軟巖大跨度公路隧道施工方法研究—三臺(tái)階法施工數(shù)值模擬及現(xiàn)場(chǎng)實(shí)測(cè)
[Abstract]:In this paper, taking a soft rock long-span expressway tunnel as an example, the excavation of the tunnel by three-step method is studied by using the whole test, numerical analysis and practical theory. the main work and conclusions are as follows: (1) the strength of surrounding rock is measured by point load meter, and the rock mass is measured by non-metallic acoustic wave. Determine the quality index of rock mass, determine the flow rate and structural area of groundwater. The quality of surrounding rock is studied and adjusted continuously to ensure that the correction of surrounding rock is classified according to the surrounding rock. The site point load and acoustic wave test are completed, and the field classification results of surrounding rock are completed. (2) considering the side guide pit excavation method and the three step method, the finite element numerical simulation model is established, and the finite element numerical simulation of soft rock roadway excavation is completed. The results of finite element numerical simulation show that the deformation of surrounding rock is small and the stability of surrounding rock is good. (3) finally, the supervision and quality inspection of the overall construction of soft rock tunnel are realized. The related contents show that the numerical results of tunnel surrounding rock deformation measurement are basically consistent with the finite element numerical simulation results, and the finite element numerical simulation results are credible. It is reasonable to choose the three-step construction method.
【學(xué)位授予單位】:湖北工業(yè)大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:U455.4
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 孫國(guó)凱;張成良;;公路隧道軟弱圍巖預(yù)留變形量的研究[J];公路;2016年02期
2 葉志華;王升;王冬魁;袁隆平;袁永才;;大跨度特長(zhǎng)隧道穿越煤系地層的防侵陷處治研究[J];公路工程;2016年01期
3 鄧博團(tuán);蘇三慶;任建喜;孟昌;;秦巴山區(qū)某軟巖公路隧道合理施工方法研究[J];西安科技大學(xué)學(xué)報(bào);2016年01期
4 何滿潮;;深部軟巖工程的研究進(jìn)展與挑戰(zhàn)[J];煤炭學(xué)報(bào);2014年08期
5 江勇順;李天斌;張廣洋;;山區(qū)高速公路隧道圍巖分級(jí)智能判別系統(tǒng)初探[J];現(xiàn)代隧道技術(shù);2013年05期
6 李生杰;謝永利;吳丹澤;朱小明;;穿越煤系地層隧道圍巖大變形機(jī)制及處治研究[J];巖石力學(xué)與工程學(xué)報(bào);2013年S2期
7 張優(yōu)利;劉勝春;梁順;周朋;楊克文;;隧道穿越斷層破碎帶關(guān)鍵技術(shù)研究[J];武漢理工大學(xué)學(xué)報(bào)(交通科學(xué)與工程版);2013年03期
8 馮曉光;任建喜;谷拴成;靳宏利;楊榮尚;楊國(guó)強(qiáng);鄧博團(tuán);張琨;;公路隧道圍巖現(xiàn)場(chǎng)快速分級(jí)方法研究[J];西安科技大學(xué)學(xué)報(bào);2013年03期
9 李書靜;;鐵路富水、破碎白云巖隧道施工方法探討[J];鐵道工程學(xué)報(bào);2013年01期
10 余存鵬;;明埡子軟巖隧道圍巖穩(wěn)定性評(píng)價(jià)[J];西安科技大學(xué)學(xué)報(bào);2012年06期
相關(guān)會(huì)議論文 前1條
1 楊成祥;馮夏庭;;變形預(yù)測(cè)的遺傳進(jìn)化算法[A];第八次全國(guó)巖石力學(xué)與工程學(xué)術(shù)大會(huì)論文集[C];2004年
相關(guān)博士學(xué)位論文 前1條
1 陳浩;地下工程圍巖與支護(hù)體相互作用的模型試驗(yàn)研究與理論分析[D];中國(guó)科學(xué)院研究生院(武漢巖土力學(xué)研究所);2008年
,本文編號(hào):2510583
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2510583.html