省道211線瓦斯溝至姑咱段改建項目的進(jìn)度與質(zhì)量管理研究
[Abstract]:The smooth road plays a very important role in improving people's living standards, facilitating people's travel and economic and social activities. The section from Wasgou to Guzan on the provincial road 211 is located between Vasgou and Gouzan town in Kangding County, Sichuan Province. Chengdu highway mileage is about 360 km, connected with national highway G318, provincial highway 211, traffic conditions are very important. In order to further improve the highway network of provincial trunk lines and improve the traffic conditions of Danba County and areas along the road, the section from Vasgou to Guzan of provincial highway 211 is proposed to be reconstructed. Based on the theory of project quality management and schedule management, this paper makes an optimization study on the progress and quality management of reconstruction project from Wasgou to Guzan Town on the 211 line of provincial highway. The main work is as follows: first of all, This paper introduces the project schedule management and project quality management, including its definition, main work contents and specific management methods. Secondly, it analyzes the general situation of the reconstruction project from Wasgou to Guzan Town on the 211 line of provincial highway, including the project profile, the quantity and conditions of the project construction, the construction target, the organization of the project, and the implementation of the project. This paper analyzes the progress problems existing in the project, including the cause analysis of the relative lag of the work progress in the pre-construction period, the low level of on-site quality management, the lack of quality control measures in place, and the blind pursuit of the project progress, which leads to obvious problems in the engineering quality, etc. And the existing problems in project quality management, including each sub-contractor in order to maximize profits, to reduce the quality required in the contract, which increases the difficulty of project control. The investigation work before the implementation of the project is not meticulous, the geographical location of the project, the corresponding regulations and policies, the impact of humanistic factors on the quality of the project, the impact of the project schedule on the quality of the project, and so on. Finally, using the methods of plan evaluation, critical path method, Gantt chart and so on, the progress of the reconstruction project from Wasgou to Guzao Town on the 211 line of provincial highway has been optimized, including re-progress planning and the decomposition of the work tasks of the project. Project activity sequencing and duration estimation. Project milestone plan, project schedule and Gantt chart, key route determination, etc. On the basis of detailed project schedule plan, the project progress plan monitoring, project schedule dynamic adjustment and project progress management safeguard measures are put forward, and the project progress plan monitoring, project schedule dynamic adjustment and project progress management safeguard measures are put forward on the basis of detailed project schedule. And to control the quality of the project: to establish the project quality assurance system, divided into ideological assurance system, organizational assurance system, objective management assurance system, production process quality assurance system, quality inspection assurance system, quality information assurance system. Economic guarantee system, to ensure the implementation of the project, ideological, organizational, economic, quality supervision and other omni-directional assurance. Improve project quality assurance measures, strengthen quality education, technical training, perfect quality information network, and from the process control measures, engineering materials control measures, construction operation control measures, etc. Project payment control measures and other multi-dimensional project quality control scheme.
【學(xué)位授予單位】:電子科技大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:U415.1
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 易兵;田北平;鐘華;;基于BIM-4D技術(shù)的項目進(jìn)度管理研究[J];價值工程;2015年21期
2 謝世偉;;建筑工程項目質(zhì)量管理研究[J];財經(jīng)問題研究;2015年S1期
3 梁劍東;屈杰;黃澤貴;;論項目質(zhì)量管理與組織構(gòu)架改進(jìn)[J];電子產(chǎn)品可靠性與環(huán)境試驗;2015年02期
4 馬東岐;;建筑工程項目進(jìn)度管理及控制技術(shù)[J];中國建材科技;2014年S2期
5 章春軍;呂曉琴;;基于質(zhì)量管理的大學(xué)生科技創(chuàng)新項目管理研究[J];中國科技論壇;2014年08期
6 王艷;;淺談建筑工程項目進(jìn)度管理[J];中小企業(yè)管理與科技(下旬刊);2013年11期
7 農(nóng)光東;;建筑工程項目進(jìn)度管理研究[J];東方企業(yè)文化;2012年10期
8 張建明;劉俊勇;;電力系統(tǒng)建設(shè)項目進(jìn)度3D可視化關(guān)鍵技術(shù)[J];電力自動化設(shè)備;2010年06期
9 林欣榮;;探討建筑工程項目的質(zhì)量管理[J];才智;2010年14期
10 周國華;韓姣杰;;“小業(yè)主大咨詢”模式下建設(shè)項目業(yè)主駐勤人員激勵監(jiān)督機制研究——以京滬高速鐵路建設(shè)項目為背景[J];管理評論;2009年12期
,本文編號:2466387
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2466387.html