3d布置與9點布置對發(fā)動機聲功率測量的不確定度影響
[Abstract]:Based on the experimental study on the uncertainty of 3-day and 9-point arrangement of measurement points and the measurement of laboratory environment correction, the relationship between uncertainty of measurement point arrangement, laboratory environment correction and the uncertainty of sound power level is established, and the relationship between the uncertainty of measurement point arrangement and the uncertainty of sound power level is established. The uncertainty of sound power level measurement between 3D arrangement and 9 point arrangement is compared. The results show that the 3D layout of the prototype meets the requirements of the engineering method, and the measurement uncertainty is more than 1.5 dB when the 9-point arrangement is small, which does not meet the requirements of the engineering method. The applicable range of 3D layout environment is better than that of 9 points layout.
【作者單位】: 上汽集團商用車技術(shù)中心;上海大眾汽車有限公司;
【分類號】:TK406
【相似文獻】
相關(guān)期刊論文 前9條
1 王韶鵬;賈瑞博;;汽輪機熱力性能試驗中不確定度的研究[J];包鋼科技;2010年02期
2 宋國亮;常浩;王寶玉;趙玉柱;石永鋒;;火電廠熱力試驗不確定度的數(shù)值計算方法研究![J];熱力透平;2013年02期
3 王志國;宋永臣;劉瑜;;鍋爐反平衡熱效率測算的不確定度分析[J];節(jié)能;2006年10期
4 錢江波;嚴(yán)曉哲;韓中合;李恒凡;;微波諧振腔蒸汽濕度測量系統(tǒng)不確定度分析[J];動力工程學(xué)報;2014年09期
5 榮瑞琴;測量誤差、不確定度和數(shù)據(jù)處理的探討[J];山西電力技術(shù);1998年04期
6 卓迅佳;劉京燕;王江偉;巨林倉;;鍋爐反平衡熱效率不確定度分析及應(yīng)用[J];熱力發(fā)電;2012年02期
7 袁丁;;加熱爐反平衡熱效率的不確定度分析[J];石油工業(yè)技術(shù)監(jiān)督;2007年10期
8 張才穩(wěn);蔡攸敏;;燃?xì)廨啓C性能試驗不確定度計算與控制[J];燃?xì)廨啓C技術(shù);2008年03期
9 ;[J];;年期
相關(guān)會議論文 前1條
1 黃仕寧;;數(shù)字壓力計測量結(jié)果的不確定度分析[A];壓力計量服務(wù)和測試技術(shù)研討會論文集[C];2003年
相關(guān)碩士學(xué)位論文 前1條
1 滕曉龍;汽輪機計量檢測不確定度及計算機實現(xiàn)的研究[D];合肥工業(yè)大學(xué);2002年
,本文編號:2474457
本文鏈接:http://sikaile.net/kejilunwen/dongligc/2474457.html