蘭新高鐵隧道運營安全風險評價及預(yù)警方法研究
文內(nèi)圖片:
圖片說明:圖1-2蘭州鐵路局管轄范圍內(nèi)沿線隧道分布圖逡逑Figure邋1-2邋Tunnel邋Distribution邋Map邋along邋the邋Railway邋within邋the邋Jurisdiction邋of逡逑
[Abstract]:In recent years, China Railway Corporation attaches great importance to railway safety risk management. Based on the requirements of high speed, high reliability and high safety of high-speed railway, China has put high-speed railway safety risk management in the most important position. Lanxin high-speed railway is the first high-speed railway built in the alpine plateau in China. Its geographical environment and natural environment are complex. 64 tunnels are distributed along the route, with a total length of 185.15 kilometers, accounting for 10.42 percent of the total length of the line. Due to the closure of tunnel structure space, the risk factors affecting tunnel operation safety are more hidden, complex and uncertain, which makes the operation safety risk management of Lanxin high-speed rail tunnel more challenging. How to evaluate and accurately warn the operation safety risk of Lanxin high-speed rail tunnel becomes an important work of Lanxin high-speed railway risk management. Firstly, this paper identifies, analyzes and standardizes the risk factors of Lanxin high-speed rail tunnel operation safety from four aspects of "human-material-management-ring", constructs the risk evaluation index system, and formulates the relevant standards of Lanxin high-speed rail tunnel operation safety risk grade assessment, such as risk possibility assessment, risk consequence serious grade assessment, risk grade assessment and risk grade acceptance criterion. Secondly, aiming at the problem of safety risk assessment of Lanxin high-speed railway tunnel operation, the evaluation index set and result set are constructed, the index weight is determined, the index membership function is constructed, and the two-level fuzzy comprehensive evaluation calculation model is established. Taking Gaojiashan Tunnel as an example, the model is divided into 64 200m long element grids for example, and the effectiveness and applicability of the model are verified. Thirdly, the classification of safety risk early warning grade, the evaluation standard of early warning index risk grade and the determination of risk early warning grade based on coupling superposition method are studied, the early warning information release flow based on information technology means is established, and the corresponding risk pre-control countermeasures of risk early warning index are put forward. Finally, the application of the research results of the paper is introduced: in the process of participating in the scientific research project of Lanxin High Speed Railway Engineering Safety risk Management system, the author applies the relevant research results to the development of tunnel operation safety risk assessment and early warning subsystem of the system, and completes the design and implementation of the system module.
【學(xué)位授予單位】:北京交通大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:U458
【參考文獻】
相關(guān)期刊論文 前10條
1 張偉偉;吳忠;;隧道綜合預(yù)警系統(tǒng)探析[J];中國交通信息化;2017年02期
2 楊婕;何國華;;隧道滲漏水病害成因分析及等級劃分標準[J];混凝土與水泥制品;2017年01期
3 何靜;李騰江;;地鐵運營預(yù)警評價指標系統(tǒng)的建立分析[J];現(xiàn)代城市軌道交通;2016年04期
4 盛光祖;;深入推進鐵路創(chuàng)新發(fā)展 為促進經(jīng)濟社會發(fā)展作出新貢獻——在中國鐵路總公司工作會議上的報告(摘要)[J];中國鐵路;2016年02期
5 肖小文;王立川;陽軍生;張學(xué)民;;高地應(yīng)力區(qū)緩傾互層巖體無砟軌道隧道底部隆起的成因分析及整治方案[J];中國鐵道科學(xué);2016年01期
6 巫志鵬;肖軍;岳遠林;;風險分析與風險評價方法綜述[J];安全、健康和環(huán)境;2015年12期
7 馬建;孫守增;趙文義;王磊;馬勇;劉輝;張偉偉;陳紅燕;陳磊;魏雅雯;葉飛;;中國隧道工程學(xué)術(shù)研究綜述·2015[J];中國公路學(xué)報;2015年05期
8 李世平;;風險矩陣法在鐵路隧道施工風險評估中的應(yīng)用[J];鐵路工程造價管理;2015年02期
9 童幫裕;;淺談蘭新高鐵開通機遇下沿線地區(qū)的發(fā)展[J];現(xiàn)代國企研究;2015年06期
10 江雨星;;蘭新高速鐵路旅客列車開行方案優(yōu)化研究[J];鐵道運輸與經(jīng)濟;2015年02期
相關(guān)會議論文 前2條
1 黃輝;;全路推行安全風險管理 確保運輸安全持續(xù)穩(wěn)定[A];第三屆鐵路安全風險管理及技術(shù)裝備研討會論文集(下冊)[C];2012年
2 周遵強;;鐵路營業(yè)線施工安全風險因素與研判初探[A];第三屆鐵路安全風險管理及技術(shù)裝備研討會論文集(中冊)[C];2012年
相關(guān)重要報紙文章 前2條
1 高俊;;鋼鐵“絲綢之路”的“智造”密碼[N];中國鐵道建筑報;2015年
2 ;新時期鐵路精神成為推動蘭州局改革發(fā)展的力量源泉[N];人民鐵道;2014年
相關(guān)博士學(xué)位論文 前4條
1 葛顏慧;巖溶隧道突水風險評價與預(yù)警機制研究[D];山東大學(xué);2010年
2 劉建軍;高速公路項目運營風險預(yù)警與控制研究[D];武漢理工大學(xué);2010年
3 賀志軍;山嶺鐵路隧道工程施工風險評估及其應(yīng)用研究[D];中南大學(xué);2009年
4 宋先鋒;大型土木工程國際投資風險研究[D];天津大學(xué);2003年
相關(guān)碩士學(xué)位論文 前10條
1 楊惠文;鐵路建設(shè)工程施工安全風險網(wǎng)格化管理及應(yīng)用研究[D];北京交通大學(xué);2015年
2 胡鑫;基于貝葉斯網(wǎng)絡(luò)的高鐵巖溶隧道風險分析[D];湖南科技大學(xué);2014年
3 李燕庭;鐵路建設(shè)工程風險分級標準研究[D];西南交通大學(xué);2014年
4 于辰成;基于BP神經(jīng)網(wǎng)絡(luò)的高速鐵路風險評價模型研究[D];西南交通大學(xué);2014年
5 佟鑫;困難艱險山區(qū)高速鐵路運營安全預(yù)警系統(tǒng)研究[D];西南交通大學(xué);2013年
6 袁旭冉;高速鐵路運營安全評價與預(yù)警對策分析[D];石家莊鐵道大學(xué);2012年
7 陳東柱;高速鐵路隧道襯砌裂縫病害及其整治措施研究[D];中南大學(xué);2012年
8 付可展;高鐵安全監(jiān)測系統(tǒng)的設(shè)計與開發(fā)[D];大連理工大學(xué);2010年
9 丁媛;物料輸送系統(tǒng)項目風險管理研究[D];中國海洋大學(xué);2010年
10 張慶峰;基于模糊網(wǎng)絡(luò)分析的隧道施工風險評價[D];重慶交通大學(xué);2008年
,本文編號:2511027
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2511027.html