采空區(qū)上方交通荷載作用下的路基沉降分析

發(fā)布時間:2019-04-25 19:13
【摘要】:在礦產(chǎn)資源豐富的地方,越來越多的公路不得不修建在采空區(qū)四周或穿越采空區(qū)。采空區(qū)會影響其上覆巖層的屬性,采空區(qū)道路在受到自重和外荷載作用會產(chǎn)生大面積的地表變形,進而引起路面開裂,嚴重時甚至出現(xiàn)大面積坍塌等破壞,影響公路的正常運營同時造成惡劣的社會影響。為保證采空區(qū)公路的正常運營,本文以河南某線采空區(qū)高速公路的修建和改建工程為背景,考慮交通荷載、采空區(qū)與路基相對位置等影響因素,分析采空區(qū)上方路基的沉降規(guī)律。本文的研究內(nèi)容和結(jié)論如下:(1)對采空區(qū)公路沉陷路段進行現(xiàn)場踏勘并鉆探取樣,結(jié)合實驗室分析得到巖層的分布情況,運用分層求和法對采空區(qū)路基沉降進行理論分析。(2)基于現(xiàn)場勘查來進行軟件模擬,針對有無采空區(qū)兩種狀態(tài),研究標準軸載作用下采空區(qū)上覆巖體的沉降變化規(guī)律。結(jié)果表明在動荷載作用周期內(nèi),采空區(qū)的存在加快了上覆巖體進入塑性變形的時間,而且越靠近采空區(qū)的巖層進入塑性變形的時間越短,反之越長。存在采空區(qū)時,上覆巖層沉降呈現(xiàn)出由減小到平穩(wěn)最后再次減小的過程,符合采空區(qū)三帶劃分。(3)改變采空區(qū)相對于路基在豎向和橫向上的位置,分析不同位置時標準軸載作用下的路基沉降規(guī)律。結(jié)果表明:當采空區(qū)深度在20~60m(路基水平面為0m)變化時,路基的沉降變化較大,60~80m時路基沉降無顯著變化;采空區(qū)橫向位置在-18~10m(道路右坡腳向右為正)時,路基的沉降急劇減小,10~15m時沉降變化緩慢。由此可確定標準荷載作用下采空區(qū)路基的臨界安全區(qū)域。(4)通過交通量調(diào)查確定該公路段上作用的重載,研究重載和標準軸載作用下采空區(qū)道路的路基沉降變形。結(jié)果表明重載作用下的采空區(qū)道路路基比標準軸載作用下的路基達到破壞的時間更短,而且產(chǎn)生的不均勻沉降量數(shù)值更大。因此對于采空區(qū)道路要注意對重載車輛進行限行。(5)選定現(xiàn)場沉陷較大的試驗段,埋設(shè)沉降觀測設(shè)備,對現(xiàn)場試驗路段進行路基沉降監(jiān)測,并將其與軟件模擬結(jié)果對比。結(jié)果表明:監(jiān)測數(shù)據(jù)與模擬結(jié)果變化趨勢一致。本文對采空區(qū)路基沉降的研究可用于前期采空區(qū)道路路線的規(guī)劃中,對采空區(qū)道路運營期間的維修和養(yǎng)護具有重要的參考意義。
[Abstract]:In mineral-rich areas, more and more roads have to be built around or across goaf. Goaf will affect the properties of overlying strata. Under the action of self-weight and external load, the road in goaf will cause large-area surface deformation, and then cause pavement cracking, even large-area collapse and so on. It affects the normal operation of the highway and causes bad social effects at the same time. In order to ensure the normal operation of the goaf highway, this paper takes the construction and reconstruction of the highway in the goaf of Henan province as the background, considering the influence factors such as the traffic load, the relative position of the goaf and the roadbed, and so on. The settlement law of roadbed above goaf is analyzed. The research contents and conclusions of this paper are as follows: (1) on-the-spot exploration and drilling sampling are carried out on the road subsidence section in goaf, and the distribution of rock strata is obtained by combining with laboratory analysis. The method of layer summation is used to analyze the settlement of roadbed in goaf. (2) the software simulation is carried out based on field survey, aiming at the two states of goaf or not, the law of subsidence change of overlying rock mass in goaf under the action of standard axial load is studied. The results show that in the period of dynamic loading, the existence of goaf accelerates the time for overlying rock mass to enter plastic deformation, and the closer it is to goaf, the shorter the time of entering plastic deformation, and vice versa. When there is goaf, the subsidence of overlying strata decreases from decreasing to steady and then decreases again, which accords with the division of three zones in goaf. (3) change the position of goaf relative to roadbed in vertical and lateral direction. The settlement law of roadbed under the action of standard axial load at different positions is analyzed. The results show that when the depth of goaf is 20 m 60 m (the horizontal level of roadbed is 0 m), the settlement of roadbed varies greatly, but the settlement of roadbed does not change significantly when the depth of mined-out area is 60 m. When the lateral position of the goaf is-18 ~ 10 m (the right foot of the road is positive), the settlement of the roadbed decreases sharply, and the settlement changes slowly at the time of 10 ~ 15 m. Thus the critical safe area of mined-out roadbed under standard load can be determined. (4) the heavy load acting on the highway segment can be determined by the investigation of traffic volume, and the settlement and deformation of roadbed in mined-out area under the action of heavy load and standard axial load can be studied. The results show that the failure time of roadbed in mined-out area under heavy load is shorter than that under standard axial load, and the value of non-uniform settlement is larger. Therefore, we should pay attention to traffic restrictions on heavy-duty vehicles in goaf roads. (5) select the test section with large subsidence on the spot, embed settlement observation equipment, monitor the roadbed settlement of the field test section, and compare it with the simulation results of the software. The results show that the trend of monitoring data is consistent with the simulation results. In this paper, the study of roadbed settlement in goaf can be used in the planning of road route in mined-out area, and it has important reference significance for maintenance and maintenance of road in goaf during operation.
【學(xué)位授予單位】:鄭州大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:U416.1

