西氣東輸工程20MW-2P電動(dòng)機(jī)轉(zhuǎn)子系統(tǒng)臨界轉(zhuǎn)速計(jì)算
發(fā)布時(shí)間:2018-07-10 01:48
本文選題:臨界轉(zhuǎn)速 + 西氣東輸工程; 參考:《電機(jī)與控制應(yīng)用》2014年11期
【摘要】:采用傳遞矩陣法對(duì)西氣東輸管道工程天然氣壓縮機(jī)用20 MW-2P電動(dòng)機(jī)轉(zhuǎn)子系統(tǒng)進(jìn)行了分析,詳細(xì)闡述了復(fù)雜轉(zhuǎn)子結(jié)構(gòu)的模型等效方法和數(shù)值處理過(guò)程,通過(guò)將臨界轉(zhuǎn)速計(jì)算結(jié)果與西氣東輸工程現(xiàn)用西門子電動(dòng)機(jī)的數(shù)據(jù)進(jìn)行了對(duì)比分析,驗(yàn)證了該轉(zhuǎn)子系統(tǒng)臨界轉(zhuǎn)速計(jì)算的準(zhǔn)確性,同時(shí)也表明研發(fā)的20 MW-2P電動(dòng)機(jī)轉(zhuǎn)子臨界轉(zhuǎn)速滿足西氣東輸管道工程的技術(shù)要求,為產(chǎn)品開發(fā)提供了參考。
[Abstract]:The rotor system of 20MW-2P motor used in natural gas compressor of West-to-East Gas Pipeline Project is analyzed by using transfer matrix method. The model equivalent method and numerical process of complex rotor structure are described in detail. By comparing the calculation results of critical speed with the data of Siemens motor used in West-to-East Gas Transmission Project, the accuracy of the calculation of critical speed of the rotor system is verified. At the same time, it shows that the critical speed of 20MW-2P motor rotor meets the technical requirements of West-to-East Gas Pipeline Project, which provides a reference for product development.
【作者單位】: 佳木斯電機(jī)股份有限公司北京研發(fā)中心;國(guó)家防爆電機(jī)工程技術(shù)研究中心;
【分類號(hào)】:TM303.3
【共引文獻(xiàn)】
相關(guān)期刊論文 前10條
1 鄧吟;林力;史亞杰;洪杰;;基于有限元素法的擠壓油膜動(dòng)力特性研究[J];北京航空航天大學(xué)學(xué)報(bào);2006年05期
2 洪杰;鄧吟;張大義;;彈性環(huán)式擠壓油膜阻尼器動(dòng)力設(shè)計(jì)方法[J];北京航空航天大學(xué)學(xué)報(bào);2006年06期
3 盧露;劉德志;魏克銀;;各向同性支撐結(jié)構(gòu)轉(zhuǎn)子的臨界轉(zhuǎn)速研究[J];船電技術(shù);2007年05期
4 王e,
本文編號(hào):2111549
本文鏈接:http://sikaile.net/kejilunwen/dianlilw/2111549.html
最近更新
教材專著