DL污水處理總承包項目進度管理案例研究
[Abstract]:EPC project contracting mode is a more and more recognized project contracting mode, through a single unit to undertake the design, procurement, construction, commissioning and other all the work. So that the control of project investment, speed up the project progress, improve coordination capabilities and other aspects reflect a greater advantage. But at the same time because of the increase of the scope of work involved in the general contract management and the increase of risks, the project management and coordination work is very difficult for the general contracting unit. How to speed up the progress of the project under the premise of ensuring the quality of the project, and to complete the target of the contract on schedule in the atmosphere of controlling the investment, is the key point of the management and control of the progress of the general contract. This paper takes DL sewage treatment EPC general contract project as a case, through the actual problems and phenomena in the running process of the project, combined with the project management knowledge, studied and analyzed the reason of the progress problem. First of all, from the design, procurement, construction to identify three aspects of the typical problems described, and then combined with the project management theory of contract management, information management, communication management, The planning and control aspects of risk management and schedule management theory are analyzed in depth. Find out where the problem lies, that is, the deviation of the time estimate under the required resources and matching resources when the progress plan is drawn up; the information management and communication management is not in place in the process of plan monitoring; the manpower of the organization is insufficient in the field construction management. The contract execution ability is insufficient, the risk estimate is insufficient and so on. In view of the above problems, this paper puts forward my suggestions from the following aspects: making the progress plan scientifically, improving the mechanism and method of progress monitoring and management, improving the construction management measures, and so on. This case study systematically combs and analyzes the problems existing in the progress of DL sewage treatment general contracting project, and puts forward suggestions and measures for improvement according to project management theory and schedule management theory. The ideas and methods of putting forward, analyzing and solving the problems described in this paper not only provide references for the management of DL sewage projects, but also are worthy of reference for all general contracting projects.
【學位授予單位】:大連理工大學
【學位級別】:碩士
【學位授予年份】:2015
【分類號】:X703
【相似文獻】
相關期刊論文 前10條
1 陳進;;淺談總承包項目風險識別及防范措施[J];天然氣與石油;2009年02期
2 ;2009年成都院29個設計或總承包項目建成投產(chǎn)[J];新世紀水泥導報;2010年02期
3 祁俊堯;;海外總承包項目管理的體會[J];水泥工程;2013年04期
4 陳伯華,張秀東;淺談以設計為主體石油化工總承包項目的費用控制[J];化工設計;2000年06期
5 馬小紅;;對總承包項目現(xiàn)場費用控制的認識[J];化學工業(yè);2007年Z1期
6 管培芳;;淺談總承包項目的調(diào)試服務[J];中國水泥;2009年02期
7 梁泳;;三江化工總承包項目的管理與實踐[J];中國洗滌用品工業(yè);2009年04期
8 玉建寧;;如何做好總承包項目檔案管理工作[J];中國金屬通報;2009年34期
9 薛翠萍;趙淵;;總承包項目工程變更的控制與管理[J];包鋼科技;2009年06期
10 李偉;;總承包項目管理體會[J];中國石油和化工標準與質(zhì)量;2011年06期
相關會議論文 前7條
1 吳興飛;季益祥;;國外總承包項目中設計工作內(nèi)容及要點[A];建材建設工程優(yōu)秀論文集[C];2011年
2 徐建榮;;執(zhí)行國外總承包項目需關注的幾個重點和要點[A];建材建設工程優(yōu)秀論文集[C];2011年
3 單承家;;業(yè)主在總承包項目中的管理工作[A];2010年石油石化行業(yè)建設工程總承包與項目管理論壇文集[C];2010年
4 朱永明;;P6在總承包項目管理的應用創(chuàng)新[A];2010年石油石化行業(yè)建設工程總承包與項目管理論壇文集[C];2010年
5 魏東;;淺談總承包項目施工管理——總承包方對分承包方的管理[A];建材建設工程優(yōu)秀論文集[C];2011年
6 李文;楊愛平;;淺談以設計為龍頭的EPC總承包項目管理[A];貴州工程項目管理論文集(2010)[C];2010年
7 萬勇;;承接國外工程EPC總承包項目如何規(guī)避風險[A];建材建設工程優(yōu)秀論文集[C];2011年
相關重要報紙文章 前10條
1 沈衛(wèi)星;論總承包項目的風險管理[N];中國建設報;2004年
2 張見明;中標惠州大煉油常減壓總承包項目[N];中國石化報;2006年
3 王士剛;總承包項目管理模式的探索[N];中國建設報;2013年
4 本報記者 董欣;昂起設計龍頭 夯實安全基礎[N];中國能源報;2014年
5 陳海明邋徐文哲;浙送獨立中標國際總承包項目[N];中國電力報;2007年
6 記者 祝福;包鋼設計研究總院到國際市場總承包項目獲效益[N];內(nèi)蒙古日報(漢);2008年
7 李明;中一重簽首個出口成套產(chǎn)品總承包項目合同[N];中國企業(yè)報;2009年
8 蘇廣宇 記者 賈永杰;一重簽訂首個成套產(chǎn)品總承包項目合同[N];齊齊哈爾日報;2009年
9 駐安徽記者查健;合肥院海外總承包項目管理水平不斷提升[N];中國建材報;2011年
10 孫爽;市場呼喚園林總承包[N];中國花卉報;2004年
相關碩士學位論文 前10條
1 宋海濱;EPC總承包項目內(nèi)知識轉(zhuǎn)移機理研究[D];北京交通大學;2016年
2 張健;基于CSFs的施工總承包項目溝通管理研究[D];東南大學;2015年
3 李志茹;S公司贊比亞EPC總承包項目貨物運輸方案設計[D];大連海事大學;2016年
4 仲俊誠;國際電力工程項目總承包的風險管理研究[D];東南大學;2015年
5 陳磊;APC鐵鳥臺設備總承包項目風險管理研究[D];北京工業(yè)大學;2016年
6 張宇;DL污水處理總承包項目進度管理案例研究[D];大連理工大學;2015年
7 祝兆輝;J公司總承包項目風險管理研究[D];大連理工大學;2015年
8 王俊河;華晨總承包項目風險管理研究[D];大連理工大學;2008年
9 賈偉;工程公司總承包項目的費用控制探析[D];西南財經(jīng)大學;2010年
10 陳鑫;A醫(yī)院總承包項目協(xié)調(diào)管理研究[D];華南理工大學;2015年
,本文編號:2192367
本文鏈接:http://sikaile.net/kejilunwen/huanjinggongchenglunwen/2192367.html