裝配式鋼筋混凝土廢水池設(shè)計(jì)與施工工藝研究
發(fā)布時(shí)間:2018-11-21 15:11
【摘要】:隨著工業(yè)化產(chǎn)業(yè)的發(fā)展,不可再生資源石油的需求量也在不斷提升。鉆前工程中的廢水池的施工質(zhì)量的優(yōu)劣和施工速度的快慢直接影響整個(gè)油氣的鉆探、開發(fā)過程。在現(xiàn)場(chǎng)施工工藝中,廢水池的修建大多采用現(xiàn)澆整體式的形式,針對(duì)石油鉆探工程的特殊項(xiàng)目,現(xiàn)澆式的水池養(yǎng)護(hù)時(shí)間將造成施工的空窗期,同時(shí),使用完成后的混凝土水池將成為永久性的污染物。本文以“鉆前工程廢水池拼裝技術(shù)應(yīng)用研究”項(xiàng)目為依托,以《給水排水工程鋼筋混凝土水池結(jié)構(gòu)設(shè)計(jì)規(guī)范》為研究依據(jù),對(duì)裝配式鋼筋混凝土廢水池進(jìn)行標(biāo)準(zhǔn)模塊設(shè)計(jì)、拼裝連接的構(gòu)造部署、縮尺模型試驗(yàn)的整體性檢驗(yàn)、拼裝施工技術(shù)研究,達(dá)到提高鋼筋混凝土廢水池標(biāo)準(zhǔn)模塊的預(yù)制生產(chǎn)質(zhì)量、現(xiàn)場(chǎng)施工效率的目的。石油鉆前裝配式鋼筋混凝土廢水池采用裝配式代替現(xiàn)澆式的施工工藝方式,具有工期顯著縮短、安裝拆卸方便、能多次周轉(zhuǎn)使用、環(huán)境效益好等多方優(yōu)點(diǎn)。通過本文的模塊設(shè)計(jì)、拼裝連接等關(guān)鍵技術(shù)研究,對(duì)裝配式鋼筋混凝土廢水池的推行有一定的參考價(jià)值。
[Abstract]:With the development of industrial industry, the demand for non-renewable resources oil is also increasing. The quality of waste water pool and the speed of construction directly affect the whole process of oil and gas drilling and development. In the field construction process, the construction of waste water pool is mostly in the form of cast-in-place integral type. For the special project of oil drilling project, the maintenance time of cast-in-place pool will cause the empty window period of construction, at the same time, The finished use of the concrete pool will become a permanent pollutant. In this paper, based on the project of "Application Research on assembling Technology of waste Water Pool of Pre-drilling Engineering" and the structural Design Code of reinforced concrete Pool in Water supply and drainage Project, the standard module design of fabricated reinforced concrete wastewater pool is carried out. In order to improve the precast production quality and site construction efficiency of the standard modules of reinforced concrete wastewater ponds, the structural deployment of assembly connection, the integrity test of scale model test and the study of assembly construction technology are achieved. The prefabricated reinforced concrete wastewater ponds with oil drilling adopt assembly instead of cast-in-place construction technology, which has many advantages, such as shortened construction period, convenient installation and disassembly, many times turnover, good environmental benefit, and so on. Through the research of module design, assembly and connection and other key technologies, it has a certain reference value for the implementation of the assembly reinforced concrete wastewater pool.
【學(xué)位授予單位】:西南科技大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:X741;TU755
本文編號(hào):2347341
[Abstract]:With the development of industrial industry, the demand for non-renewable resources oil is also increasing. The quality of waste water pool and the speed of construction directly affect the whole process of oil and gas drilling and development. In the field construction process, the construction of waste water pool is mostly in the form of cast-in-place integral type. For the special project of oil drilling project, the maintenance time of cast-in-place pool will cause the empty window period of construction, at the same time, The finished use of the concrete pool will become a permanent pollutant. In this paper, based on the project of "Application Research on assembling Technology of waste Water Pool of Pre-drilling Engineering" and the structural Design Code of reinforced concrete Pool in Water supply and drainage Project, the standard module design of fabricated reinforced concrete wastewater pool is carried out. In order to improve the precast production quality and site construction efficiency of the standard modules of reinforced concrete wastewater ponds, the structural deployment of assembly connection, the integrity test of scale model test and the study of assembly construction technology are achieved. The prefabricated reinforced concrete wastewater ponds with oil drilling adopt assembly instead of cast-in-place construction technology, which has many advantages, such as shortened construction period, convenient installation and disassembly, many times turnover, good environmental benefit, and so on. Through the research of module design, assembly and connection and other key technologies, it has a certain reference value for the implementation of the assembly reinforced concrete wastewater pool.
【學(xué)位授予單位】:西南科技大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:X741;TU755
【參考文獻(xiàn)】
相關(guān)期刊論文 前6條
1 薛偉辰;預(yù)制混凝土框架結(jié)構(gòu)體系研究與應(yīng)用進(jìn)展[J];工業(yè)建筑;2002年11期
2 曾江;郭曉品;白志強(qiáng);沈紅玲;;淺談矩形水池底板計(jì)算方法[J];玻璃;2014年06期
3 姜洪斌;張海順;劉文清;閻紅纓;;預(yù)制混凝土結(jié)構(gòu)插入式預(yù)留孔灌漿鋼筋錨固性能[J];哈爾濱工業(yè)大學(xué)學(xué)報(bào);2011年04期
4 張榮彪;王慧春;王春光;;拼裝式水窖在飲水解困工程中的應(yīng)用[J];水利科技與經(jīng)濟(jì);2008年01期
5 ;混凝土砌塊配筋砌體L型擋土墻[J];建筑砌塊與砌塊建筑;2013年03期
6 師發(fā)林;曹國(guó)強(qiáng);董從貴;羅傳留;;低配筋混凝土預(yù)制裝配式沼氣池的設(shè)計(jì)與施工[J];中國(guó)沼氣;1992年03期
,本文編號(hào):2347341
本文鏈接:http://sikaile.net/kejilunwen/huanjinggongchenglunwen/2347341.html
最近更新
教材專著