風(fēng)力機塔筒門洞焊縫多軸疲勞壽命預(yù)測
[Abstract]:A critical plane method based on critical plane method is proposed to predict the multiaxial fatigue life of the welding seam of the portal tunnel of the tower tube. On the premise of satisfying the ultimate strength, the method combines the multiaxial counting method and the Miner linear cumulative damage theory, based on the maximum principal stress at the critical interface. FESAFE multiaxial fatigue algorithm is used to analyze the fatigue life of portal weld. The results show that the tower tube structure meets the design requirements, and the most dangerous position of the tower tube portal is located at the weld toe of the inner wall of the portal hole, which is in accordance with the actual situation, and the feasibility and effectiveness of the method are verified.
【作者單位】: 內(nèi)蒙古工業(yè)大學(xué)機械學(xué)院;
【基金】:內(nèi)蒙古自然科學(xué)基金(2014MS0514) 內(nèi)蒙古“草原英才”工程
【分類號】:TG405;TK83
【相似文獻】
相關(guān)期刊論文 前9條
1 蘭鵬光;張貴文;張志偉;;風(fēng)力發(fā)電塔筒法蘭生產(chǎn)工藝研究[J];鍛壓裝備與制造技術(shù);2007年06期
2 李毓文;;焊接風(fēng)電塔筒工藝技術(shù)的改進措施[J];中國建筑金屬結(jié)構(gòu);2013年22期
3 張永軍;;風(fēng)電塔筒法蘭外翻變形的控制工藝[J];中國制造業(yè)信息化;2010年17期
4 陳曉周;賈盛凱;陳格兵;;新型風(fēng)電塔筒鱷式組對焊接工藝裝備[J];焊接技術(shù);2011年01期
5 王霞;;淺析風(fēng)電塔筒防腐工裝的應(yīng)用措施[J];中國新技術(shù)新產(chǎn)品;2012年08期
6 林艷春;;熱處理在塔筒制造中的應(yīng)用[J];科技與企業(yè);2012年11期
7 鄭艷梅;;風(fēng)電塔筒法蘭焊接方法研究[J];科技創(chuàng)業(yè)家;2014年05期
8 高填;祁文軍;孫文磊;;數(shù)值模擬技術(shù)在風(fēng)力機法蘭塔筒焊接中的應(yīng)用[J];熱加工工藝;2012年07期
9 于太安;武志勤;耿俊峰;;風(fēng)電塔筒法蘭焊接方法研究[J];河北建筑工程學(xué)院學(xué)報;2008年01期
相關(guān)會議論文 前2條
1 王海龍;李英昌;;風(fēng)電塔筒焊縫分析[A];中國農(nóng)業(yè)機械工業(yè)協(xié)會風(fēng)能設(shè)備分會2011年度論文集(下)[C];2011年
2 張建峰;姜峰;賈洪仁;;風(fēng)電塔筒升降機傳動部分圓弧齒條的工藝設(shè)計與性能仿真[A];全國先進制造技術(shù)高層論壇暨第九屆制造業(yè)自動化與信息化技術(shù)研討會論文集[C];2010年
相關(guān)碩士學(xué)位論文 前1條
1 桑遠;基于聲發(fā)射技術(shù)的風(fēng)電塔筒動態(tài)監(jiān)測技術(shù)研究[D];蘭州理工大學(xué);2014年
,本文編號:2411535
本文鏈接:http://sikaile.net/kejilunwen/jiagonggongyi/2411535.html