:1392235
本文鏈接:http://sikaile.net/kejilunwen/jiaotonggongchenglunwen/1392235.html
最近更新
教材專著