基于跑道容量的飛機(jī)推出控制研究
[Abstract]:The rapid development of civil aviation passenger and freight transportation aggravates the burden of airport limited resources and facilities, especially under bad weather conditions, due to the traffic congestion in the airport taxiway system, the operation efficiency of the scene is greatly reduced, resulting in a large area of flight delays. After the departure aircraft is introduced from the parking position, due to the problem of path distribution, it may stop waiting at the taxiway intersection for a long time, which may lead to excessive fuel consumption and increase the economic loss. In this paper, the sliding path of departure flight from stop position to runway port departure waiting queue is optimized to control the launch of aircraft. First of all, through a brief introduction to the airport operation process and aircraft ground taxiing process, the main object of this paper is introduced, and combined with the directed graph theory, the airport configuration is abstracted as a network topology composed of nodes and links. The aircraft ground taxiing model is constructed. Secondly, the airline satisfaction and taxiway load are quantified one by one, which is related to the actual start-up taxiway time of the aircraft and the number of aircraft passing and stopping waiting at the crossing point of the taxiway in each time slot. Taking the aircraft taxiing speed and the wake interval between aircraft as constraints, the objective function is defined to maximize the satisfaction of passengers and airlines, and the average taxiway load is at the same time. Thirdly, based on the idea of back pressure routing, an algorithm for optimizing the departure flight path for airport taxiway system is proposed, which allocates the optimal taxiing path to the flight and reduces the delay, and the Lianov drift is introduced to verify the performance of the algorithm. Finally, through MATLAB mathematical analysis software, the model and algorithm are simulated and verified by using the actual operation data of a large hub airport in China. The simulation results show that the algorithm proposed in this paper can effectively reduce the time of aircraft ground start-up and taxiway, improve the satisfaction of airlines and improve the load of taxiway system. At the same time, the algorithm improves the flight punctuality, greatly increases the airport traffic, and significantly improves the airport operation efficiency, which benefits the airport, airlines, passengers and other parties, for airport capacity assessment, and the subsequent addition of terminal buildings. Reconstruction and expansion of the airport, etc., to provide constructive advice.
【學(xué)位授予單位】:中國(guó)民航大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:V355
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 李楠;趙擎;徐肖豪;;基于A~*算法的機(jī)場(chǎng)滑行路徑優(yōu)化研究[J];計(jì)算機(jī)仿真;2012年07期
2 袁小珂;;基于改進(jìn)的證據(jù)理論在機(jī)場(chǎng)容量評(píng)估中的應(yīng)用[J];微電子學(xué)與計(jì)算機(jī);2012年07期
3 李捚;王春雷;;機(jī)場(chǎng)場(chǎng)面飛機(jī)滑行路徑優(yōu)化模型[J];黑龍江科技信息;2012年01期
4 董瑩;安然;;機(jī)場(chǎng)航空器地面滑行時(shí)間優(yōu)化研究[J];交通運(yùn)輸系統(tǒng)工程與信息;2011年05期
5 高國(guó)政;;基于蟻群算法的航空器地面滑行研究[J];山東交通科技;2011年01期
6 盧朝陽(yáng);趙新?tīng)N;;基于到達(dá)流特性的跑道容量分析[J];南京航空航天大學(xué)學(xué)報(bào);2011年01期
7 曹鳳云;張建偉;;機(jī)場(chǎng)調(diào)度的隊(duì)列模型及延誤研究[J];交通運(yùn)輸工程與信息學(xué)報(bào);2010年04期
8 劉光才;劉雷;;美國(guó)治理航班延誤的方法及對(duì)我國(guó)的啟示[J];中國(guó)民用航空;2010年06期
9 丁建立;李曉麗;李全福;;基于改進(jìn)蟻群協(xié)同算法的樞紐機(jī)場(chǎng)場(chǎng)面滑行道優(yōu)化調(diào)度模型[J];計(jì)算機(jī)應(yīng)用;2010年04期
10 盧朝陽(yáng);;基于T系統(tǒng)模型的跑道容量評(píng)估新方法[J];南京航空航天大學(xué)學(xué)報(bào);2010年01期
相關(guān)碩士學(xué)位論文 前9條
1 任俊生;飛機(jī)地面輪候時(shí)間預(yù)測(cè)及其算法研究[D];中國(guó)民航大學(xué);2014年
2 馮程;機(jī)場(chǎng)場(chǎng)面運(yùn)行優(yōu)化及容量評(píng)估技術(shù)研究[D];南京航空航天大學(xué);2013年
3 楊婉婉;機(jī)場(chǎng)活動(dòng)區(qū)免沖突路由計(jì)劃關(guān)鍵技術(shù)研究[D];中國(guó)民用航空飛行學(xué)院;2012年
4 楊磊;機(jī)場(chǎng)場(chǎng)面運(yùn)行優(yōu)化技術(shù)研究[D];南京航空航天大學(xué);2012年
5 王,
本文編號(hào):2477514
本文鏈接:http://sikaile.net/kejilunwen/hangkongsky/2477514.html