【相似文獻】

相關(guān)期刊論文 前10條

1 唐勇軍;;路基沉降的原因及處理措施[J];科技咨詢導(dǎo)報;2007年15期

2 王華凱;;公路路基沉降的成因與防治對策研究[J];黑龍江科技信息;2008年22期

3 仲先強;;高速公路路基沉降的多項式數(shù)學(xué)模型研究[J];山西建筑;2008年31期

4 王婧;;應(yīng)用非線性有限元軟件模擬路基沉降的研究[J];河南科技;2011年23期

5 王曉奇;;路基沉降因素與處理措施探討[J];科技資訊;2012年17期

6 丁勇;鄭傳昌;;有關(guān)高速公路施工路基沉降觀測及評價研究[J];交通建設(shè)與管理;2013年01期

7 豐偉;董喜燕;伍金理;代冰;;加寬路基沉降有限元分析[J];中國水運(下半月);2014年03期

8 裴亞強;;淺談高速公路施工路基沉降觀測及評價研究[J];企業(yè)技術(shù)開發(fā);2014年02期

9 費正華,鄧水明;應(yīng)用鄧肯-張非線性模型近似計算路基沉降[J];中南公路工程;2001年03期

10 馮金根;高速公路路基沉降觀測現(xiàn)場工作要點[J];筑路機械與施工機械化;2001年01期

相關(guān)會議論文 前7條

1 丁洲祥;龔曉南;李又云;謝永利;;應(yīng)力變形協(xié)調(diào)分析新理論及其在路基沉降計算中的應(yīng)用[A];中國土木工程學(xué)會第九屆土力學(xué)及巖土工程學(xué)術(shù)會議論文集(下冊)[C];2003年

2 葉楠;高金康;范厚彬;;無偏等維新息模型在拓寬路基沉降預(yù)測中的應(yīng)用[A];和諧地球上的水工巖石力學(xué)——第三屆全國水工巖石力學(xué)學(xué)術(shù)會議論文集[C];2010年

3 陳星光;;高速公路擴建路基沉降特性及其影響因素[A];第十屆中國科協(xié)年會論文集(四)[C];2008年

4 龔文惠;雷紅軍;寧虎;;基于誤差傳播理論的膨脹土路基沉降可靠度分析[A];第九屆全國巖石力學(xué)與工程學(xué)術(shù)大會論文集[C];2006年

5 呂紅松;;貴州省道212線K355前后段路基沉降治理[A];開拓進取 再創(chuàng)輝煌——貴州省公路學(xué)會2008年技術(shù)交流論文集[C];2008年

6 向一鳴;凌桂香;杜鑌;;背景值優(yōu)化的MGM(1,n)模型在路基沉降預(yù)測中的應(yīng)用[A];貴州省巖石力學(xué)與工程學(xué)會2013年學(xué)術(shù)年會論文集[C];2013年

7 楊滕;張嫻;韓波;;基于ABAQUS動荷載作用下路基沉降數(shù)值模擬分析[A];2013年2月建筑科技與管理學(xué)術(shù)交流會論文集[C];2013年

相關(guān)重要報紙文章 前3條

1 本報記者  李學(xué)平 梅寧生 通訊員  呂金蓉;寧夏:錢少照樣修好路[N];中國交通報;2007年

2 記者 楊偉鳴 通訊員 戴紹火;湖北杭瑞提前建成156公里[N];湖北日報;2010年

3 本報記者 范玉蕾 通訊員 王建勛 田旭;筑精品工程 為國慶獻禮[N];石家莊日報;2009年

相關(guān)博士學(xué)位論文 前3條

1 楊婧;路基沉降全方位監(jiān)測方法與技術(shù)的研究[D];北京交通大學(xué);2014年

2 金生吉;高填方多級擋土墻路基沉降規(guī)律與穩(wěn)定性數(shù)值模擬研究[D];東北大學(xué);2009年

3 李國恒;季凍區(qū)填土路基沉降預(yù)測及其附加應(yīng)力分析[D];吉林大學(xué);2013年

相關(guān)碩士學(xué)位論文 前10條

1 周濤;采空區(qū)上方交通荷載作用下的路基沉降分析[D];鄭州大學(xué);2017年

2 劉昕雨;廣珠城際鐵路運營期路基沉降的時參反演分析[D];西南交通大學(xué);2015年

3 張堯;高速公路路基沉降遠程監(jiān)測系統(tǒng)設(shè)計[D];長安大學(xué);2015年

4 張明;路基沉降遠程監(jiān)測系統(tǒng)的研制[D];西安工業(yè)大學(xué);2015年

5 郭鑫;湖相沉積軟土地區(qū)高速公路路基沉降規(guī)律研究[D];石家莊鐵道大學(xué);2015年

6 胡偉松;京滬高速鐵路滄州西站沉降及整治研究[D];中國鐵道科學(xué)研究院;2015年

7 張建偉;地鐵隧道下穿既有線地表沉降風險監(jiān)控研究[D];北方工業(yè)大學(xué);2016年

8 郝瑩瑩;基于公路下伏采空區(qū)相對位置的路基沉降研究[D];鄭州大學(xué);2016年

9 辜永超;路基沉降條件下無砟軌道整治措施研究[D];西南交通大學(xué);2015年

10 趙國慶;鋼花管注漿法在石太線路基沉降病害處治中的應(yīng)用分析[D];西安科技大學(xué);2015年

,

本文編號:2465386

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2465386.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶89755***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com